Mechanical QA/QC Engineer
Rezayat Company Ltd
Total years of experience :2 years, 1 Months
• Design and Build AlUla Gas Stations, working as a Mechanical Site Engineer for all Mechanical systems and Fuel System.
• Developed and implemented procurement policies and procedures to ensure compliance with corporate and legal requirements, database of vendors and products to enable efficient and cost effective procurement and maintained positive working relationships with suppliers, resulting in improved service and prices
• Worked with Civil Defense Consultant on the Fire Life Safety Report (FLSR).
• Provided technical support during installation and commissioning stages at site.
• Created detailed design drawings, schematic diagrams and layout drawings for mechanical systems. Generated cost estimates and technical requirements for equipment procurement.
• Optimized existing designs using AutoCAD software tools for improved efficiency and cost savings.
• Worked with design groups to develop structural design of products with design and analysis software.
• Conferred with engineers or other personnel to implement operating procedures, resolve system malfunctions, or provide technical information.
• Prepare HVAC specifications and control sequence of operation, write basis of design document for HVAC systems, fit parts or components as prescribed by company procedures and participate in commissioning of HVAC systems.
• Created technical reports and presentations explaining research, findings, and recommendations.
• Implemented quality control methods to ensure the reliability and safety of products.
• Generated cost estimates and technical requirements for equipment procurement.
• Drafted technical documents including reports, procedures and instructions for machinery operations.
• Reviewed vendor proposals for accuracy of material specifications and quoted prices prior to purchase orders being issued.
• Worked as a site engineer with this company. Having different roles and tasks to do. Starting from package installation after reading the drawing in AutoCAD, then start setting the limits and install all the needed parts for potable and irrigation networks. After installation we have to test the packages by hydro-test.
• Inspected construction sites on a regular basis to verify compliance with safety regulations. Coordinated with project managers and subcontractors to support project completion on schedule.
• Monitored the progress of construction activities on a daily basis to ensure timely completion of projects.
-Worked on different valve assembly as well as testing hydro test, pneumatic and cryogenic.
-Computerized Numerical Control (CNC) area.
-Performed assignments as determined by the supervisor
-Worked both independently and within a team environment with focus and high attention to detail.
-Communicated with others, demonstrating strong verbal and written communication skills.