Project Engineer
AL NASR CONTRACTING LLC
مجموع سنوات الخبرة :9 years, 9 أشهر
Construction of FLOATING, PRODUCTION, STORAGE, OFFLOADING
(FPSO) vessel.
Work Location : Dubai Dry Docks World (DDWD)
Project Cost : US $ 380 million
Analyzing and solving problems occurring in the Sewage Treatment Plant (STP)
• Identifying water leaking problems and rectifying them.
• Maintenance work of the Generator and Cooler.
• Conduction of Mechanical Plumbing (MEP)
BPJV (Bechtel-Petrofac Joint Venture)
Project : Al Taweelah Alumina Project -Non-Process Support Buildings Design & Construction
Construction of Ø450mm HDPE Pipeline from KIZAD Al Barari Tank to ICT Tank
Project :
.
SHAHEEN ACCESS DIVERSION ROAD & LAYING OF POTABLE
WATER PIPELINE (HDPE)
Construction of Shaheen Access diversion road inside AD Ports at the entrance of Gate 3 &
laying of HDPE Pipeline (Potable Water) at the center of the live road
the operations of the
Lathe Machine.
the operations of Computerized
Numerical Control (CNC)
from
from
(
(