Lead Planning Engineer في Fluor Daniel India Pvt Ltd
  • الهند - حيدر اباد
  • أشغل هذه الوظيفة منذ يوليو 2022

Review Multiple Trade contractor’s schedules and Prepare L5 Resource loaded Integrated Master Schedule as defined by the contract.
Review and Finalize Earn value Management system to enrich project billing methodology.
Review progress reported against the works scheduled, identify schedule risks/ issues and recommend mitigations to improve progress.
Develop project control/Scheduling procedures, execution plans, executive level reports and Dash boards.
Conduct workshops such as interface management, Work phase planning, Critical Milestones, Risks & Issues to complete the project on time with proposed budget.
Review contractor’s variation/claim submissions and provide assessment by using suitable delay analysis techniques for Extension of Time.

Senior Planning Engineer في ITAL CONSULT
  • الإمارات العربية المتحدة - أبو ظبي
  • مارس 2019 إلى يونيو 2022

Review Baseline Schedule and Monthly deliverables for Client submission.
Tracking Project status and review the updated schedule against work done at the site.
Prepare Supporting Documents for weekly/Monthly Client Meetings.
Review contractor EOT claims and prepare a feasibility study prior to client submission.

Planning Engineer في POINEER VISION GROUP
  • الإمارات العربية المتحدة - العين
  • نوفمبر 2016 إلى يناير 2019

 Prepare and update project schedule encompassing design, procurement, construction and commissioning across the scope of projects.
 Set work program and target milestones for each phase based on project plan.
 Monitor critical activities based on the project schedule and advise project management.
 Prepare and submit updated work program and cash flow curve showing actual progress and identify areas of weakness and methods for recovery, if any, as well as new critical activities.
 Monitor day to day work progress and prepare Daily/weekly & monthly reports reflecting work progress summary.
 Prepare engineering & procurement schedules at varying levels of details.
 Proactively raise red-flag if the targets are likely to slip; and identify remedial measures to be taken to bring the project back on track.
 Perform delay analysis; and prepare recovery plan in coordination with discipline manager.
 Preparation of Manpower & equipment deployment plan.
 Monitor the timings of submittals against schedule requirements.
 Review, check and evaluate the sub-contractor’s time schedule of work.
 Coordinate with clients planning engineer and finalizing formats.
 Coordination with the assigned project manager, construction management team and other groups.

Planning Engineer في HITECH GROUP OF COMPANIES
  • الإمارات العربية المتحدة - دبي
  • أكتوبر 2013 إلى أكتوبر 2016

 Prepare and update project schedule encompassing design, procurement, construction and commissioning across the scope of projects.
 Set work program and target milestones for each phase based on project plan.
 Monitor critical activities based on the project schedule and advise project management.
 Prepare and submit updated work program and cash flow curve showing actual progress and identify areas of weakness and methods for recovery, if any, as well as new critical activities.
 Monitor day to day work progress and prepare Daily/weekly & monthly reports reflecting work progress summary.

Planning Engineer في TOTEM INFRASTRUCTURE LIMITED
  • الهند - دلهي
  • مايو 2011 إلى سبتمبر 2013

 Preparation of schedule in primavera and monitoring of progress.
 Resource Planning: To work out detailed resource requirement based on standard productivity norms.
 Material and Resources Planning for Project.

Civil Engineer في SOMA ENTERPISES LIMITTED
  • الهند - حيدر اباد
  • مايو 2008 إلى سبتمبر 2009

 Sub-Contract billing on fort night & monthly basis.
 Preparing productivity report on daily basis.
 Preparation of work order for Sub-contractors.
 Sub-Contractor bill checking along with Original Drawings.
 Checking & tracking of Quantities for Sub-Contractor Bills.
 Quantities take off using Auto Cad drawings.
 Preparing labour costing for every fortnight bill closing.
 Monitoring Sub-Contractor works along with daily productivity to increase labour productivity.

الخلفية التعليمية

ماجستير, CONSTRUCTION MANAGEMENT
  • في UNIVERSITY OF SALFORD
  • فبراير 2011

DISSERTATION : UTILIZATION OF CONSTRUCTION & DEMOLITION WASTE

بكالوريوس, CIVIL ENGINEERING
  • في JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY
  • أبريل 2008
الثانوية العامة أو ما يعادلها, INTERMEDIATE
  • في VIKAS JUNIOR COLLEGE
  • أبريل 2004
الثانوية العامة أو ما يعادلها, SSC
  • في SAMYUKTHA HIGH SCHOOL
  • أبريل 2002

Specialties & Skills

Primavera P6
PRIMAVERA 6
AUTO CAD
BILLING
CLOSING
CONTRACT BILLING
DRAWING
ESTIMATION
MS-PROJECT

اللغات

الهندية
متمرّس
الانجليزية
متمرّس