الخبرة العملية

مجموع سنوات الخبرة :13 years, 3 أشهر

Freelancer consultant في Home
  • الهند - تشيناي
  • أشغل هذه الوظيفة منذ يناير 2020

Actively seeking for the new challenges

Senior Project Planning Manager في Faithful + Gould
  • ماليزيا
  • مايو 2015 إلى ديسمبر 2019

Projects
1) Pre - Construction Phases - (May’15 - Apr’16) - For both IKEA store and Shopping Centre Projects
2) Construction of IKEA Store - (15 Apr’16 - 09 Oct’17) - about 47, 000 m2 build up area, consists of (G+UG+3), Cost of the Project is approximately 140 million US Dollars
3) Construction of shopping centre - (10 Apr’17 - 31 Dec’19) -about 120, 500 m2 build up area, consists of (G+UG+3). Cost of the Project is approximately 300 million US Dollars

 Oversee and approve contractor’s baseline construction programme
 Liaison with the contractors in formulating the integrated Master Construction Schedule
 Review the updated schedule and identify the slippages and liaise with the contractors for recovery& revised Programmes
 Analyze the resource requirements periodically & communicate with the contractors
 Prepare high level milestone& executive reports to the client

 Formulated the integrated master construction schedule
 Successfully handled the contractors to meet all the contractual requirements w.r.t. planning & scheduling matters
 Completed the project as per the deadline & budget
 Effectively represented the client Ikano in terms of time claims submitted by the contractor
 Successfully involved in Project pre-construction phases

Sr. Planner في Prodeco
  • نيجيريا
  • نوفمبر 2013 إلى أبريل 2015

Joined as a Planner and rose to the position planning head - External Projects
 Reporting to Area manager
Overview of projects handled:
 Handled key project Heliconia Park, Hotel development by Prodeco, which is about 27, 500 square meters build up area which consists of 1 no’s of 5 levels towers ( G+4+Pent floor).
 Currently working for the multiple Projects as below
 EEE Lagos Residential Tower Phase 1 Project. Phase 1 comprises of 3 (B+G+19+T) floors of build-up area of 45, 000 sq.m area & Project value : 200 M USD
 Abuja Hill Estates Project, Abuja - Mixed use Development 8 no’s of (G+4) towers, 2 no’s of (G+2) tower, 4 no’s of (G+1) Villas, 2 no’s of swimming pool, Gym, Bar & Tennis court and utility & support buildings of total build up area 27000 sq.m & project value 150 M USD approximately
 NLNG Corporate Office Building, Port Harcourt - Tender Stage & Project value of 400 M USD
 Annacro Resident villa project - Abuja - Project comprises of 1 main villa building + Guest houses + Swimming pool + Bar/ Jacuzzi & other support buildings such as Boys Quarters, Guard House Etc., of total build up area 1090 sq.m
Key deliverables
 Successfully liaised with the section Construction / Project Manager in formulating the Master Construction Schedule
 Periodically update the schedule and identify the deviated areas and apply changes in the schedule
 Identify the critical path and motivate the site team to complete the critical activities on timely manner
 Review the contractor’s time schedule, manpower histogram, cash flow, procurement schedule, Equipment & staff schedule
 Prepare look ahead programmes, tender Programmes & Target Programmes
 Prepare Preliminary Programmes for other projects
 Prepare weekly and Monthly reports
 Prepare Progress S curve & update periodically
 Prepare S curves for the different trade of works, resource loading and cost loading Schedules
 Prepare time impact analysis report based on the current changes in scope of works, resources and sequences
 Implement the changes in the schedule based on the changes in scope of works, sequences & resources and determine the overall time impact of the Project

Planning manager في Confluence Project management
  • الهند - دلهي
  • يونيو 2012 إلى نوفمبر 2013

 Handled key project king’s court, a residential apartments development by DLF, which is about 30, 500 square meters area which consists of 3 no’s of 12 levels towers and 10 no’s of low rise buildings (UG+G+3). Cost of the Project is approximately 200 crores INR.



Key deliverables
 Successfully liaised with the section Construction Manager and Engineers in formulating the Master Construction Schedule
 Periodically update the schedule and identify the deviated areas and liaise with the main civil contractor for the required plan of action.
 Prepare weekly and Monthly reports
 Review the Contractor’s Programme and recommended to prepare recovery schedule as required.
 Prepare look ahead programmes and short term Programmes

Sr. Planning Engineer في Qatar Project management
  • السودان - الخرطوم
  • فبراير 2011 إلى مايو 2012

 Handled key project Mushaireb, a mixed use development by Qatari Diar, the Client which is about 206, 500 square meters area which is currently divided in to four Phases (short, medium, long term and infrastructure) with an anticipated project completion in 2016. Phase 1 involves the construction of a 7-story residential building (C03), Phase 2 includes the construction of three (3) more residential buildings (C04, C05 and C08) and a boardwalk along the Nile River, with all associated infrastructure (roads and utilities). Phase 3 includes another four (4) residential buildings (C01, C02, C06, and C07) and a five-star hotel, and Phase 4 is comprised of the remaining infrastructure works. Cost of the Project is approximately 500 million US Dollars.

Sr. Planner في Qatari Project Management
  • السودان - الخرطوم
  • فبراير 2011 إلى مايو 2012

Overview
 Handled key project Mushaireb, a mixed use development by Qatari Diar, which is about 206, 500 square meters area which is currently divided in to four Phases (short, medium, long term and infrastructure) with an anticipated project completion in 2016. Phase 1 involves the construction of a 7-story residential building (C03), Phase 2 includes the construction of three (3) more residential buildings (C04, C05 and C08) and a boardwalk along the Nile River, with all associated infrastructure (roads and utilities). Phase 3 includes another four (4) residential buildings (C01, C02, C06, and C07) and a five-star hotel, and Phase 4 is comprised of the remaining infrastructure works. Cost of the Project is approximately 500 million US Dollars.
 The project will also include a combined urban and waterfront development offering modern infrastructure, varying types of residential units, commercial and retail spaces, hotel(s), leisure and entertainment facilities, and a landscaped riverfront boardwalk on the majestic Nile.
Key deliverables
 Successfully liaised with the section Construction Manager and Engineers in formulating the Master Construction Schedule
 Periodically update the schedule and identify the deviated areas and liaise with the main contractor for the required plan of action.
 Report the potential time delays to the client periodically considering the current changes in the schedule
 Review and Approve the contractor’s Extension of time claims and recommend to the client.
 Develop Procurement Schedule and update
 Prepare weekly and Monthly reports
 Review the Contractor’s Programme and recommended to prepare recovery schedule as required.
 Manpower Histogram and cash flow
 Prepare KPI S curves showing the progress such as concrete, block works, plastering etc.,

الخلفية التعليمية

بكالوريوس, Civil engineering
  • في coimbatore Institute of Technology
  • أبريل 1994

Passed out in 1994 in first class with 73%

Specialties & Skills

Project Control
Primavera P6
Residential
Commercials
Project Planning
MS Project 2016
MS Office 2016
Primavera P6 18.80

اللغات

الانجليزية
متمرّس

العضويات

PMI Inc, USA
  • 2348777
  • February 2012

التدريب و الشهادات

Masters in Delay Analysis (تدريب)
معهد التدريب:
Prime Consulting UK
تاريخ الدورة:
April 2017
المدة:
45 ساعة
PMP Training (تدريب)
معهد التدريب:
PMI Chennai
تاريخ الدورة:
October 2012
المدة:
35 ساعة
Project management using Primavera (الشهادة)
تاريخ الدورة:
January 2007
صالحة لغاية:
January 2007