Position:Lead Mechanical Engineer (Technical and Construction) Project: - Greek Village Project - Marassi North coast Egypt
• Reviewing design of towers, villas and retails.
• Managing, controlling and supervision of contractors contracts and site installations.
• Coordination of mechanical works and infrastructure design with other trades.
• Coordination with the client for properties technical requirements as design inputs.
• Reviewing equipment and material submittal
• Coordination with district cooling company for demanded load, flow rate and allocated loads Projects Handled:
• Gewan Island development of infrastructure and residential building.
• Giardino Mall.
• United International School.
• Floresta Gardens Infrastructure and 3 gated compounds
• Giardino village infrastructure.
• Multiple towers and villa as developed by others.
Project Handled: Presidential guest house hotel, Libya Project type/value: Design Built - USD$ 180, 000, 000 Responsibilities:
• Managing the MEP works in a presidential hotel among design build contract by supervising 6 subcontractors engineering work, construction, payment, cost control, claims and achieving satisfaction of client consultants
• Ensuring that the project MEP works contracts are being carried out in accordance with the required quality, cost and time constraints.
• Coordination between technical work of subcontractors.
• Checking of MEP valuations correspond with progress
• Controlling of the project budget
• Review of materials and equipment submittals
• Material Procurement, handling and control.
following projects
• Mansoura Cancer Hospital (LE 60, 000, 000)
• Marriott Golden view Sharm, Esheikh (LE 150, 000, 000)
• Iberotel Grand Sharm Elsheikh (LE 140, 000, 000)
• T3A Pharmaceutical factories (LE 200, 000, 000)