الخبرة العملية

مجموع سنوات الخبرة :3 years, 4 أشهر

في M/s ALMEER KUWAIT
  • نوفمبر 2014 إلى سبتمبر 2015

RESPONSIBILITIES

•Leads and controls skilled labor and work crews engaged in all activities concerned with the piping works aspects of the project. Ability to optimize resources (manpower, equipment and materials) to ensure efficient and timely completion of the works. Able to demonstrate good organizational skills, following policies, procedures and work practices, and developing improvements where necessary.

•Ability to read, interpret and follow method statements and procedures. Competent in reading and understanding specifications, drawings, and all other discipline related project and engineering documentation. Keeps records of all work completed and completion of “Action Lists”.

•Commands respect of his workforce, and develops excellent working relationships with all other department personnel as well as client management.

•Must be a good communicator. Able to give instructions in an efficient and effective way to his workforce. Liaises with other discipline foremen to ensure the optimum utilization of available work, with the overall objective of successful completion of the project.
•Review new pipe‐fitters/fabricator assigned to ensure they are adequately qualified.

•Ensure new pipe fabricators/pipe‐fitters are suitably trained and instructed on the project work‐scope and quality requirements.

•Ensure all necessary plant and piping equipment is maintained in a current operable and calibrated condition, and work crews are properly supplied with tools, equipment and materials.

•Prevents wastage and misuse of equipment, materials and tools. Supervises work crews to best utilize manpower and materials, exercises discipline at the work site to prevent absenteeism, unsafe work practices and idleness. Ensure consumable control requirements are closely followed.

•Complete the initial assignment probation monitoring of piping operatives and arrange required initial NDE through the QC section. Complete surveys and provide information on piping crew’s performance.

•Ensure the monitoring, witness and inspection requirements of the Quality Control Inspection plan are followed and the Piping Inspection Requests and (RFI’s) Request for Inspection forms are raised in a timely manner.

•Ensure that pipe marking requirements are followed.

•Complete the required monitoring of qualification updates and provide QC with client approved verifications

PIPELINE SUPERVISOR في HYDRATIGHT
  • مارس 2015 إلى سبتمبر 2015

Joint Integrity Management for Qatar Shell and Peal GTL Major Turnaround 2, 2016 from 06/02/2016 to 06/05/2016 M/s DOPETQATAR (HYDRATIGHT)
•Joint Integrity Management for Petro Rabigh Shutdown project in SAUDHI ARABIA from 15/11/2015 (M/s TIGTESCO HYDRATIGHT)
•Installation of Low sulphur fuel oil (LSFO) FG and Gas oil pipeline from MAA to sabhiya and Doha power stations KOC 1 PIPELINE PROJECT KUWAIT

Cochin Shipyard
  • يونيو 2014 إلى نوفمبر 2014

SHIP BUILDING
• Inspection welds joint preparation, fit-up, dimensional inspection & alignment from panel level to block sub-assembly and to the final block assembly
• Final weld surface visual examinations
• Experience in various welding technologies
• Having Knowledge about Class rules of Fabrication
• Review Radiography films
• Co-ordinating with Site surveyors for Class approvals
•Participated in Hull Erection Activities of Platform Vessel
•Unit Alignment,
•Fit up & Dry survey
•Hatch Coaming Alignment

•TURBINE GENERATOR PIPELINE SUPERVISOR

في BROTHERS ENGINEERING AND ERECTORS LTD
  • الهند
  • يونيو 2012 إلى مايو 2014

NTECL (A joint venture of NTPC & TNEB) 3 X 500 MW
Vallur Thermal Power Project, Chennai

RESPONSIBILITIES

•Check the installed piping components as per P&ID
•Reviewing isometrics, support drawings and details
•Inspection of incoming material as per quantity, mil certificates, heat number etc.
•Arrangement of spools in lay down yard as per standards
•Identify equipment location as per general arrangement drawing and prepare lay out and measurement
•Dimension checking of completed spools according to isometric drawings
•Identify equipment location as per general arrangement drawing and prepare layout.
•Reviewing isometrics, support drawings and detail arrangement of spools in lay down yard as per standards
•Maintaining housekeeping and proper manpower management
•Controlling of consumables
•Preparation of material request form as per site requirement
•Arrangement of equipments and manpower according to site conditions.
•Preparation of daily progress reports
•Supervision and inspection of post weld heat treatment of welding
•Method of statement preparation of Hot Tapping
•Supervision and inspection of Hot Tapping

STRUCTURAL SUPERVISOR في M/s BEE BEE ENGG
  • الهند
  • إلى

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في Aarupadi veedu institute of technologyAVITVinayaka mission UniversitySt george higher- secondary schoolBoard of Higher Secondary ExaminationSt. Mary's High SchoolBoard of Keral
  • يناير 2008

course passed in

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في Aarupadi veedu institute of technologyAVITVinayaka mission UniversitySt george higher- secondary schoolBoard of Higher Secondary ExaminationSt. Mary's High SchoolBoard of Keral
  • يناير 2008

course passed in

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في Aarupadi veedu institute of technologyAVITVinayaka mission UniversitySt george higher- secondary schoolBoard of Higher Secondary ExaminationSt. Mary's High SchoolBoard of Keral
  • يناير 2008

course passed in

Specialties & Skills

CONTACT MANAGEMENT
CUSTOMER RELATIONS
DOCUMENTATION
GRAPHIC DESIGN
LAYOUT DESIGN
PROGRESS
REQUIREMENTS
SUPERVISORY SKILLS
WELDING