PROJECT :
ADMA - Zakum feild- (166ZK50 to 410ZK44 ), zakum oil line replacement project phase-1
•Responsible for Piping support Modeling on E3D
•Review/Study FEED Documents, Scope of work, Project Specifications, Design Instructions, and material specifications, etc.
•Reviewed supplier documents and drawings as per project requirements
•checking of isometric drawings in E3D
NRL - ( Numaligraph Refinery Expansion Project )
•Modeling Equipment, Piping, Piping supports in SP3D.
•Coordinating piping department activities with other engineering disciplines
and Project Management team.
•Equipment & Piping Layout drawing preparation.
•Preparation Piping specification in SP3D.
Role as a Electrical and Instrumentation Designer
PROJECT :
ADNOC - (Habshan Gas Complex Expansion Project EPC Phase )
•Led Electrical design in As-Built projects for U-113-north, south and boundarys, U-122 and U-320.
•Modelled E&I system forindustrial facilities like cable trays, equipments like transmitters, lighting, control systems, Junction box, vendorjb, F&G
instruments, support, etc. Utilized SP3D software for modeling.
•Reviewed client E&I comment files to grasp project requirements, issues, and suggestions.
ADMA - ( Zakum feild- (166ZK50 to 410ZK44 ), zakum oil line replacement project phase-1 )
•Led the execution of E&I Cable tray and support remodel activities, adhering to industry standards .
•Utilized E3D and NWD software for modeling.
•Conducted detailed mark ups on schematics and documentation to reflect changes.
•Preparation of check print’s, data sheet and clash check
ADMA - ( Umm Shaif, E1936 - As built recovery project )
Mastering of ADNOC Offshore assets' 3D models and engineering deliverables for hook-up and PMR
•Generated 1000+ detailed 2D drafting using AutoCAD.
•Preparation of hook-up and PMR activities.
•Review and revise drawings for 100% accuracy .
•Monitored progress, identified areas for improvement, and implemented necessary changes
Achieved 98% compliance in Connector and Valve Department through meticulous inspections
Used precision inspection tools, averaging 20 inspections per week
Maintained a 99% quality assurance rate with rigorous final inspections before shipment
Delivered weekly reports, contributing to a 15% reduction in product defects over six months