Electrical Engineer à HTI Engineering India (P) Ltd
  • Inde - Chennai
  • Je travaille ici depuis juillet 2005

Design and engineering of Hyundai Motors India Ltd., (Phase-II comply with 230kV
GIS, Engine shop, Foundry shop, Chip Treatment, Dynamo shop, paint shop),
Chennai. Responsibility involves Preparation HV and LV SLD, Feeder list.
Preparation HV and LV Cable sizing calculation, Load schedule. Performing Lighting
Calculation and lighting distribution & lighting SLDs. Preparation of Earthing &
Lightning calculation and review of their layouts. Review of Trench sizing calculation,
Tray sizing and Loading calculation. Review of Civil Input related to concrete and
steel quantity. Review of installation drawings.

Electrical Engineer à Petrofac Engineering Services India Pvt Ltd
  • Inde
  • Je travaille ici depuis juin 2008

Tinrhert field development project for Sonatrach, Algeria. The project was an onshore
Separation and Boosting facility and the EPC contractor was Petrofac, UAE.
✓ The work involved preparing technical specifications, Data sheet, Material
Requisition, Technical queries to vendor and their technical bid evaluation,
issuing Purchase Order for LV Switchgear, Power & Distribution transformer
and Neutral earthing resistor.
✓ Vendor drawing review of LV Switchgear, Power & Distribution transformer
and Neutral earthing resistor.
✓ Load schedule, Cable schedule, Interconnection schedules, Solar power
Load list for Well heads using Aveva.
✓ Review of mechanical packages Nitrogen generation, Compression package
with thyristor control panels, Cranes, Low energy centrifugal pumps.
❑ Turkstream-RT & onshore pipelines construction project for South stream transport
B.V, Turkey. The project was an onshore gas receiving terminal and the EPC
contractor was Petrofac, UAE.
✓ The work involved preparing technical specifications, Data sheet, Material
Requisition, Technical queries to vendor and their technical bid evaluation,
issuing Purchase Order, Vendor drawing review of HV and LV Cables,
Electrical Distribution Board, Lighting fixtures, Local control stations, Junction
Boxes, Cable Gland, Cable trays, Earthing and lightning protection materials.
✓ Performed HV & LV Cable sizing calculation, Earthing and lightning protection
calculation, Lighting calculations and providing inputs for preparing single line
diagram.
✓ Cable schedules, drum cutting schedule,
✓ Interface Coordination of Buildings with subcontractor.
❑ Upper Zakum UZ750 island surface facility Project for Zakum Development
company, Abu Dhabi. The project was an offshore (Artificial island) oil production
and the EPC contractor was Petrofac, UAE. \[Secondment to Fabrication yard -
China\]
✓ The work involved preparing Specifications, Data sheet, Technical Requisition
and Purchase Order for Distribution boards/Bulk materials/ Modular electrical
buildings and their technical bid evaluation, Vendor drawing review.
✓ Co-ordination with Vendors and Client, Co-ordination with Sub Contractors,
Providing engineering assistance for modular building fabrication including
installation/commissioning of different switchgear like 33kV Gas insulated
switchgear (GIS), 6.6kV air insulated switchgear (AIS), 400V LV switchgear,
DC/AC UPS, DB’s/Transformers, Provide clarifications/guidance/technical
Page 3 of 4
support to construction /commissioning team to resolve site issues, Client
concerns.
❑ ALRAR Project for SONATRACH (EPC), Algeria. The project was an onshore inlet
separation and Boosting facilities and the EPC contractor was Petrofac, UAE.
✓ The work involved preparing Specifications, Data sheet, Technical Requisition
and Purchase Order for NER and their technical bid evaluation and their
Vendor drawing review.
✓ Also prepared Heat load calculations for HVAC design input.
❑ Jazan project, Saudi Aramco (EPC), Saudi. The project was an onshore refinery and
marine terminal, and the EPC contractor was Petrofac, UAE.
✓ The work involved Preparation of Specifications, Data sheet, Technical
Requisition and Purchase Order for electrical distribution board and their
technical bid evaluation.
✓ Performed lighting calculation with AGI32 software and involved in heat
tracing design.
❑ Dragon oil project, The project was an modifications in offshore wellhead platforms
and the EPC contractor was Petrofac, UAE. \[Secondment to Turkmenistan -
Offshore platform\]
✓ Data collection from offshore platforms for modifications.
✓ Replacement of Distribution boards and associated LV cables.
❑ Kashagan Field Development - Experimental program project, Agip KCO (EPC)
\[Secondment to Kazakhstan\]
✓ Responsible for preparation of Heat tracing design calculation, Load list and
their circuit schedules and cable schedules. Review of heat tracing isometrics
and P&ID.
❑ Gas Sweetening facilities at Mesaieed-SRU & Dukhan-AGRP project, Qatar
petroleum (EPC),
✓ Preparation of Cable schedule & inter-connection schedule. Review of
substation Equipment layouts/Lighting/Earthing/Cable routing layouts.
Proposal/Pre-Bid work involved
❑ Performing various electrical equipment’s sizing calculation for major like
Transformers/Generator/UPS/Batteries/Heat load based on the project requirement.
Vendor offer review for above mentioned various Equipment’s/modular electrical
buildings, Material selection based on Hazardous area classification layouts, Cable
Trench Layouts, Cable tray Layouts, Bus duct arrangement, Earthing Layouts,
Lighting layout, Panel arrangement layout. Co-ordination with other discipline for
Civil/Instrument/Telecom/Mechanical/Process inputs. Preparation of Bill of material
for bulk items and support to procurement for following Bids.
✓ Petronas Rapid project, Petronas.
✓ Uzbekistan Gas to Liquid Project.
✓ MGC Revamp Project, KOC.
✓ New AGRP, Fourth Gas Train Project, At mina al-Ahmadi, (KNPC).
✓ NGHI son Refinery & Petrochemical (NSRP) Complex project, Vietnam.
✓ Ruwais refinery expansion project, Abu Dhabi.
✓ Bir El Msana (BMS) Development Project, Algeria

Éducation

Baccalauréat, Electrical and Electronics Engineering
  • à SRM College of Engineering
  • avril 2011

I have passed out in First class with distinction

Diplôme, Electrical and Electronics Engineering
  • à Central University Of Tamil Nadu
  • avril 2004

I have completed my Engineering First class with Distinction

Specialties & Skills

Classification
Extraction
Metering
Preparation
CABLING
CUSTOMER RELATIONS
DATA COLLECTION
LAYOUT DESIGN
LIGHTING
MATERIALS MANAGEMENT

Langues

Anglais
Expert

Formation et Diplômes

Aveva Electrical (Formation)
Institut de formation:
Aveva
Date de la formation:
March 2021
Durée:
40 heures

Loisirs

  • Reading Books