seyed amir jahani,  Projects manager

seyed amir jahani

Projects manager

Rahbord Energy

Lieu
Iran
Éducation
Baccalauréat, Civil Engineering
Expérience
30 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :30 years, 10 Mois

Projects manager à Rahbord Energy
  • Iran
  • Je travaille ici depuis mars 2018

MD consultant and managing project managers for engineering projects and also engineering part of EPC projects to be done on time and on a budget

Project Engineer Manager à Jondishapour co
  • Iran
  • mai 2017 à mars 2018

Engineering head for the following projects:

 Fajr petrochemical company
o ABS / Rubber plant EPC project, (240 mm Euro )

 Qeshm oil plant completion EPC project

Business Development Manager à Rahbord haye hooshmand
  • Iran
  • novembre 2016 à mai 2017

Business development & Tenders Manager

Project manager à Rahbord haye hooshmand
  • Iran - Tehran
  • octobre 2008 à novembre 2016

Share holder and Project manager for offshore projects
 Hengam EPC project, (Brown Field)
(98 mm Euro)
Construction and installation of 3 offshore topside well head platform. 3 x 2500 ton, Including helideck, main deck, cellar deck and drain deck.
And Construction and installation of Infield subsea pipeline for the platforms, 14”oil + 4.5” MEG piggy back, 1400 + 2700 meter long, including tie-in spools (21 pieces) plus retrofit risers (8 x 4.5” + 2 x 14”), 70-75 meter water depth. This part of job was done by C-Master pipe lay barge for laying. Riser & spool installation was done by DULAM diving co. (UAE)
And 2x45 km submarine cable from offshore to onshore (procurement stage).Client, Iranian Offshore Oil Company

 Foroozan offshore complex. (Brown field) EPC project.,
(138 mm Euro including 7.8 mm Euro for engineering part )
Engineering (Basic & detail) for renovation and reconstruction of 5 existing offshore platforms, 2 wellhead, 2 production & one LQ, plus 2 new LQ modules, Basic engineering was done by Ranhill Worley Parsons, RWP, detail design done by ISI engineering inhouse team.
Client, Iranian Offshore Oil Company.

 Kharg Island Gas gathering & NGL recovery - Export jetty top side, EPC project - completed.
Engineering (Basic & detail) of jetty for export of condensate, pentane and LPG, sea water intake (56, 000 m³/day) and 2 km pipe rack (24 pipe 6”- 36”)

Project manager à Paravar consultant engineering co
  • Iran
  • août 2006 à octobre 2008

Project Manager for engineering part of the following projects:

 Cheshme khosh wellheads facilities, infield and export pipelines (EPC)
EPC of 4 production, 2 injection wellheads facilities and 19 km 6", 12 km 8", 60km 10" pipelines.

 Salman fire water system. (Brown field) Revamping.
Engineering of Salman offshore complex (8 platforms) for revamping of existing fire water system.

Project coordinator / Project Manager à Iranian offshore oil co.
  • Iran
  • octobre 2001 à août 2006

Aboozar subsea pipeline project
Construction and installation of 24" main oil export pipeline, 80 km in offshore / 1.5 km onshore. Including top side tie in, new retrofit riser, spool pieces and also shore pulling.
Designed by J P KENNY & laid by Valentine Maritime Co. UAE.

Project coordinator for following projects:

•Kharg Island gas gathering and NGL recovery project
•Construction and installation of 2 Gas compressor platform that were installed by float over method.
•Construction and installation of 175 km subsea gas pipeline, 26” to 12”
Designed by J P KENNY & laid by Valentine Maritime Co. UAE.


•Sirri subsea pipeline projects.
•Construction and installation of 12” subsea pipeline from Sirri Island to Kish Island, 105 km app.
•Construction and installation of 12” subsea pipeline from Sirri Island to Qeshm Island, 95 km app.
Project was done by SAIPEM.

•FEED study of Sirri island gas gathering and NGL recovery projects,
Which was down by John Brown Hydrocarbon & CBI Co.

•FEED study of Kharg island gas gathering and NGL recovery projects,
Which was down

Field engineer à Offshore Engineering & Construction Company (IOEC)
  • Iran
  • juillet 2000 à octobre 2001

Pipe laying of 32” submarine pipeline and SBM installation of south pars gas field development (Phase 1) project.

•Subsea cable & pipe laying of ABOOZAR development. 10”, 12”, 16”, 18” and 24” submarine pipeline with 45 km long and 55km submarine cable, project .

•Load out of concrete coated pipeline of south pars gas field development Phases 2 & 3 (56 shipment of 32” and 4”) project.

•Supervisor of ABOOZAR-1200 (derrick lay barge) during conversion

Project Engineer à Iranian Offshore Oil Co.
  • Iran
  • août 1995 à octobre 2000

Project Engineer for offshore and onshore projects

Site engineer
  • août 1993 à août 1995

120 km, 20” buried gas pipeline (onshore) project from Tabriz to Azarshahr,

Éducation

Baccalauréat, Civil Engineering
  • à Ferdowsi University
  • janvier 1993

Specialties & Skills

Offshore
Pipelines
Onshore
MICROSOFT WINDOWS 98
PROCUREMENT
MS office

Langues

Anglais
Moyen
Persan
Langue Maternelle

Loisirs

  • walking, Watching movies,