Mechanical Engineer
Structural Facility Managemen
مجموع سنوات الخبرة :10 years, 11 أشهر
AREAS OF DOMAIN EXPERTISE
* Perform preventive and routine inspection maintenance in health care sector.
* Supervision and Coordination of all MEP related work in Construction of Ahamed Bin ali Stadium.
* Execute work orders for maintenance, repair and testing of HVAC equipment / systems &
Instrument and control systems. This includes Chilled Water system and DX system, A/C
Motor, AHUs and FCUs.
* Installation of HVAC Services like Chillers, CHW pumps, FAHUs, FCUs, Ventilation Fans, DX-systems
Window, Split & Package AC’s.
* Admirable experience working as a Fire Protection Engineer and designing Fire Alarm and Fire
Suppression systems.
* Operation and troubleshooting of MCC panels and controls.
* Performed pump testing at all facility locations.
* Installed and tested water and sewage lines for residences and commercial buildings
Assist in the design, planning, construction and maintenanceof equipment, machinery, buildingsand other
facilities items.
* Designed and implementedHVAC Controlsto efficientlyregulate the building’stemperature, humidity, ventilation,
and air-quality.
* Handled critical componentsfor buildings’ safetyand securityincluding boiler, water distribution system, ice
maker, electrical panels, building lighting.
* Oversawcontractors who performedmaintenance to ensurecompletion of work byestablished standards
promptly; received commendation from the department manager.
* Managed staff of up to 15 engineersto resolve serviceissuessafely and efficientlywhile maintaining a productive
schedule six days per week.
* Resolved all complaintspromptlyduring dailyinspections; recognized bythe Director for outstanding
performance.
* Implemented managementplan designed to minimize downtime when boilersmalfunctioned due to boiler
operator error; resolved issue within 48 hours.
* Installed newvacuum pumps on centrifugal chillers; recognized by Supervisorfor attention to detail and abilityto
work with minimal supervision.
* Maintained efficient operationsof the water treatment plant through proper chemical feed adjustments; named
Employee of the Yearfor effortsin improving department performance.
* Pioneered innovativetechniquesto increase plant production capacity while reducing energycosts; received
company award for contributions.
* Collaborated with regulatoryagenciesduring construction; learned effective strategiesfor permittingfuture
projects whilemaintaining compliance with environmental protectionlaws.
* Responsible for a wide range of technical repairs on the facilityand associated various systems including heating,
air conditioning, plumbing, electrical, and irrigation systems
* As needed, assist in the coordination of building space allocation and layout, communication services, andfacility
expansion
* Installed and repaired all Doors, Hardware, Acoustical Ceilings, Flooring and Tenant Improvements enabling the
Property Manager more time to address other property issues
* Assist with plans, budgets, and schedulesfor allfacilitymodifications
* Assist with inspectionsof all construction and installation projects while updating all necessarycompany
managers or directors through progress reports
* Participate in quarterly safetymeetings. Helpstoimplementspreventivemeasures and recommendations of
company Executive SafetyCommittee
Preparing and submitting all work Inspection test reports(WIRs).
* Ensure thecivil obstruction have beencleared totheMEP contractors withMEP activities.
* Reviewthe shop drawing construction details, productdata, material samples, inspection plans, method
statement, deliveryschedules to conform compliance with the requirements of the project.
* Engage with authorityat beginning of project to insurethat all temporaryutilities(power and water) are provided
on time and do the same with closing out of project to ensure disconnection of utilityservices.
* Reviewand analysisall MEP drawingmaterials, Schedules/program of work etc. .
* Coordinating between MEP andcivil drawings at the site. Coordination and attendingmeeting with
subcontractors, contractor & consultant, client, supplier.
* Attending weeklyandmonthlymeeting along with consultant andmain- subcontractors.
* Preparing weekly andmonthly report & Reported with Manager and Construction Manager. Materials/ Work
inspection to inspect with consultant.
* Preparing As Build Drawing (Auto Cad). Day to daymonitoring work and planning entire work. Monitoring of work
as per specification, local & international standard codes.
* Identification of subcontractorsand suppliers&collecting question& closecoordination with subcontractors. Rising
IR, IIR of site MEP worksfor consultant approval orin case of anyclarification required.
* Attending authorityinspection’sas per the project schedule.Attending all testing & commissioning of MEP
services.
* Final finishing as schedulesprogramming and progressmonitoring etc
Provide technical adviceto staff designer, supervisor, inspector, andcontracting service provider regarding
installation and maintenance of MEP System.
* Manage to overseethe work of subordinate staff contact architects or Engineers.
* Identifyproblems in the design, planning, manage and delivering project.
* MEP System hasto analyze mechanical, Electrical, andPlumbing, firefighting engineering problemsand
formulate solutions
* Continuallyreviewthe contractor’sconstructionschedule during the progress of the site worksregarding MEP
services and report to the Project Director on the same.
* Reviewthe Contractor’sinstallationmethod statements.
* Reviewcontractor’smechanical shop drawing in conjunction with the structural and electrical engineersto ensure
engineering coordination andadvise the Project Director accordingly.
* Attending weeklyand monthlymeeting along with consultant andmain- subcontractors.
* Preparing weeklyand monthlyreport & Reported with Manager and Construction Manager. Materials/ Work
inspection to inspect with consultant.
* Monitor and promote health and safetyon the site. Record and report anybreaches to the ProjectManager. If
required, stop theconstruction worksif unsafepracticesare beingfollowed.
* Reviewand analysis all MEP drawingmaterials, Schedules/ program of work etc.
in
in
courses: Promech Engineering and Construction in Kerala
DESCRIPTION AutoCAD Electrical, AutoCAD 2D MS Office applications Revit in MEP Primavera – P6