Abdul Saquib, Qa/qc Mechanical Engineer

Abdul Saquib

Qa/qc Mechanical Engineer

Sankyu Saudi Arabia

البلد
المملكة العربية السعودية - الجبيل
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
13 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 5 أشهر

Qa/qc Mechanical Engineer في Sankyu Saudi Arabia
  • المملكة العربية السعودية - الجبيل
  • أشغل هذه الوظيفة منذ أبريل 2019

AG & UG Piping :-

* WPS/PQR
* Welder qualification (WQT/WPQ)
* Fit - up Clearance and corresponding Inspection of AG & UG Pipes with reference to Approved Drawing
* Weld visual
* Preparation of LHS
* NDE Clearance including RT, UT, DPT, PWHT, Hardness, PMI etc.
* Documentation as per Loop files
* Line check and MC clearance
* Loop file In - process and Final QC clearance for Hydro - test.
* Hydro - test witness and clearance of loops as per each Loop file
* Holiday test (for UG lines)
* Tool Box Talks, Welder Productivity, Fitter productivity, Electrode consumption
* Petty contractor handling and stabilization of their corresponding QC Dept.
* Internal Audit and Client Audit.

Structure :-

* Verify and Inspect Civil foundation clearance to Mechanical
* Welder Qualification as required
* Fit - up clearance as per drawing
* Weld visual
* NDE clearance such as UT, DPT etc.
* Inspection prior to release for Equipment/Piping erection (Structure alignment - Elevation, Verticality & Torqueing, Snug tightening etc.)
* Release for Grouting
* Inspection prior to release from Structure to Piping

Equipment :-

* Foundation/Structure Handover (Civil/Mechanical to Equipment)
* Equipment (Static/Rotary) Alignment Inspection
* Equipment Internal Inspection
* Equipment Site Hydro/Pneumatic Test Inspection
* Final Box - up.

QA QC Engineer Mechanical في China Kunlun Contracting and Engineering Corporation
  • الهند - كوتاك
  • يونيو 2017 إلى يناير 2019

AG & UG Piping :-

* WPS/PQR
* Welder qualification (WQT/WPQ)
* Fit - up Clearance and corresponding Inspection of AG & UG Pipes with reference to Approved Drawing
* Weld visual
* Preparation of LHS
* NDE Clearance including RT, UT, DPT, PWHT, Hardness, PMI etc.
* Documentation as per Loop files
* Line check and MC clearance
* Loop file In - process and Final QC clearance for Hydro - test.
* Hydro - test witness and clearance of loops as per each Loop file
* Holiday test (for UG lines)
* Tool Box Talks, Welder Productivity, Fitter productivity, Electrode consumption
* Petty contractor handling and stabilization of their corresponding QC Dept.
* Internal Audit and Client Audit.

Structure :-

* Verify and Inspect Civil foundation clearance to Mechanical
* Welder Qualification as required
* Fit - up clearance as per drawing
* Weld visual
* NDE clearance such as UT, DPT etc.
* Inspection prior to release for Equipment/Piping erection (Structure alignment - Elevation, Verticality & Torqueing, Snug tightening etc.)
* Release for Grouting
* Inspection prior to release from Structure to Piping

Equipment :-

* Foundation/Structure Handover (Civil/Mechanical to Equipment)
* Equipment (Static/Rotary) Alignment Inspection
* Equipment Internal Inspection
* Equipment Site Hydro/Pneumatic Test Inspection
* Final Box - up.

QA/QC Engineer (Mechanical) في Larsen and Toubro Ltd.
  • الهند
  • يوليو 2015 إلى مايو 2017

AG & UG Piping:-

* WPS/PQR
* Welder qualification (WQT/WPQ)
* Fit - up Clearance and corresponding Inspection of AG & UG Pipes with reference to Approved Drawing
* Weld visual
* Preparation of LHS
* NDE Clearance including RT, UT, DPT, PWHT, Hardness, PMI etc.
* Documentation as per Loop files
* Line check and MC clearance
* Loop file In - process and Final QC clearance for Hydro - test.
* Hydro - test witness and clearance of loops as per each Loop file
* Holiday test (for UG lines)
* Tool Box Talks, Welder Productivity, Fitter productivity, Electrode consumption
* Petty contractor handling and stabilization of their corresponding QC Dept.
* Internal Audit and Client Audit.



Structure:-

* Verify and Inspect Civil foundation clearance to Mechanical
* Welder Qualification as required
* Fit - up clearance as per drawing
* Weld visual
* NDE clearance such as UT, DPT etc.
* Inspection prior to release for Equipment/Piping erection (Structure alignment - Elevation, Verticality & Torqueing, Snug tightening etc.)
* Release for Grouting
* Inspection prior to release from Structure to Piping

QA/QC Engineer (Mechanical) في Tarachandra Engineering Pvt. Ltd.
  • الهند
  • يوليو 2013 إلى يونيو 2015

AG & UG Piping :-

* WPS/PQR
* Welder qualification (WQT/WPQ)
* Fit - up Clearance and corresponding Inspection of AG & UG Pipes with reference to Approved Drawing
* Weld visual
* Preparation of LHS
* NDE Clearance including RT, UT, DPT, PWHT, Hardness, PMI etc.
* Documentation as per Loop files
* Line check and MC clearance
* Loop file In - process and Final QC clearance for Hydro - test.
* Hydro - test witness and clearance of loops as per each Loop file
* Holiday test (for UG lines)
* Tool Box Talks, Welder Productivity, Fitter productivity, Electrode consumption
* Petty contractor handling and stabilization of their corresponding QC Dept.
* Internal Audit and Client Audit.

Structure :-

* Verify and Inspect Civil foundation clearance to Mechanical
* Welder Qualification as required
* Fit - up clearance as per drawing
* Weld visual
* NDE clearance such as UT, DPT etc.
* Inspection prior to release for Equipment/Piping erection (Structure alignment - Elevation, Verticality & Torqueing, Snug tightening etc.)
* Release for Grouting
* Inspection prior to release from Structure to Piping

QA/QC Engineer (Mechanical) في A. R. Engineers
  • الهند - فادودارا
  • فبراير 2012 إلى يونيو 2013

QA/QC Activities :-

* Method Statement / ITP / QAP preparation and approval.
* WPS/PQR qualifications
* WQT/WPQ qualifications
* Incoming Inspection - IQC
* Raw Material Testing (as per Quality Plan and ASME Standards)
* Stage Inspection such as Fit - up, Dimensional checking, Assembly Checking before Full Welding
* Final Inspection, NDT clearance (DPT/MPT, UT, RT), PWHT Chart review etc.
* Witness RF Pad test, Hydro-test, Pneumatic test, Pressure test, Leak Test etc.
* Documentation as per ISO Standards with reference to Purchase Order, Bill Of Material, Drawing and Quality Plan
* Call booking of the completed Fabricated Items via official mail sent to our Clients
* Pre - dispatch Inspection
* NCR closings
* Inspection of Electrode Oven room (Calibration of Ovens, Oven register etc.), PWHT Recorder, Thermocouple etc.
* Quality Audit (Internal/External - Quarterly/Half yearly)


Production Activities :-

* Verification of Purchase Orders and Cost Sheet before the job is taken
* Study of Bill of Material and Drawing
* Production Scheduling/Planning
* Preparation of Job Card that includes Job No., Raw Materials to be used, step by step Fabrication process along with the respective Machine nos., Job Dispatch date, Job Qty, QAP No. etc.
* Traceability maintenance, Raw material availability record, Inventory etc.
* Shop - floor handling
* Execution of day to day fabrication jobs such as Calculation of Developing Length, Cutting, Bending, Rolling, Machining, Tack Welding, Preheating, Full Welding etc.
* Work Instructions (as per Quality Plan) such as Critical Dimensions' Chart, Process Sheet etc.
* Attending to Client and their complaints and queries
* On Time Delivery maintenance

QA/QC Engineer (Mechanical) في Dash Inspectorate Private Limited
  • الهند - فادودارا
  • أكتوبر 2010 إلى يناير 2012

AG & UG Piping :-

* WPS/PQR
* Welder qualification (WQT/WPQ)
* Fit - up Clearance and corresponding Inspection of AG & UG Pipes with reference to Approved Drawing
* Weld visual
* Preparation of LHS
* NDE Clearance including RT, UT, DPT, PWHT, Hardness, PMI etc.
* Documentation as per Loop files
* Line check and MC clearance
* Loop file In - process and Final QC clearance for Hydro - test.
* Hydro - test witness and clearance of loops as per each Loop file
* Holiday test (for UG lines)
* Tool Box Talks, Welder Productivity, Fitter productivity, Electrode consumption
* Petty contractor handling and stabilization of their corresponding QC Dept.
* Internal Audit and Client Audit.

Structure :-

* Verify and Inspect Civil foundation clearance to Mechanical
* Welder Qualification as required
* Fit - up clearance as per drawing
* Weld visual
* NDE clearance such as UT, DPT etc.
* Inspection prior to release for Equipment/Piping erection (Structure alignment - Elevation, Verticality & Torqueing, Snug tightening etc.)
* Release for Grouting
* Inspection prior to release from Structure to Piping

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Biju Patnaik University of Technology and Management
  • أغسطس 2010

6.43 (10-point GPA)

Specialties & Skills

CSWIP 3.1
Microsoft Office
NDT Level II (UT, RT, MPT, LPT)
MS Office (Word, Excel, Power Point, Outlook etc.)
CSWIP 3.1

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
البنغالي
متوسط

العضويات

Indian Institute of Welding, Kolkata, India
  • Associate Member
  • May 2009

التدريب و الشهادات

CSWIP 3.1 (الشهادة)
ASNT TC Level II (DPT & MPT) (الشهادة)
تاريخ الدورة:
March 2015
صالحة لغاية:
March 2020
ASNT TC Level II (RT & UT) (الشهادة)
تاريخ الدورة:
April 2011
صالحة لغاية:
April 2016