Civil Engineer ( Qatar MMUP Certified) في PARSONS INTERNATIONAL LTD.
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مايو 2020

Civil Structure Engineer, PWA, Doha Qatar,
Employer: Parsons International Limited, Qatar
Project: Construction and upgrading of Mesaimeer road, P008 Contract-C3,
Code: IA 2017 C 002 G, Project Budget Cost: 1.7 Billion Qatari Riyals.
Project Duration: 42.56 Months.
Main Responsibilities and Achievements:
• Construction of 1st Cable Stay Bridge Supervision from the Following Stages: Excavation of Piles or Foundations up to the required depth, checking depth of Piles, Reinforcement cages Inspection Lowering Of Cages, Casting of Concrete, Trimming Of Piles, Pile Integrity Tests, Capping Beams or Abutment Foundation Casting, Piers Reinforcement Inspections and Concrete Casting, Bearing Pedestals Inspections and Concrete Casting, Bearing Installation Inspections, Diaphragms reinforcement and Concrete casting inspections, Pylon Tower Reinforcement Saddles Installation and Concrete casting inspection, Segmental Bridge Erection Inspections, All types of Calculations and Stressing of Tendons, PT Bars inspection, installation of cable stays and Stressing Calculation inspections from initial stages until final stages.
• Supervision of works on site in accordance with contract documents, drawings, technical specifications etc. ensuring correct implementation of works according to contract, design, quality of materials & workmanship
• Checking, recording, and testing of completed works before they are covered by the contractor.
• Review, comment and make recommendations on the construction methodology, working drawings, equipment submittals, and other construction-related work.
• Advise the Engineer about problems, issues and discrepancies that may be a reason for technical or contractual problems (such as poor construction quality, delayed completion, inconvenience with others, etc.) and take necessary actions (or recommend actions to be taken) to rectify such discrepancies.
• Inspect regularly, including sample testing where required, materials and workmanship to ensure that the works are being carried out in compliance with the terms and conditions of the relevant Contract Documents.
• Implement and maintain with the Contractor a system for ensuring the quality of concrete and concrete works, including preparation and testing of concrete test cubes.
• Design, Material Approvals etc.
• Assist the Engineer in the process of approval of any items of the Contractor’s Design, material approval (for material, mechanical/electrical equipment etc.); including to attend and report on any trials or witness tests assigned by the Engineer, check lists for equipment imported by the Contractor for project use and inspect/check on site deliveries.
• Prepare and submit to the Manager snagging list for remaining and remedial works at Taking Over, for completion during the Defect Notification Period. Assist the Engineer with arrangements for hand-over of the completed facilities to the Entity for Operation and Maintenance.
• Review of Method statements, Shop drawings for general arrangement, reinforcement, water proofing, formwork, and Material Transmittals.
• Review of Prequalification documents, structural calculations, and design drawings.
• Attending and conducting meetings with the client, consultant, and contractor
• Conduct field inspection and investigation of steel and concrete structures and prepare technical reports that include analysis of problems and recommended solutions.
• Organization of the work of site inspectors and monitoring their performance, providing reports for construction process and achievements.
• Coordinate site work in monitoring and supervising all the activities associated with the Project in relation to the Structural Works.
• Review the inspection request prior releasing them to Resident Engineer and, when necessary, attend scheduled inspections via Inspection Requests and provide accurate inspection comments.

Site Civil Engineer في QD-SBG construction company (Qatar MMUP Certified)
  • قطر - الدوحة
  • نوفمبر 2015 إلى مايو 2020

Civil Site Engineer, PWA, Doha Qatar,
Supervision Consultant: Parsons International Limited, Qatar.
Project: QPR-Dukhan Road Contract (Code: IA09/10C 080 G, Project P005
Project Budget Cost: 7.0 Billion Qatari Riyals.
Project Duration: 105 Months.
Main Responsibilities and Achievements:
Alwajbah Bridges:
• Widening of Bridges for Khalifa Avenue, Piles, Pile Integrity Test, Pile Caps, Wing Walls, Back Walls, Bearing Pads for Girders Fixing At Khalifa Avenue North and South Side, Precast Beams Construction for Khalifa Avenue North and South Side Bridges, Deck Slab Parapet Construction for Khalifa Avenue North and South Side Bridges., Guard Rail Installation & fixing for Khalifa Avenue, Curb Stone Foundation at Median, left & Right side for Khalifa Avenue, Granite Curb Stone for Alwajbah Khalifa Avenue East Bound and West Bound, Construction of DMS Cantilever Gantries for Alwajbah Interchange.
Bani Hajer Interchange Bridges:
• Construction of Bani Hajer interchange bridges, Arch link-2 Bridge (length=194.6m, , Arch link-1 Bridge Over Khalifa Avenue (length=177.86m, , Arch link-1 Bridge Over Link-2 Road (length=51.33m, Camel Bridge Construction (length=137.279m, Pile Integrity Test, Pile Caps, Wing Walls, Back Walls, Bearing Pads for Girders Fixing At Bani Hajer Interchange, Post Tensioning (Pre-Stressing) Of Cast-In-situ Bridges for Bani Hajer Interchange Bridges
Road Work For Alwajbah Khalifa Avenue:
• Subgrade, Sub-Base, Aggregate Road Base Asphalt laying for all Alwajbah Khalifa Avenue DOHA Road, DUKHAN Road And for all Connected DETOURS with Amiri Palace.
• Construction of standard Traffic Signage’s.
Drainage line, Utilities work For All Alwajbah:
• 1800mm, 1600mm, 1200mm, 600mm, 400mm and 300mm TSE line Construction work with Pre-cast and cast in-situ Manholes for All Alwajbah, Khalifa Avenue and for Amiri Palace, Surface water Drainage line Construction with Pre-cast and cast in-situ Manholes for All Alwajbah Interchange, Portable water line (Día =600mm G-9 & h-9) construction with cast in-situ Manholes for All Alwajbah Interchange, Foul sewerage line construction, Irrigation line Construction.
Hard Scape and Soft Scape Work for Khalifa Avenue Alwajbah.
• Granite Paving construction, Granite Tiles for Benches construction,
Technical Experience.
• Shop Drawings Review, Method statement Review, Red Mark As Built Drawings Easily Handle with Record, Site work changes Decision.
Civil Site Engineer, Lusail Real Estate Development Co, PMCM Parsons, Doha Qatar.
Supervision Consultant: Dorsch, Qatar.
Project: Contract Package CP07B Lusail Infrastructure, LRT Station Public Car Park & Landscape.
Project Budget Cost: 4.16 Billion Qatari Riyals.
SHORING WORK:
• Diaphragm Wall Construction, Guide Wall Construction for D-Wall, Diaphragm Wall Construction along seaside, Normal Anchor work in D-wall from Drilling, installation, grouting and up to stressing, Removable Anchor work in D-wall from Drilling, installation, grouting and up to stressing, Waller Beam Construction in D-wall, Hoop Beam Construction in D-wall, Secant Piles Construction, Guide Wall Construction for Secant Piles, Secant Piles Construction along seaside, Normal Anchor work in Secant Piles from Drilling, installation, Waller Beam Construction in Secant Piles, Hoop Beam Construction in Secant Piles, Contiguous Piles Construction, Guide Wall Construction for Contiguous piles, Contiguous Piles Construction, Micro Piles Construction.

Civil Site Engineer في GHC International (Pvt)Ltd. Engineers’ & Contractors
  • باكستان - بيشاور
  • نوفمبر 2014 إلى نوفمبر 2015

Main Responsibilities and Achievements:

• Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
• Planning the work and efficiently organizing the site in order to meet agreed deadlines.
• Overseeing quality control, health and safety matters on site;- Preparing reports as required.
• Ensuring all materials used and work performed are as per specifications.
• Interpreting the contract design documents supplied.

Site Engineer في Techno Time Construction (Pvt) Ltd.
  • باكستان - بيشاور
  • أغسطس 2011 إلى أغسطس 2014

Main Responsibilities and Achievements:

• Zintara Project Job Role Description: Organizing materials and ensuring sites are safe and clean.
• Preparing cost estimates and ensuring appropriate materials and tools are available.
• Providing technical advice and suggestions for improvement on particular projects.
• Diagnosing and troubleshooting equipment as required. Negotiating with suppliers and vendors to ensure the best contracts.
• Executing technical drawings on site. Drawing up work schedules and communicating any adjustments to crew members and clients.
• Gathering data, compiling reports. Completing quality assurance and providing feedback to the team.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Sarhad University Of Science & Information Technology Peshawar
  • نوفمبر 2014

BE-Civil Engineer

بكالوريوس, BE-CIVIL
  • في BISE Peshawar
  • نوفمبر 2014

1-expert in Autocad of making in home maps 2-Civil 3d. 3-Primavera. 4- Eagle point. 5-Sap2000 FINAL YEAR PROJECT: To Investigate the Effects of Steel Fibers on Mechanical Properties of Normal concrete.

Specialties & Skills

SAP2000
Primavera P6
AutoCAD
RF design
CONSULTING
LANGUAGES
MECHANICAL
AUTOCAD
COMMUNICATION SKILLS
MICROSOFT OFFICE

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس

التدريب و الشهادات

iternship (تدريب)
معهد التدريب:
PDA
تاريخ الدورة:
September 2014
المدة:
8 ساعات

الهوايات

  • News paper, reading books, journey
    relative work