More than six years working as a client planning Engineer in Kuwait Oil Company and Handling Project Gate system, BSC (Balanced score card, KPI (Key performance indicators) MBO (Monthly Business outlook), Project Master list, Quarterly Project Reports (QPR), Capital Program Monthly reports (CPM), KOC Board of directorate dash Boards and Pre-Project Progress Reports (PPR), Project Management Information system (PMIS), Capital Expenditure (CAPEX) & Operational Expenditure (OPEX) reports, Budget Re-phasing exercise, General Management Review (GMR) documents, State audit Bureau (SAB) reports, Preparation and updating of Project weekly & monthly summary reports for higher management review meetings etc..
As a client Planning Engineer (KOC), Performing review and approval of Contractor baseline schedules, recovery schedules, forecast schedules, shutdown schedules etc… Conducting regular Site Visits & attending weekly and Monthly progress review meeting with the Contractor. Review of Contractor’s Invoices, PMS and providing approval. Monitor & Control Contractors projects progress and providing mitigation plan/ taking corrective actions to rectify the delays, if any. Coordination for Adjustment Orders/ Variations with Contractors and KOC management to assure the timely issuance of the same.
Projects Handled
• KOC EF/1975: Installation of New Desalter Train at GC 09, 10, 19 and 21 (LSTK: US$ 227 Million)
• KOC EF/2104: Power distribution network for ESP Phase II 1600 wells & 29 Nos RHM (FPLS: US$ 1.1 Billion)
• KOC EF/1947: Power distribution network for ESP Phase I 600 wells (FPLS: US$ 550 Million)
• KOC EF/1946: Construction of 3 Nos 11kv 72 MW elevated main intake substations B4, B5 and MG2in South and East Kuwait Area ( FPLS: US$ 92 Million)
• KOC EF/1890: Replacement of Instrument Air and Plant Air in South and East Kuwait Facilities (FPLS: US$ 118 Million)
• KOC EF/2092 & 2093: Expansion of wara water injection system and construction of new Burgan water Injection system (US$ 60 Million)
• KOC EF/1905: Improvement of Fire Fighting and Security System and Bypass transit line construction at S & EK Manifolds (US$ 20 Million)
• KOC EF/1934: Installation of New VSM Driven Crude Transit Pump at GC-06 & GC-20 (US$ 50 Million)
• KOC EF/1834: Replacement of Dual Tank at GC-4 and Dry Tank at GC- 21.(US$ 23 Million)
• KOC EF/1814: Replacement of Existing 12" Crude Pipeline with New 16" Pipeline from GC 22 to CMM (US$ 16 Million)
• KOC EF/1767: Installation of Multipoint smokeless HP Flare at 14 Nos South & East Kuwait GCs (US$ 47 Million)
• KOC EF/1988: Replacement of 42" Flare Line At GC-03, 04, 06, 07 & 08 and Drain Sump Vent Line at GC-03, 04, 06, 07, 08 & 21 (US$ 7 Million)
• KOC EF/1947A&B: Construction of 5 Nos of 11kV Area substations in S&EK Area (US$ 86 Million)KOC
• KOC EF/2057: Construction of Main Intake Substations B6 & B7 in SEK Area (US$ 85 Million)
• KOC EF/2067: Construction of Main Intake Substations B8, B9 and MG3 in SEK Area (US$ 110 Million)
• KOC EF/2035: Construction of Ahmadi power distribution network in SEK ( US$ 27 Million)
• KOC EF/1672: Construction of Bulk Handling Chemical Storage Primary and Secondary Facilities for SEK, west and North Kuwait GCs (US$ 60 Million)
Achieved Time and Cost Optimization in several projects during its execution period (Project cycle time reduction, cost optimization during FEED, BP, Execution phases etc..)
Implementing Project Life cycle by following Project Gate System in Projects. Stage Gate 1 Identification, 2.1 Feasibility, 2.2 SOR (Statement of Requirements) and CPP (Conceptual Project Proposal) 3.1 Project Definition and FEED, 3.2 Project Validation and Contract Action, 4.0 Project Execution, 5.0 Operation and Project closure.
Preparing, assisting decision support packages (DSPs) during each stage gate closure process.