Total Years of Experience: 29 Years, 9 Months
June 2006
To December 2011
QC E & I
at SMOE
Location :
Indonesia
Done, Inspections all Electrical equipment, JB used at SMOE, Project, accordance to Them Quality, and locations to installing.If Hazardous Area, All Equipment and Component are Certified.
January 2011
To December 2011
QC E & I
at SINDAKSIRAIT
Location :
Indonesia
JOINT S M O E 2006UP 2011 Doing E & I constructions, precom, commission experience at hazardous area offshore
works, can work as a team.
works, can work as a team.
March 2006
To June 2011
E&I Supervior/QA/QC E&I
at PT.SMOE Batam Industrial Kabil.
Location :
Indonesia
The Last Position E&I QA/QC INSPECTOR 2011
January 2006
To December 2006
Supervisor
at SMOE
Location :
Indonesia
Done, Supervised all proses Electrical s Work Start from doing all support of Ladder tray, Lighting J B
Control Room, Looks All Progress of Them according to the Drawing.Precomputed, Commissioned up The Platform Sent Offshore.
Control Room, Looks All Progress of Them according to the Drawing.Precomputed, Commissioned up The Platform Sent Offshore.
July 1989
To December 1998
Mc. Dermott.Int
at Batam.
Location :
Indonesia
General Foreman Electrical& Instrument, Construction Installing, Termination, Cable pulling G landing-cable, .Control room Done excellence up to Energies And Ready Sent to Location or Offshore..
January 1985
To July 1987
Electrical Supervisor.
at PT>KARYA PRAYONA
Location :
Indonesia
Supervise all maintenance of Electrical Equipment and prosesing Pure Kernel Oil Factory.
January 1984
To January 1985
Asistant Engineering
at Good Year
Location :
Indonesia
Maintenance of Crumb Rubber Factory Latex & Lump Prosesing.
April 1981
To December 1983
OPERATOR RECEIVING YARD 275 KV.
at PT>INDONESIA ASAHAN ALLUMINIUM
Location :
Indonesia
Do operational at receiving yards control panel room.and reporting every fault system and maintain.
August 1978
To March 1981
Electrical Foreman.
at MAEDA CONSTRUCTION LTD.
Location :
Indonesia
Doing Tunnel long 1000meters and Diameter 8 meters.& INTAKE DAM Wide 142 meters Height 42 meters. Supervise and maintain Electrical Sub Station Transformers Compressors motor 3.3 KV
Air drilling Concrete Plant Station Lighting All electrical Equipments.
Air drilling Concrete Plant Station Lighting All electrical Equipments.