Siddique  Hassan , Field Engineer

Siddique Hassan

Field Engineer

infotech

Location
Pakistan - Lahore
Education
Diploma, Telecommunication And Information Technology
Experience
9 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :9 years, 8 Months

Field Engineer at infotech
  • Pakistan - Lahore
  • My current job since October 2020

working in mass transit department of metro orange train project.

Fiber Optics Technician at SK E&C
  • Saudi Arabia - Jeddah
  • January 2012 to December 2016

Project:Customer activation

Responsibilities:
Installation of fiber optic cable (FOC) direct buried or into ducts or sub ducts for surveillance Camera.
Preparation of FOC for FAT and camera.
Preparation of FOC in Fiber Access Terminal (FAT) IN m/h OR H/H.
Termination and splicing at ODF, OTB, Camera and FAT.
Testing of FOC by OTDR and power meter.
Labeling of FOC at cabinets, ODF, OTB, and all cameras

  • January 2010 to January 2011

Physical Surveys:
Physical Surveys of Cabinets and NAP locations.
Physical Survey of User End premises for Cable Route and Devices installation.


FTTH Installations:
Installing HONT at customer end.
Splicing at FAT and FDT.
Provide triple play service.


Planning:
Installation scheduling for FTTX weekly.
Cable Laying Route.
System and ODF installation.
Link Budget.


Patching & Exchange:
Patching for PON port to distribution cabinet from WDM to ODF.
Arranging of Patch cord in arranging panel of ODF and Tagging.
Basic knowledge about B-PON and G-PON LT Cards.
Splitter installation in Distribution Pop and Cabinet.


Field Supervision:
Installation of CPE devices.
Duct Lying.
Cable Pulling.
OFC cable Jointing, Splicing & Testing.


Operation & Maintenance:
Maintenance and installation of main cable joint enclosures including straight and branching(4-9, 7-22)
Maintenance and installation of main distribution cabinets.
Maintenance of OSP’s(POP, Common FDT, Common joints, Network Access Points, Patch cords, Pigtails &OFC Installation and splicing as per company SOP’s..




Testing Department:
Splicing Fusion Mechanical
PON Parameters calibration and testing (Using OTDR)
Point to Point link testing (Using OTDR)
Splitter and WDM installation and testing (Using power source meter)
Testing from Exchange end to Joints and Main Cabinets.
DARK fiber link testing, Reporting with Auto CAD Drawing (Editing If Necessary)

Equipment Used During Work:

Splice Machine OTDR Power MeterVisualFault Locator
Fujikura 50S Acterna 5000EEXFO JDSU
Fujikura 60S EXFO 200Aterna


PROJECT HANDELED IN MY CAREER:
Mobily:FTTH/FTTB implementation.
STC:Long haul fiber optic cable implementation.
Haifa Mall:Networking and designing of multimode fiber optic network and rack installation, switching and module.

Education

Diploma, Telecommunication And Information Technology
  • at NFC institute of engineering & technology
  • March 2020

optical fiber and splicing

High school or equivalent, Art
  • at Sir syed public school
  • March 1995

Specialties & Skills

CABLING
splicing

Languages

Arabic
Expert
English
Expert
Urdu
Expert

Training and Certifications

computer and MS office (Certificate)
Date Attended:
December 2009
Valid Until:
August 2010

Hobbies

  • traveling, watch documentaries of different countries