QC SUPERVISOR
SK ECOPLANT
Total years of experience :15 years, 0 Months
Project: M PROJECT (16 KM Storage Cavern of 42 million bbl capacity, Pipeline, Micro tunneling and surface facilities). Client: ADNOC
MAJOR ROLES & ACHIEVEMENTS:
• Actively participated with clients in resolving quality issues that occurred during an unexpected work stoppage caused by the Covid-19 pandemic.
• Headed the team responsible for conducting forensic studies and implementing solutions for foundation settlement issues due to heavy flood.
• Key team member responsible for executing the challenging task of installing steel structures inside a 120m deep vertical shaft.
• Provide guidance in execution of installing 5KM mountain fences in extremely dificult terrain.
• Lead coordinator for Civil & Steel Structure during system walkthrough inspections with clients and ensuring compliance.
related processing units). Client: KNPC
MAJOR ROLES & ACHIEVEMENTS:
• Acted as team leader and coordinated with client and subcontractors to resolve site issues.
• Successfully completed one of the largest units, which was both vertically and horizontally challenging.
• Assisted QA/QC Manager in gathering useful data and creating sketches that aided in confidently presenting proposals to the client.
• Assisted documentation & turnover team in managing all Civil and Architectural related documents and preparing handing-over dossiers.
Project: Ruwais Housing Complex Expansion Phase III, Package 12 (8 BuildingsG+11, Chiller Yard, 4 Substations and related infrastructures). Client: ADNOC
MAJOR ROLES & ACHIEVEMENTS:
• Successfully negotiated with the client by proposing a reduction in the test frequency of Project requirements, saving $1.2 million.
• Acted as Team leader and proactively identified and addressed quality issues, resulting in minimal errors and delays.
Project: Bab Gas Compression Project (Gas Compressor stations (3nos) & Pipeline works) Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)
MAJOR ROLES & ACHIEVEMENTS:
• Successfully utilized technical knowledge to clean the inspection log, contributing to the eficient preparation of the handover dossier.
Project: “Al Sadd Development Complex” (4Towers+3Apt+Rec+Utlty)
Consultant: Arab Engineering Bureau (AEB)
Client: BARWA
App. Cost: 565 Million USD
- Successfully supervised construction workers and subcontractors, resulting in on-schedule completion to required standards.
- Successfully ensured compliance with safety protocols, managed materials, tools and equipment, supervised subcontractors, conducted safety meetings and collaborated with the Section Manager to complete the project on time and within budget.
Project: The Old Town Phase B near Burj Khalifa Client: EMAAR
Project: The Trio Towers @ Dubai Land (B+G+26+S1+S2) Client: Bawadi Properties
MAJOR ROLES & ACHIEVEMENTS:
• Developed expertise in on-site work through hands-on experience at the grass roots level.
• Gained in-depth understanding of the complexities and processes involved in constructing luxury apartments in the central area of Dubai.
• Demonstrated adaptability by assuming control in PT slab construction during unexpected demobilization of subcontractor.