شهاب محمد أدهم ياسين الشريف, Senior Tech. Office Electrical Engineer

شهاب محمد أدهم ياسين الشريف

Senior Tech. Office Electrical Engineer

Shade Corporation Ltd.

البلد
المملكة العربية السعودية - الدمام
التعليم
دبلوم عالي, Management
الخبرات
15 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 1 أشهر

Senior Tech. Office Electrical Engineer في Shade Corporation Ltd.
  • المملكة العربية السعودية - الدمام
  • أشغل هذه الوظيفة منذ أبريل 2019

 Key Responsibilities:
o Assisting in preparation of the ETAP reports to revalidate ratings of the selected
equipment inclusive but not limited of: Short Circuit, Load Flow, Motor starting,
Arc Flash, Motor Starting and Harmonic Study for VFDs.
o Working on system models and simulations using software programs for
design and sizing of the electrical equipments: MVSGs, RMUs,
Transformers, Generators, UPSs, Switchgears and control gears
o Studying factory shop drawings and data sheets of the manufacturers of the
electrical equipments inclusive but not limited of: Harmonic filters, PFC
capacitor Bank, UPS, VFD Control Panels.
o Prepare the design IFC package for the different electrical systems inclusive
but not limited of: Lighting control system, Fire Alarm system, Grounding
system.
o Provide support throughout the manufacturing of the designed electrical
systems.
o Prepare the material technical submittal according to Mandatory Saudi
Aramco Engineering Requirements.
o Check the detail design conformance to the specified project specification /
standards before submission to Project management team and follow the
indicated comments during the review cycle.
o Prepare the scope alignment based on the status of the technical quires by
mention the positive and negative items.
₋ Projects:
 Baker Hughes Polyflow Manufacturing Plant (Location: Abqaiq, KSA).
About the project: KING SALMAN ENERGY PARK (SPARK) is intended to
attract multiple industry types: upstream and downstream Oil & Gas,
petrochemicals, power and water. The master plan of SPARK recognizes the
operation needs of these industries and has allowed for appropriate
infrastructures, roads, logistics, a Dry Port, shared services, commercial and
residential areas and highly specialized training centers to complement and
enhance the use of the overall community while contributing to the health,
welfare and quality of life of its residents.
 SPARK-Waste Water Connection to Modon (Location: Abqaiq, KSA).
About the project: Due to non-availability of municipal waste water collection
network in the vicinity of the development, it is developer’s intention to
integrate the operation of the KING SALMAN ENERGY PARK (SPARK)
sewer and Irrigation system with operation of the existing Waste Water
Treatment Plant (WWTP) located at the MODON Industrial zone, in vicinity of
the SPARK project building.
 Upgrade Security Facilities- Southern Area (Location: Qurayyah, KSA).
About the project: The purpose of this project is to upgrade the existing security
facilities and fencing for Saudi Aramco at Southern Area in order to comply
with the High Commission for Industrial Security (HCIS) directives to remain a
reliable supplier of oil and gas.
 Replace and Automate Water Wells (Location: Dahran, KSA).
 Bridge on prince naif street over the 18th Street in Dammam (Location:
Qurayyah, KSA).

Electrical Engineer في ECG Consultant
  • مصر - القاهرة
  • يناير 2018 إلى مارس 2019

:
o Review & approve the electrical shop drawings (MV&LV Cable routing),
lighting, Power, Grounding System, SLD, Load schedule and light current
systems shop drawings according to project documents and building codes.
o Review & approve materials according to project contract priorities (Contract
Agreement, Tender Queries, Particular Conditions, General Conditions, BOQ,
Specifications, IFC Design Drawings, Contractor Offer, etc.).
3
o Review & approve composite shop-drawings coordinating with all trades
(Architectural, Structural, Mechanical, Plumbing, Roads, Landscape, etc.)
o Review Design and perform redesigns -as required-; to solve technical
issues under design and existing stages.
₋ Projects:
 Hyde Park Project (Location: New Cairo, Egypt).
About the project: 6, 081, 337 m2 Compound; (Construction + Infrastructure
Works), Outstretched compound, comprising large landscapes, several types of
Residential Buildings, Blocks, Villas, Utility Buildings in New Cairo, Egypt.
 MCIT Data Center Project (Location: Smart Village, Egypt).
About the project: The project covers the redesign of an existing building into a
data center, Redesign entails the demolition and dismantling of certain building
sections. Work also covers setting up three cabinet halls (a total of 90 cabinets)
on the ground floor of the existing building.

Electrical Project Engineer في Specialized Projects CO. LTD
  • المملكة العربية السعودية
  • سبتمبر 2014 إلى سبتمبر 2017

Key Responsibilities:
o Manage teams of electrical subcontractors during construction and
installation of electrical power and control systems for new equipments
which are safe, reliable and technically correct.
o Resolve issues related to electric systems or devices that arise during the
course of construction
o Develop cost estimates for material and labor, estimate manpower and timelines,
giving project managers the information needed to consider contractor bids and
ensure the project remains within budget.
o Prepare estimates, writes detailed equipment specifications, obtains
vendor/contractor, quotations, write purchase order requisitions for
equipment, and provides on-site supervision of construction projects to
assure that plan specifications are met.
₋ Projects:
 National Guard Stand Facilities Project.
 Construction of Bachelor Officers Project.
 Construction of Dammam Autism Center Village Project.
 Construction of Dammam Social Protection Unit Project.

Technical Office Engineer في Alfarid Contracting Est.
  • المملكة العربية السعودية - الخبر
  • يونيو 2012 إلى يونيو 2014

 Key Responsibilities:
o Prepare shop drawings for indoor-outdoor lighting, power and cable
routing with the electrical power calculations.
4
o Working on low current systems plans and risers (Fire alarm, Sound
System, IP Telephone/Data System, MATV, Clock System, CCTV, etc.) In
coordination with the specialized companies.
o Reviewing and finalizing as-built drawings upon the project completion.
o Prepare cost breakdown analysis for change orders and modifications in the
project.
o Assisting Projects Department Manager in studying new design tenders with
cost estimating for the electrical items.
o Reporting major problems to project director and design management unit to
avoid it in next projects.
o Following up Authority approvals SCECO., Civil defense and Baladya.
₋ Projects:
 One Stop Shop Building Project at King Fahd International
Airport.
 Multipurpose Buildings Project at King Abdul-Aziz.
 Multipurpose Buildings Project at King Abdul-Aziz.
 Extension of Marin Administration Building Project at King Abdul-Aziz
Seaport.
 Extension of Warehouses and Logistics Division Project.
Orphans Children's Village Project.

Electrical Engineer في Arab Contractors CO
  • مصر
  • ديسمبر 2008 إلى يونيو 2012

o Review the electrical shop drawings, cable list and I/O tables for
automation & control systems, sequence of operations, operating and
maintenance procedures, including parts lists, to provide plant personnel
with operating and maintenance information.
o Conduct testing of the electrical systems and working on site during
equipment delivery for installation and commissioning.
o Working on the electrical design and coordination of various trades, with an
emphasis on water and wastewater treatment plant related buildings, industrial
facilities, and associated electrical systems.
o Carrying out MV and LV cable routing in the site.
₋ Projects:
 Abu Rawash Wastewater Treatment Plant.
₋ About the project: Upgrading level of treatment from primary to
secondary treatment for the Whole capacity of the existing waste water
plant 1, 200, 000m3/day.
 Al Ameirya Wastewater Pumping Station (Phase2).
₋ About the project: Expansion the pumping station wastewater to reach its
capacityto200, 000m3/day.
5
 Heliopolis Company for Chemical Industries (Factory 81).
₋ About the project: Construction of the military factory 81 that is
affiliated with the Ministry of Military Production for Civilian and
military products.
* Extra Information:
 Personal Skills:
 Managing works throw work programs when needed.
 Dealing with managers and lead my teams.
 Contributing to established company and win the clients satisfactions.
 Work & Training Summary:
 Training in TOWNGAS COMPANY (Egypt, Cairo, Helwan) in2006.
 Training in ELECTRIC POWER STATION (Egypt, Cairo, Helwan) in2006.
 Training in GASCO COMPANY (Egypt, Cairo, Nasrcity) in2007.
 Graduation Project Summary:
 Design distribution of load to a hotel (lighting + power).
 Design security system and fire detection to the hotel.
 Providing system for controlling Temperature, Humidity and Illumination Appliance.
 Load estimation in electric power distribution system for the hotel.

الخلفية التعليمية

دبلوم عالي, Management
  • في Project Management Institute
  • أكتوبر 2017

2017 PMP Certified (Project Management Professional) - PMP NO: 2099492, Project Management Institute (PMI).

دبلوم عالي, Electrical Power System Engineering
  • في Cairo University
  • يناير 2011

Higher Diploma in Electrical Power System Engineering, Cairo University.

بكالوريوس, in Electrical Power System Engineering
  • في Cairo University
  • يونيو 2008

2003-2008 Bachelor of Engineering Electrical Power System and machines Department, Cairo University

Specialties & Skills

AutoCAD
Office Applications. Word & Excel
Ecodial program
dialux program
Programmable logic Controller PLC
CABLING
LIGHTING
MICROSOFT WORKS
ROUTERS
AUTOMATION
BUDGETING
CUSTOMER RELATIONS
DELIVERY
MANAGEMENT
MATERIALS MANAGEMENT

اللغات

الانجليزية
متوسط

التدريب و الشهادات

ELECTRIC POWER STATION (تدريب)
معهد التدريب:
ELECTRIC POWER STATION
تاريخ الدورة:
July 2006
المدة:
60 ساعة

الهوايات

  • foot ball
    Nothing