Total des années d'expérience: 18 Années, 4 Mois
juillet 2011
A À présent
Project Engineer
à Saudi Electricity Company
Lieu :
Arabie Saoudite - Dammam
Role:
-; Proposing base design for the sub-station as per IEEE, IEC, SEC Std. involving the following aspects of base design:
Ampacity Calculation, Grounding Calculation (Step Voltage & Mesh Voltage), Sheath Voltage Limiter (SVL) Selection, Surge Arrestor Rating, NGR Sizing, Transformer Sizing, Capacitor Bank & Detuning Reactor Sizing, Short Circuit Rating, Number of incoming & outgoing breakers
-; Validating the base design through analysis like Load Flow Analysis, Contingency Analysis and Short Circuit Analysis for Ultimate, Maximum or Minimum Fault Level and Dynamic Analysis
-; Leading all activities related to:
Reliability calculation of sub-stations
Project technical specification, detailed scope of work review, checking the BOQ, estimation and creation of Scope of Work, Power Supply Implementation Agreement & Memorandum of Understanding (MoU)
-; Preparation of 5 years Capital Budget Plan, 10 years Capital Budget Plan and Load Capacity Analysis for Bulk Supply Point (BSP) & sub-stations
-; Developing & maintaining strong channels of communication with different divisions & other government entities
-; Drafting the cost estimate / revised project cost estimates of the project
-; Liaised with contractor and different departments of the company / outside company so that project can be completed on time
-; Rendering technical assistance / support to various work teams to increase the work pace
-; Working on various system studies (Root Cause Analysis) of different issues faced by SEC network such as:
Methods to enhance short circuit capacity of the sheath of Underground Cable
Appropriate value of the Detuning Reactor installed in series with Capacitor Bank
Causes for the Failure of the Capacitor Banks installed in the SEC Network
Motor starting issue in one of the plant in Jubail (customer owned)
Voltage regulation of the underground cables
Low voltage problem in Waad Al-Summan Area
Highlights:
-;Overcame economic, technical challenges during the completion of Jubail Substation diversion project
-; Implemented several measures to identify deformities or abnormalities like Sheath Sizing, Short Circuit Calculations
-; Recognized for increasing in-process capability by implementing revised detuning reactor value; appreciated for the same
-; Pivotal in streamlining processes through measures such as direct co-ordination with the Consultants, Contractors
-; Proposing base design for the sub-station as per IEEE, IEC, SEC Std. involving the following aspects of base design:
Ampacity Calculation, Grounding Calculation (Step Voltage & Mesh Voltage), Sheath Voltage Limiter (SVL) Selection, Surge Arrestor Rating, NGR Sizing, Transformer Sizing, Capacitor Bank & Detuning Reactor Sizing, Short Circuit Rating, Number of incoming & outgoing breakers
-; Validating the base design through analysis like Load Flow Analysis, Contingency Analysis and Short Circuit Analysis for Ultimate, Maximum or Minimum Fault Level and Dynamic Analysis
-; Leading all activities related to:
Reliability calculation of sub-stations
Project technical specification, detailed scope of work review, checking the BOQ, estimation and creation of Scope of Work, Power Supply Implementation Agreement & Memorandum of Understanding (MoU)
-; Preparation of 5 years Capital Budget Plan, 10 years Capital Budget Plan and Load Capacity Analysis for Bulk Supply Point (BSP) & sub-stations
-; Developing & maintaining strong channels of communication with different divisions & other government entities
-; Drafting the cost estimate / revised project cost estimates of the project
-; Liaised with contractor and different departments of the company / outside company so that project can be completed on time
-; Rendering technical assistance / support to various work teams to increase the work pace
-; Working on various system studies (Root Cause Analysis) of different issues faced by SEC network such as:
Methods to enhance short circuit capacity of the sheath of Underground Cable
Appropriate value of the Detuning Reactor installed in series with Capacitor Bank
Causes for the Failure of the Capacitor Banks installed in the SEC Network
Motor starting issue in one of the plant in Jubail (customer owned)
Voltage regulation of the underground cables
Low voltage problem in Waad Al-Summan Area
Highlights:
-;Overcame economic, technical challenges during the completion of Jubail Substation diversion project
-; Implemented several measures to identify deformities or abnormalities like Sheath Sizing, Short Circuit Calculations
-; Recognized for increasing in-process capability by implementing revised detuning reactor value; appreciated for the same
-; Pivotal in streamlining processes through measures such as direct co-ordination with the Consultants, Contractors
juillet 2010
A mai 2011
Electrical Engineer (Design)
à Radicon Gulf Consult
Lieu :
Arabie Saoudite - Khobar
Role:
-; Developed 2 electrical pumping stations and 4 storage facilities at the stretch of 470 Km pipeline to manage sweet water all the way from Taif to Ad-Dhuhi (nearby Riyadh for the government client)
-; Created the Electrical Emergency System including Generator Sizing, Solar Panel Sizing (for remote facility) and Battery Bank Sizing
-; Drafted Single Line Diagrams & Equipment Layout Diagrams for 2 Pump Stations and storage facilities; proposed Generators for generating electricity as there was no electrical power supply to those locations
-; Devised the cable routing drawings and duct bank drawings
-; Designed electrical grounding network for aforementioned facilities
-; Worked on standards like National Electric Code (NEC), Saudi Electricity Company Standards, IEEE and IEC
-; Validated the modelling of Design Aforementioned Pumping Station & Storage Facilities Electrical System using ETAP (Load Flow Analysis, Short Circuit Analysis and Motor Starting Analysis)
-; Facilitated the designing & sizing of electrical cable to feed the electrical power from source sub-station to the client sub-station and design the electrical system downstream (the client sub-station were furthermore developed the Fire Alarm System) using SABIC, Royal Commission and SEC standards
-; Checked the design with ETAP by conducting Load Flow Analysis, Short Circuit Analysis & Motor Starting Analysis
-; Executed General Engineering Services Projects of Saudi Aramco using Aramco standards
-; Developed 2 electrical pumping stations and 4 storage facilities at the stretch of 470 Km pipeline to manage sweet water all the way from Taif to Ad-Dhuhi (nearby Riyadh for the government client)
-; Created the Electrical Emergency System including Generator Sizing, Solar Panel Sizing (for remote facility) and Battery Bank Sizing
-; Drafted Single Line Diagrams & Equipment Layout Diagrams for 2 Pump Stations and storage facilities; proposed Generators for generating electricity as there was no electrical power supply to those locations
-; Devised the cable routing drawings and duct bank drawings
-; Designed electrical grounding network for aforementioned facilities
-; Worked on standards like National Electric Code (NEC), Saudi Electricity Company Standards, IEEE and IEC
-; Validated the modelling of Design Aforementioned Pumping Station & Storage Facilities Electrical System using ETAP (Load Flow Analysis, Short Circuit Analysis and Motor Starting Analysis)
-; Facilitated the designing & sizing of electrical cable to feed the electrical power from source sub-station to the client sub-station and design the electrical system downstream (the client sub-station were furthermore developed the Fire Alarm System) using SABIC, Royal Commission and SEC standards
-; Checked the design with ETAP by conducting Load Flow Analysis, Short Circuit Analysis & Motor Starting Analysis
-; Executed General Engineering Services Projects of Saudi Aramco using Aramco standards
octobre 2008
A juillet 2010
Research Assistant
à King Fahd University of Petroleum and Minerals
Lieu :
Arabie Saoudite - Khobar
-: Executed various research projects with professor
-:Organized the Electrical Laboratory Sessions for undergraduate students
-:Organized the Electrical Laboratory Sessions for undergraduate students
octobre 2007
A août 2008
Electrical Engineer
à Eastern Trading and Contracting Establishment
Lieu :
Arabie Saoudite - Khobar
-: Directed Power Transmission System and executed the work as per Electrical Single Line Diagrams and Equipment Layout Drawings
-: Led a team of Supervisors, Foremen as well as Charge-hands & Technicians
-: Liaised with external vendors for participation in various meetings and review of design for the system
-: Updated the team of Consultants about the progress of work and quality of the material used
-: Managed the quotations and comparison of the same with data bank of quotation
-: Kept a close track of the progress and reported about the same in the meetings with clients & consultants
-:Troubleshot the faults in the wirings and rectified the same with Megger Test
-: Led a team of Supervisors, Foremen as well as Charge-hands & Technicians
-: Liaised with external vendors for participation in various meetings and review of design for the system
-: Updated the team of Consultants about the progress of work and quality of the material used
-: Managed the quotations and comparison of the same with data bank of quotation
-: Kept a close track of the progress and reported about the same in the meetings with clients & consultants
-:Troubleshot the faults in the wirings and rectified the same with Megger Test
décembre 2006
A septembre 2007
Electrical Engineer
à Goldline Contracting Comapany LLC
Lieu :
Émirats Arabes Unis - Dubaï
My scope of work includes but not limited to the following:
a) Executing the work according to Electrical Drawings.
b) Managing the Supervisors, Foremen and a team of Chargehands and Technicians.
c) Updating the team of Consultants about the progress of the work and quality of the material used.
d) Moreover I worked mainly as Site MEP Coordinator, thus taking care of whole MEP drawings and informing respective Engineer about their work according to the site.
e) Estimating various items required in Electrical, Fire Alarm and Fire Fighting services.
a) Executing the work according to Electrical Drawings.
b) Managing the Supervisors, Foremen and a team of Chargehands and Technicians.
c) Updating the team of Consultants about the progress of the work and quality of the material used.
d) Moreover I worked mainly as Site MEP Coordinator, thus taking care of whole MEP drawings and informing respective Engineer about their work according to the site.
e) Estimating various items required in Electrical, Fire Alarm and Fire Fighting services.
janvier 2006
A septembre 2006
Assistant Engineer
à Victrad Enterprise Pte. Ltd.
Lieu :
Singapore
My scope of work includes but not limited to the following:
a) Electrical services and installation of the Main Switch board, Sub switch board and Distribution box.
b) Assisting in the Maintenance of Electrical Installation like Sub Stations and Earth Fault relay testing.
c) Assisting the Site Manager in quoting the cost for various jobs.
d) Fire Alarm servicing and testing.
e) And operating the Operation Control Centre (OCC).
f) Leading a team of technicians.
a) Electrical services and installation of the Main Switch board, Sub switch board and Distribution box.
b) Assisting in the Maintenance of Electrical Installation like Sub Stations and Earth Fault relay testing.
c) Assisting the Site Manager in quoting the cost for various jobs.
d) Fire Alarm servicing and testing.
e) And operating the Operation Control Centre (OCC).
f) Leading a team of technicians.
juin 2005
A novembre 2005
Trainee Engineer
à Karnataka Power System Corporation
Lieu :
Inde - Bengaluru
Data entry of the Peak Demand, MVar Demand.
Trouble Shooting
Following the Contractors.
Trouble Shooting
Following the Contractors.