Project Engineer
CARILLION ALAWI LLC
مجموع سنوات الخبرة :2 years, 3 أشهر
1. Projects: Royal kingdom of Bhutan institutions (Rs-10 core)
School building G+3
Residential building,
Guest house,
Hostel Building G+2,
Gabion retaining wall 2. Projects: Royal kingdom of Bhutan Hill Road Project-(Rs-36 core)
112 km hill form road with bituminous.
146 no's Culvert hum pipe culvert & Rcc Culvert.
RCC Retaining wall, Cabin retaining, gabion retaining wall
Storm water line
Designation :( Project Engineer - CIVIL).
Company Name: CARILLION ALAWI LLC (May-2012 to March- 2014) OMAN
3. Projects: (PETROLEUM DEVLOPMENT OF OMAN) (10 million) OMR
Ware house and gas storage building,
Pipe line foundation,
Renovation of PDO accommodation building.
Designation :( Site Engineer - CIVIL).
Company Name: PSK CONSTRUCTION (Apr-2008 to Jul- 2009) INDIA
4. Projects: (HALL MARK (Chennai))
Residential Apartments (G+6) of 7 Tower
Designation :( Site Engineer - CIVIL).
RESPONSIBILITIES:
Assist project team for completion of all project activity on time as per the contract.
Studying of all project specification, BOQ, drawing, architectural, structural and approved drawing received and ensuring that there is no variation between them, if any variation should be discussed and resolved with the design team or Clint.
Preparing the method statement and risk assessment for the execution of works in accordance with project quality plan and HSE
Conduct the meeting on daily basis with project team to discuss the next day activity and previous day achievement and if any query to solve the problems,
Attending client meetings & materials purchasing for site.
Supervision of civil works daily basis to achieve the target on end of the day.
Preparation of check list and getting it checked, verified and certified by the quality control to preceding work,
Every week conducting the progress meeting with our project team and find out the way to
complete the project quickly,
Preparation for quantities for site work activity requirement (BBS, concrete, blocks, shuttering material, etc.)
Ensure timely availability of project material and consumables required for execution of the work by carrying out identification, quantification, raising purchase request.
To control the wastage of material & keep safe all company materials,
Expertise in sequence of all MEP activities from Builder's work to complete the works.
Arrange for preparation and submission of As-built drawings
Mobilization labor if required.