Shah Nawaz Ali, Associate Engineer

Shah Nawaz Ali

Associate Engineer

Sui Northern Gas Pipelines Limited.

Lieu
Pakistan - Peshawar
Éducation
Baccalauréat, Bachelor of technology in civil
Expérience
17 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 1 Mois

Associate Engineer à Sui Northern Gas Pipelines Limited.
  • Pakistan - Peshawar
  • Je travaille ici depuis janvier 2018

Directly responsible on all engineering, planning, materials and all other technical services essential to support the construction and installation of activities • Review project planning with a view to improve on the completion date • Supervise the SNGPL Activities. • Ensuring that the project progress is exactly according to the drawings provided. • Checking the quality of work and materials. • Preparation of detailed progress reports. • preparation of Technical Feasibility report, pipe sizing required Metrages, street width, street clearance, No of Houses. • preparation of Material List and Material Required (MR) for new JOB. • Check the status of the soil, Detail of Layout plain, Length of pipe, privately developed 100 %cost. • Check the EGM Dia, and propose Gas main length of pipe and Dia, Draw sketch of applicant House check setup Date, Check in DLM or ATLAS plan. • Dawn of a new ERA Prime Minister Inaugurates the Largest ever Transmission Augmentation project for Re-Gasified Liquified Natural Gas (RLNG) Supply. prime Minister Shahid Khaqan also announced that two million gas connections would be given by June 2018. Chairman, SNGPL Board of Directors (BOD), Saeed Mehdi while appreciating SNGPL Team on successful completion of the project said that the Company Executives and staff accepted the challenge of constructing such a Huge pipeline Network and completed it within the given time frame by utilizing indigenous expertise and resources. while sharing technical aspects of the project, he said that SNGPL completed installation of 35, 100 HP compression and 1, 044 kilometer pipelines 0f 16 inch to 42 inch diameter downstream of sawn under the project. He added that the History of Pakistan this was for the first time that 42 inch dia pipeline was constructed with indigenous expertise. • The project would help in accelerating economic growth of the country as well as CPEC, s early harvest projects by fulfilling their energy requirement. • Check the status of the soil, Detail of Layout plain, Length of pipe, privately developed 100 % cost. Upon mechanical completion of a line, joint inspection of Dev, QA and corr-control representative to be carried out before testing/ Commissioning. • All discrepancies pertaining to a line should be rectified before testing. Punch lists must be prepared then and to be signed by representative of each section. In case of site constraints or changes in line Drawings etc, Necessary approval of competent authority should be taken. • Eng, r Amir Mouqam Advisor to prime Minister of Pakistan regarding provision of Gas to the following wherein we have carried out survey of the above premises which reveals that the following Meter ages is required in the publically Developed localities. 1 inch dia 1450 mtr, 2 inch dia 1700 mtr and No of Houses 105. Palocy khat kally sindanay Ska kot MKD, Mohabat khan kally Ska kot, Gul mouqam kally ska kot, Gul Ghafoor kally koper ska kot MKD. Short service and Long service Direct Deal with sn. Engineer. Combing and Extension cases deals with Regional Manager (Mardan Region)

Site Engineer à Wisal Muhammad Khan contractor
  • Pakistan
  • octobre 2012 à octobre 2015

Supervision of all site activities as per engineering and standard guide lines.  Carried out the main foundation and iron frame work following the high level of standard procedures.  Ensuring that the project progress is exactly according to the drawings provided.  Checking the quality of work and materials.  Preparation of detailed progress reports.

site engineer à OXFAM GB (World famous UK based NGO)
  • Pakistan
  • septembre 2010 à septembre 2012

Design, plan and lead a WASH needs assessment as part of a multi-sector program  Manage or co-facilitate an Oxfam or inter-agency WASH assessment using WASH Cluster or Oxfam assessment tools, customized for context.  Preparation of technical report for the infrastructure projects includes assessment for need identification and site selection as per criteria.  Preparation of BOQ’s for the Flood proofing and New infrastructure at community  Supervision of all the site and guide the team according to the engineering guide lines.  Was responsible for the infrastructure documentation along with daily weekly and monthly reports.  Taking any required step in close consultation with the project manager to ensure useful implementation of the project.  Develop context specific WASH indicators and design a comprehensive PHE monitoring strategy and plan.  Lead the design, management and communication of a responsible exit strategy  Recruit and manage (direct & matrix management) large staff teams which work coherently in a multi-sector program over dispersed geographical locations  Liaise with donors, write quality funding proposals that got funded  Conducting relief activities surveys, rehabilitation design, field implementation  Verification of the appropriate standard materials used in relief activities  Conduct any other programming responsibility delegated by the supervisor  Lead on program quality to ensure that PHE activities meet Oxfam and international humanitarian standards  Supervise and coordinate field teams to ensure coherent and consistent programming  Ensure flexible modalities for working with partner which reflects their capacity and experience Conduct assessment, planning, implementation and evaluation as one core team, encompassing EFSL, PHP, PHE, Logistics personnel  Influence and support WASH coordination by providing leadership at provincial level to strategic technical initiatives within the WASH Cluster.

Site Engineer à American Refugee Committee
  • Pakistan - Peshawar
  • octobre 2009 à septembre 2010

Directly responsible on all engineering, planning, materials and all other technical services essential to support the construction and installation of activities  Review project planning with a view to improve on the completion date  Supervise the Watson Activities  Conducting relief activities surveys, rehabilitation design, field implementation  Verification of the appropriate standard materials used in relief activities  Work in close coordination with all key stakeholders including Government authorities, community leaders, beneficiaries, partner organizations, and other providers of emergency relief  Ensure timely and efficient monitoring and evaluation of project activities  Co-ordination meetings with UNICEF & UNHCR and share meeting minutes with management accordingly.  Conduct any other programming responsibility delegated by the Supervisor

Consultant à Water and power authority
  • Pakistan
  • décembre 2000 à janvier 2005

Managing the Field activities  Working on Tunnel excavation  Supervision of Rock Bolting swelex & SN  Supervision of wire mishing & bed concreteing  Installation of 3.1 diameter steel pipe liner also test (D.P) & ultrasonic test of steel pipe liner.  Preparation of progress report

Site Engineer à Swabi scarp consultants WAPD
  • Pakistan
  • février 2000 à juin 2000

Managing all the field activities.  Working on MRDP Malakand tunnel excavation project.  Supervision of wire meshing on wall and bed concreting.  To check the quality of works material and work man ship

Supervision à of Rock
  • à

* Supervision

Éducation

Baccalauréat, Bachelor of technology in civil
  • à Preston university Islamabad
  • juillet 2009

Number of courses passed 13 , Number of courses required for degree 13. This degree has been issued under authorized signatures and official seal of the university on this fifteen day of 2009. Thanks and Regards

Diplôme, Civil
  • à Technical Board Peshawar
  • janvier 1999

* Bridge/ Highway, airport and irrigation Engineering. * Soil Mechanics * Hydraulics and hydrology. * Surveying leveling.

Specialties & Skills

ASSETS RECOVERY
COMMUNICATION SKILLS
CONFLICT MANAGEMENT
CONSULTING
ENGINEERING
MANAGEMENT
MATERIALS MANAGEMENT
MICROSOFT POWERPOINT
MICROSOFT WINDOWS 2000

Langues

Anglais
Moyen
Urdu
Langue Maternelle