Shoy Konath Francis, QA/QC Manager

Shoy Konath Francis

QA/QC Manager

Parsons - Qatar

Lieu
Qatar - Doha
Éducation
Baccalauréat, Civil Engineering
Expérience
26 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :26 years, 0 Mois

QA/QC Manager à Parsons - Qatar
  • Qatar - Doha
  • Je travaille ici depuis mai 2017

ORYX INTERNATIONAL SCHOOL, QATAR AIRWAYS.

CLIENT • M/S QATAR AIRWAYS.
CONTRACT VALUE • USD 1.475 MILLION
PERIOD • MAY 2017 ONWARDS.

SCOPE • An school building of international standard, G+2+P with 40, 000 Sq.m. built up area, 15, 000 Sq.m. land scape and 11, 200 Sq.m. play area. Works include concrete structure, façade, dry wall, space frame, swimming pools, high end finishing and furnishing etc.

QA/QC Manager à Harinsa Qatar (Spanish ECISA group)
  • Qatar
  • mars 2015 à mars 2017

PEARL QATAR PA 02B, 16A - QATAR.

CLIENT • M/S UNITED DEVELOPMENT COMPANY (UDC).
CONTRACT VALUE • USD 2 MILLION
PERIOD • MAR 2015 MAR 2017.

SCOPE • Residential towers consists of 2 basements, GF, Mez and 21 floors each in Pearl Qatar carried out finishing works and balance civil works as the previous contractor left in between.

Site QA / QC Manager. à M/s Al Jaber Engineering W.L.L.
  • Qatar - Doha
  • novembre 2005 à décembre 2014

• Integrated Management System (IMS) establishing, implementing and verifying through audits.

• Preparing / Review Project Quality Plans, Inspection and Test Plan, Quality Control Procedures and Method Statements of works, submitting and obtaining approval from Engineers.

• Acting as company QA/QC representative and managing a team of QA/QC Engineers / Inspectors.

• Advise the Project Management on suitable QA/QC Objectives and Targets. Conduct management review meetings as per company management system.

• Issue Non-Conformance Reports and Corrective Action Request, perform root cause analysis and ensure follow-up with corrective and preventive action as necessary. Also analyze the improvements.

• Review and ensure follow-up of QA/QC complaint. Identify the GAPs in the system and its corrective action plan.

• Identify QSE training needs, prepare, review and authorize the training program for all levels of staff on site.

• Participate in QA/QC Meeting with client and consultant. Organize meeting with subcontractor’s QC team.

• Deploying QC Engineers for Inspection off all works as per approved Drawings, Specifications, and Standards \{BS, ASTM and Company Standards like Armco, Q.P., ADNOC, etc.\} and obtain approval from Clients, Engineers/ Third party inspectors for preceding the works.

• Checking and approving all test reports for materials, concrete, asphalt, curtain wall, stones etc.

• Keeping a well oriented filing system for the traceability of all documents as per ISO 9001:2008 requirements.

• Establish a system for final handover of dossier, Implement the system and arrange to keep it in specified period.

QA/QC Engineer à M/S SIX CONSTRUCT LTD.
  • Émirats Arabes Unis - Abu Dhabi
  • mai 2004 à octobre 2005

A mosque to pray for 25, 000 peoples at a time with high quality Islamic architectural and finishing works from all over the world. Which includes 90% of the total are marble and other architectural works.

• Preparing / Review Project Quality Plans, Inspection and Test Plan, Quality Control Procedures and Method Statements of works, submitting and obtaining approval from Engineers.
• Inspection off all works as per approved Drawings, Specifications, and International Standards.
• Checking and approving all test reports for materials like concrete & its ingrediants, decorative stones etc.
• Keeping a well oriented filing system for the traceability of all documents as per ISO 9001:2008 requirements.
• Establish a system for final handover of dossier, Implement the system and arrange to keep it in specified period.

QA/QC Inspector à Consolidated Contractors International Company
  • Arabie Saoudite - Khobar
  • septembre 1997 à novembre 2003

QA/QC INSPECTOR

• CCW PROJECT - QATAR
• DGL PROJECT - QATAR.
• Q-CHEM 1 PEOJECT QATAR.
• OGD 2 PROJECT ABUDHABI.
• SHAYBAH PROJECT, K.S.A.
• Carry out inspections to all works to ensure as per approved Drawings, Specifications, and Standards \{BS, ASTM and Company Standards like Armco, Q.P., ADNOC, etc.\} and obtain approval from Clients, Engineers/ Third party inspectors for proceeding the works.
• Issue Non-Conformance Reports and Corrective Action Request, perform root cause analysis and ensure follow-up with corrective and preventive action as necessary.
• Checking and approving all test reports for materials, concrete, Special materials using in oil / Gas projects, etc.
• Keeping a well oriented filing system for the traceability of all documents as per ISO 9001:2008 requirements.

Éducation

Baccalauréat, Civil Engineering
  • à KENSINGTON UNIVERSITY, U.S.A.
  • mars 2000
Diplôme, Civil Engineering
  • à Govt. Sree Rama Polytechnic, Valapad
  • mai 1991

Specialties & Skills

Auditing
Quality Management
Project Execution
Concrete
civil engineer

Langues

Anglais
Expert

Adhésions

DET NORSKE VERITAS {DNV}.
  • INTERNAL QUALITY MANAGEMENT SYSTEM {QMS} AUDITOR
  • October 2005
CHARTERED QUALITY INSTITUTE
  • ASSOCIATE
  • November 2012
BSI
  • Lead Quality Auditor
  • August 2013

Formation et Diplômes

BASIC LIFE SUPPORT & FIRST AID. (Certificat)
Date de la formation:
February 2010
Valide jusqu'à:
February 2010