somasundaram sonaimuthu, MEP INCHARGE

somasundaram sonaimuthu

MEP INCHARGE

SERCO MIDDLE EAST

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Electrical & Electronics Engineering
Expérience
24 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 9 Mois

MEP INCHARGE à SERCO MIDDLE EAST
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis novembre 2012

Executed in Power supply system HV, MV, LV, and MEP, SCADA in railway power supply project of traction power system and operation maintenance. Practical experience of working on projects at various stages in a lifecycle and an emphasis on system integration and co-ordination between subsystems-Rollin stock and signaling and communication.


750volt power rail system, Rectifier, BRU, LBS, RESISTER, HSCB, 750v Positive and negative isolators, UPS, Dry Type Transformers 300kva, 2700KVA, 1620KVA - 11/0.592KV, 132/33 kV, 33/590V rail TPS operation and Maintenance. Scada System, RTU, BLS, ITB, interface and interlock system checking and trouble shooting for operation maintenance.

• Prepare the switching procedure and checklist as per CDRL specification and method statement for operation maintenance.

• Managed installation, testing, commissioning and maintenance activities for Platform screen doors.

• Co-ordinate with OCC related technical corrective/Preventive and Breakdown Maintenance.

• Training given to supervisors and technician and get the feedback and acknowledgement.

• As per the Management schedule maintaining the MMIS-Maximo, CMS Updated and keep the record.

• Ensure safe and secured operation maintenance for KPI achievement.

• Dealing with OEMs, Vendors & Contractors; arranging training for O&M Personnel on regular basis to maintain the equipment in Healthy condition.

• Escalated MEP services and HSQE issues through concern team to fix as on priority for APM premises. Co-ordination and assist for technical issues and rectification with rolling stock and system communication team.

Senior Electrical Engineer à Emirates Trading Agency (ETA) M&E DIVISION
  • Émirats Arabes Unis - Dubaï
  • août 2009 à septembre 2012

 Planning, supervising and executing Electrical Erection and Commissioning activities for METRO TRAIN- Projects, Shopping Mall & International Airport Concourse-3, Phase -2, Expansion Proje
ct.

 Preparation of Single Line Diagram, General arrangements, Layout/ As Built Drawing, Estimation and Costing.

Senior Electrical Engineer à Befesa Infrastructure India (P) Ltd CHENNAI, INDIA
  • Inde - Chennai
  • février 2008 à juillet 2009

 Supervising and executing Electrical equipment of DRY Transformer and high pressure pump Booster pump, intake Pump.MV, LV Drives erection and commissioning activities for Befesa Infrastructure India (p) ltd of 100 MLD water Desalination plant .

Electrical Engineer à Dodsal Construction &Engineering Company RLIC. QATAR
  • Qatar - Doha
  • juillet 2007 à janvier 2008

 All Substation Switch gear Installation Including 33KV (Siemens), 11KV, 6.6KV Switch Gear and LV Switch Board, Gas Turbine Generator Auxiliary Equipments connection, Lighting works and Process plant lighting works for RGXII Project.
As per drawing boq preparation, cable schdule preparation .load status checking, excution as per sld and co-ordinate with vendor and consultants.

Fecility Engineer à Haden fecility management system
  • Inde - Chennai
  • juillet 2005 à mai 2007

 Commissioning, and Operation, Maintenance of DRY type transformer 2000 KVA, 11/0.433 KV
1500KVA DG sets with AMF Operation of synchronizing panel. LIFTS, HVAC System of 400TR centralized chiller plant, Fire hydrant system, raising main tap off box MCCB switch Panels.UPS 300 KVA, 125 KVA Parallel operation panels. Facilities for IT buildings, BMS,
IBMS System. STP, WTP Plant, 2ton Boiler, Cooling Tower Operation system.

Electrical supervisor à Saudi Electricity Company
  • Arabie Saoudite - Riyad
  • juin 2003 à mai 2005

 Arranging drawing approvals from CIEG and safety certificates for commissioning of equipments.checking the hv/lv equipments as per drawing for approval.panel and switch gear modification work with suppliers

As a Asst Electrical Engineer à Amurtanjan Chemical pvt Ltd
  • Inde - Chennai
  • mai 2001 à mai 2003

As per drawing checking the equipment and cables, switch gear and modification of panel LV/ HV equipments. Commissioning, and Operation, Maintenance of DRY type transformer 2000 KVA, 11/0.433 KV 1500KVA DG sets with AMF Operation of synchronizing panel. LIFTS, HVAC System of 400TR centralized chiller plant, Fire hydrant system, raising main tap off box MCCB switch Panels.UPS 300 KVA, 125 KVA Parallel operation panels. Facilities for IT buildings, BMS, IBMS System. STP, WTP Plant, 2ton Boiler, Cooling Tower Operation system.

Electrical supervisor à Amurtanjan Chemical pvt Ltd
  • Inde - Chennai
  • mai 1999 à avril 2001

Job Responsibilities (INDIA):
❖ Erection, Maintenance & Commissioning of Transformer up to 2500 KVA, 11/0.433 KV, Diesel Generators up to 1500 KVA, Air Circuit Breakers, Oil Circuit Breakers & MOCB, Double pole structure for 11 KV & Control panels, Transformer PCC/MCC panels and related cable laying, Termination, Earthing etc.

❖ Rotating Bridge equipments, Clariflocculators, Floating Equipments (Slow and high speed Aerators) Electrical Hoist for chemical Handling, Twin Lobe blowers from 5 H.P.to 50 H.P, Sodium and Mercury Lamp post (Street Light) Erection, and Instrumentation for Automatic controls for Dosing. Electrical operated valves, Level controller dry run controller for pumps,
Centrifugal pump up to 50 H.P.Sewage and effluent handling Non-clog submersible pumps up to 100 H.P.Screw pumps to handle non-abrasive but fibrous materials.

❖ Commissioning, and Operation, Maintenance of DRY type transformer 2000 KVA, 11/0.433 KV
1500KVA DG sets with AMF Operation of synchronizing panel. LIFTS, HVAC System of 400TR centralized chiller plant, Fire hydrant system, raising main tap off box MCCB switch
Panels.UPS 300 KVA, 125 KVA Parallel operation panels. Facilities for IT buildings, BMS,
IBMS System. STP, WTP Plant, 2ton Boiler, Cooling Tower Operation system.

Other activities:
❖ Arranging drawing approvals from CIEG and safety certificates for commissioning of equipments.

❖ Preparation of Single Line Diagram, General arrangements, Layout/ As Built Drawing, Estimation and Costing.

❖ Pipeline works using CI, MS, HDPE, PVC related specials like sluice valve, NRV and Foot Valve etc. for various plants Viz. Water, Sewage & effluent treatment plants.

Éducation

Baccalauréat, Electrical & Electronics Engineering
  • à tamilnadu polytecnic
  • avril 1999

Qualification % Marks Diploma in Electrical & Electronics Engineering (DEEE) . Tamilnadu polytechnic- Madurai. 78% Industrial Training Institute (Electrical) -Madurai. 77% S.S.L.C, ( M.M.Hr.Sec.School) -Madurai 77% Other Qualifications MS OFFICE, AUTOCAD, CREATION, EDITING, 2D, DIMENSION First class Electrical Competent License ( 'C' certificate) No. 29123 From the Licensing Board Government of Tamil Nadu. Tamilnadu driving license TN19 2009000043 LMV -Manual Expiry 18-09-2027 TN19 2009000043 From the India Driving Licensing Board Government of Tamil Nadu. UAE driving license 1783488 LMV -Manual Expiry 24/04/2022 WT45 From the Dubai Driving Licensing center United Arab Emirates Training course completed: ❖ HSE Induction course for working in Hydrocarbons environment. ❖ H2S awareness and escape ❖ Permit to work system ❖ First aid course ❖ Electrical Safety regulations for working in HV and LV equipment ❖ Basic Fire Extinguishers ❖ Safety Training observation Program (STOP)

Specialties & Skills

Arrangements required drawings ,
Operation maintanance of electrical equipments
MS-OFFICE ,EXCEL,AUTO CAD,
DIESEL GENERATORS
DRAWING
ENGINEER
ESTIMATION

Langues

Hindi
Expert
Malayala
Expert
Anglais
Expert
Tamil
Expert

Formation et Diplômes

NCVT (Certificat)
Date de la formation:
June 1994
Valide jusqu'à:
April 1996

Loisirs