1.supervision of all electric team
2. Calculating load, Maintaining DPR and log books .
3. Installation of control panels and circuits.
4. installation of U.P.S
5. Designing of single phase and three phase panels.
6. Supply to single and 3-phase panels and electric machines.
7.installation of Intercom exchange, PTCL lines, internet routers and
Switches.
8. Installation of new and old split air conditions.
2. Calculating load, Maintaining DPR and log books .
3. Installation of control panels and circuits.
4. installation of U.P.S
5. Designing of single phase and three phase panels.
6. Supply to single and 3-phase panels and electric machines.
7.installation of Intercom exchange, PTCL lines, internet routers and
Switches.
8. Installation of new and old split air conditions.