Project No 2
Site Surveyor for the Pilling
(Resident villa of Sheikh Butti
for the 18 Villas of Sheikha Moza Al
To set out the plot by coordinate system using Total Station.
(For buildings & Villas)
Plotting, working on local Coordinates & Global Coordinates using Total Station & AutoCAD. (For buildings & Villas).
Providing layout for the Boundary Walls for all Villas.
Providing layout of tower crane, Diaphragm wall, Excavation works, Capping Beam, Struts pipes, setting out depth for basement floors by total station using resolution method, marking for under ground drainage system, setting out drainage & lift pits, Setting out level for blinding, screed and major Raft Foundation, Providing levels for steel work for columns, shear walls, core & lift walls. (For buildings).
Major layout for RAMP with slab work. (For buildings).
Providing layout for drop beams at Mezan Floor (For buildings).
Providing Axis on all typical floors. (For buildings).
Providing layout for Roof & Cover floors. (For buildings & Villas).
To set out the axis for aluminum & glass work. (For buildings & Villas).
Providing layout of Block, & Tiles work. (For buildings & Villas).
Plan, coordinate and supervise the work of several field surveys. Coordinate work assignments with the schedule of the contractor to ensure timely completion of projects.
Keep detailed and accurate records of all survey activities, survey data.
Study operational problems and recommend changes.
Performed and supervised various surveying functions including topography surveys, construction surveys, etc.