Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
sunil kumar, Manager – Electrical Engineering

sunil kumar

Manager – Electrical Engineering·Jindal Stainless Limited (JSL)

India

Bachelor's degree, Electrical

Work experience

Total years of experience: 18 years, 5 months

Manager – Electrical Engineering

July 2019 - Present

Jindal Stainless Limited (JSL)

Jajpur, India

July 2019 - Present

Scope: End-to-end T&C, diagnostic testing, and capital project execution for 33 kV / 6.6 kV / 415 V systems at 200
MVA SAF ferro alloy operations; multi-crore CAPEX project management from conceptualisation through
commissioning and handover.
Protection Relay Testing & Commissioning
▶ Commissioned differential protection (low-impedance) and REF scheme for 5 × 33/6.6 kV, 10/12 MVA
distribution transformers using Siemens 7SR5421 relay: CT polarity verification, VKSAT/VKACT calculation,
stability test, sensitivity check; secondary injection via Omicron CMC and ISA; full scheme documentation
signed off
▶ Commissioned ABB VD4 VCB panels with arc flash protection relay for all 5 SAF furnace bays: arc flash

Company industry:
Heavy Industry & Metallurgy

Electrical Technician – HV Systems

August 2015 - Present

Emirates Global Aluminium (EGA)

Dubai, United Arab Emirates

August 2015 - Present

O&M and protection T&C across 2, 500 MW aluminium smelter distribution system, 380 V - 132 kV (1.1 MTPA
capacity). Multi-vendor environment: ABB, Areva, Toshiba, GE, ArcTeq, Argus Reyrolle.
▶ End-to-end protection relay T&C across entire smelter distribution system using Omicron, Manta, ISA: trip
logic, DC scheme, interlock scheme, TCS, REF stability/sensitivity, transformer differential stability/sensitivity,
distance protection zone setting verification across bus sections, transformer feeders, motor feeders
▶ CB testing (timing, contact resistance, VCB bottle integrity); AIS and GIS switchgear maintenance up to 132
kV; power transformer diagnostics (Alstom, ABB); 250 MVA reactor maintenance; RMU maintenance (Brush
make)
▶ Energy meter and transducer calibration; SCADA signal verification; protection event analysis; zero
protection-related outages over 3-year tenure
▶ Rigorous PTW/LOTO, barricading, risk assessment, method statement preparation, hazard identification on
live 132 kV systems; zero safety incidents

Company industry:
Mining & Quarrying

T&C MANAGER

June 2008 - Present

JSL

Jajpur, India

June 2008 - Present

ABB SACE EMAX ACB
testing; auto bus transfer scheme
verification; CT/PT, relay testing (ABB
REM-604 motor protection, ABB REF
615 feeder); 2×2.5 MVA transformer
Tan-Delta and Hi-Pot
ABB SACE EMAX;
ABB REF-615 / REM
604; Tan-Delta Full pre
commissioni
ng suite
signed off;
auto bus
transfer
proven Low-impedance
differential and REF scheme
commissioning (Siemens 7SR5421);
secondary injection; CT polarity
verification; VKSAT/VKACT checks;
scheme stability tested
Siemens 7SR5421,
ISA, Omicron CMC Zero
protection
mal
operations;
transformer
s energised
on schedule
ABB VD4 VCB Arc flash relay
setting, pick-up level verification, light
sensor calibration; VCB timing, contact
resistance, anti-pumping, TCS, breaker
close/trip scheme; bus protection
integration
ABB VD4; arc flash
relay; Omicron CMC Arc flash
clearance <
50 ms
verified;
breaker
close time ≤
60 ms AFE VFD pre
commissioning checks; MV switchgear
isolation; drive parameter
configuration; full-load acceptance test;
harmonic current verification (IEEE
519)
IEC 61800; ABB AFE
VFD; Power analyser Power 8 MW
→ 6.5 MW
(saving
~₹9-10
Cr/year);
accepted on
first run Online PD via HFCT, Techimp PDCheck; Predictive

Company industry:
Electric Power Production & Transmission

Manager – Electrical (T&C)

October 2018 - January 2019

Unarck Engineering Services

Korba, India

October 2018 - January 2019

▶ NTPC Jaminipali: commissioning and retrofitting of 6.6 kV VCB/VCU (Schneider HWX); CT/PT testing; relay
testing (Vamp 255); Bus CRM; Hi-Pot on 6.6 kV panels; all pre-commissioning tests executed and
documented
▶ Maithon Power: commissioning of 415 V ACB panels (ABB SACE EMAX) with Auto Bus Transfer scheme; relay
testing (ABB REF-615 feeder, ABB REM-604 motor); 2×2.5 MVA transformer Tan-Delta and Hi-Pot (AC) on
3C×630 mm² cable; all scheme checks signed off

Company industry:
Heavy Industry & Metallurgy

Executive – Electrical Engineering

January 2010 - January 2015

Balasore Alloys Limited

Balasore, India

January 2010 - January 2015

Electrical engineering for 75 MVA SAF (145K MTPA) and greenfield 132/11 kV switchyard commissioning.
▶ 132/11 kV Switchyard Commissioning — 6 Bays (Greenfield): SF6 CB timing/resistance, CT/PT/CVT winding
checks, ratio/polarity; ABB protection relay commissioning (differential, REF, distance, OC/EF); 2×50 MVA
transformer (IR/PI, turns ratio, vector group, OLTC); earthing grid; SCADA signal mapping; formal OPTCL grid
connection approval — delivered in 3 months, zero protection trips
▶ OLTC retrofitting project: replaced old units with new units including full acceptance testing; transformer
repairing, rewinding, and complete overhauling (CGL make 132/11 kV and furnace transformers)
▶ HV cable laying, routing, trench supervision, MV termination; earth pit installation; battery/DC panel testing

Company industry:
Manufacturing

Senior Engineer – Electrical

January 2008 - January 2010

Adhunik Metaliks Limited — Ferro Alloy Division

Rourkela, India

January 2008 - January 2010

▶ O&M of 7.5 MVA, 9 MVA, 11 MVA electric arc furnaces; furnace transformer OLTC maintenance; control relay
panel upkeep; HV switchgear testing and maintenance; protection relay commissioning support

Company industry:
Heavy Industry & Metallurgy

Education

Biju Patnaik University of Technology (BPUT)

January 2007

January 2007

Bachelor's degree, Electrical

India

Skills

COMMISSIONING
Intermediate
COMMISSIONING
Intermediate
COMPLIANCE TESTING
Intermediate
COMPLIANCE TESTING
Intermediate
DATA INTEGRATION
Intermediate
DATA INTEGRATION
Intermediate
ELECTRICAL ENGINEERING
Intermediate
ELECTRICAL ENGINEERING
Intermediate
IMPLEMENT PROJECTS
Intermediate
IMPLEMENT PROJECTS
Intermediate
INTRAVENOUS THERAPY
Intermediate
INTRAVENOUS THERAPY
Intermediate
MANAGEMENT
Intermediate
MANAGEMENT
Intermediate
PRIMAVERA SOFTWARE
Intermediate
PRIMAVERA SOFTWARE
Intermediate
PROJECT MANAGEMENT
Intermediate
PROJECT MANAGEMENT
Intermediate
VARIABLE FREQUENCY DRIVES
Intermediate
VARIABLE FREQUENCY DRIVES
Intermediate

Languages

English
Beginner
Hindi
Beginner

Training and Certifications

Certifications
ATEX/IECEx Hazardous Area — Awareness Level
BESS Design Engineering — MSDE/MSME Govt.
Electrical Design Engineering — IETP
Primavera P6 Planning — Certified (Wiznic World)
P6 (Certified)