QC E&I Inspector
Snc Lavalin
مجموع سنوات الخبرة :0 years, 0 أشهر
Role: •Monitoring of site electrical and instrumentation activities to insure that the work is being carried out as per standard, Project Quality Plan and client requirements SAES, SAEP, SAMSS, SAIC, SATIP & SATR.
•Inspection and Verification of underground & exposed conduits, cable laying & wiring, grounding system, installation of electrical panels, motor control center (M.C.C.) & junction boxes for hazardous locations, Installation of instruments, Termination of power control & instruments, cables to monitor daily accomplishment electrical crews and raising technical query (T.Q.) and also to issue request for inspection (RFI) on finished jobs after first checking that all work had been carried out in accordance with the relevant Codes and Standards and submitting relevant Checklists.
•Preparation of Electrical test packages
•Preparation of Electrical Documentations
•Installations of Electrical panels.
•Monitoring of site electrical and instrumentation activities to ensure that the work is being carried out as standards, project Quality plan and client requirements.
•To conduct cable testing / grounding resistance test.
•Responsible for preparation of documents packages.
•Working pre energized and energized for well head Gas & Oil
•Working pre commissioning and commissioning for well head Gas & Oil
•Working test ground for well head Gas & Oil
•Check preparation and installation anode in anchors and all pipe line
•Check voltage for test station & bounding in all pipe line
•Working testing for switch rack for WSD well head shutdown (Manual Transfer Switch MTS, Distribution Panel DP, Transformer, Air blower starter control panel four hour run test, Temperature test & Vibration test, Lightning Panel, Instrument Power Panel, Corrosion Inhibitor starter control panel, WSD panel, Battery Charger Breaker test…), Battery charging & discharging, Receptacle polarity test & phase sequence, Torque test, Illumination test, Instrument tube Leak test.
•Check installation LV low voltage for PC power cable, IC instrument cable,
•Check installation for cathodic protection in main power & cellar in well head Gas & Oil.
•Check all instrumentation is WSD, CHOCK VALVE, CELLAR EQUIPMENT
•Installation & inspection of flow meter transmitter(FM), pressure transmitter(PT), pressure &differential(PI), level transmitter, temperature transmitter(TI) & receiving type instrument.
•Control out, surveillance inspection on site construction works like installation of instruments and their process connections.
•Prepare then perform instrument loop checks for pre commissioning of instrument loop testing.
•Inspection and surveillance of construction work concerning all Electrical / Instrumentation as per Saudi Aramco Engineering Standard, Engineering Drawing & IFC Drawing.
Project: KHUFF GAS PROJECT
Role: •Review plant drawing and scope of work in accordance with project specification and standards
•Preparation/arrangement of SAIC and SATR and maintaining e log in electronics data
•Inspection of cable trench prior to cable pulling
•Inspection of cable for their physical appearance, meggering and continuity testing prior to cable pulling and termination
•Witness inspection the calibration of instrumentation instruments prior to installation
•Conduct inspection leak testing of instrument tubing
•Verifying and reviewing of loop folder prior to loop checking
•Prepare inspection checklist for electrical instrument activities
•Conduct internal inspection of all instrument JB’s and verifying of document
•Prepare E&I forms and send it to*** the Construction Manager for his inputs and the receiving the same coordinate with client to obtain a final sign off and go ahead from the client.
•Prepare QC documents for review by the QC Coordinator which is finally handed over to the client
PENTAGON SYSTEMS AND AUTOMATION
in
This course covers Installation/Maintenance/Calibration of Process control Instruments On-line Calibration of Transmitters &Control valve/, field instrumentation documents P&ID and PLC Programming using Ladder for PLCs .and different type of plcs