Engineer
Yew Petroproducts Pvt Ltd, India
Total years of experience :4 years, 1 Months
• P&ID and Layout Study & Finalization of Pipe Routing (Big Bore+Small Bore)
• 3D Modeling using PDMS 12.0
•Equipment Nozzle Orientation fixing
• Squad checking of Equipment &Civil drawings
• Vender Drawing checking
•Preparation of Piping GA
•Checking & Issue of Isometrics
•Preparation of Pipe MTO & purches requisitinons
• co-ordination with Stress Group for Stress Critical Lines
• Interdisciplinary coordination
• Familiar with international codes and standard’s like
ASME B31.3, B36.10, B36.19, B16.5, B16.9
Linde India Limited (Formerly BOC India Limited)
Engineer (Year 2008-2009)
Responsibilities: • Piping Layout Design for Air separation unit,
• 3D Modeling using PDMS 12.0
• Isometric generation
• Preparation of Piping GA
• Piping BOM preparation
• Familiar with international codes and standard's like
ASME B31.3, B36.10, B36.19, B16.5, B16.9
Institution: Calcutta Institute of Technology GPA: 7.75 Elective Paper: Petrochemical's Professional Industrial Training Topic: Environment Friendly Fuel Processing Technology at South Eastern Coalfields Limited (Coal India) for Coal Gas Processing Technology. I have acquired Knowledge during the training on • Materiel Handling Plant • Producer gas Plant • Retort (Horizontal Retort, Intermittent Vertical Retort, Continuous vertical Retorts) • Gas Cleaning Plant (Primary cooler, Gas Exhauster, Detarrer) • Tar Distillation Process (Batch Distillation, Re- Casting Section, primary Distillation)