Construction Manager
HEISCO
Total years of experience :22 years, 10 Months
Company : Gulf Spic Trading & Contracting Company W.L.L, Kuwait.
Site : CO2 Recovery Project At 'EQUATE'
Designation : Construction Manager
Jobs Handled :
• Heading the team briefing & inception activities to ensure all aspects of the work.
• Responsible & report on scheduling of man/material movements.
• Reviewing of Equipment and Piping Layouts, plot plan for the initial project execution.
• Analyze the depth of piping related documentation from P & IDs & calculation of man-hours for the specific job.
• Generating & reviewing all piping documents as per the project requirements
• Preparation & selection of piping specification based on T & P Characteristics
• Review & evaluate technical submittals to clients according to project standard.
• Review & evaluating the data supplied by vendor as per the contractual aspects.
• Providing the technical assistance for any major issues during vendor evaluation as well as during actual progress of job.
• Site investigation, documentation and maintaining test records, Reports and following 100% safety compliance.
• Checking of piping related documents such as plot plan, equipment layout, area division drawings piping GA drawings and inter connection in between process as well as mechanical.
• Preparing contractor agreements and amendment
Company : Gulf Spic Trading & Contracting Company W.L.L, Kuwait.
Site : Updating Of As-built Drawings(Entire KOC Facilities)
Designation : Senior Project Engineer
Jobs Handled :
• Preparation & checking of piping GA Drawings as well as Isometric Drawings for entire KOC facilities such as Gathering centres, Booster stations, Tank farms, Water injection plants, Water treatment plants.
• Preparation & checking of pipeline Profile Drawings as well as Layout plan Drawings for Pipelines and services.
• Checking of drawings on site as well as home office as per the EDPC standards and clients requirements..
• Checking the drawings as per latest projects done in the facility &updating the modification in the plant through surveying entire facility.
• Checking of piping related documents such as plot plan, equipment layout, area division drawings pipng GA drawings and inter connection in between process as well as mechanical.
• Preparing Sub contractor agreements and amendments.
• Execution of Civil works like Excavation, survey works, for pipelines through Sub-Contractor.
• Co-ordinating for inspection of Asbuilt drawings with client.
Company : Gulf Spic Trading & Contracting Company W.L.L, Kuwait
Site : Gathering Centre-24 Plant Construction.
North Kuwait Area, KOC
Designation : Senior Piping Engineer.
Jobs Handled :
• Execution of Fabrication & Erection of CS, SS Piping works
• Preparation of Weld Maps, Hydro test packages and maintaining a Track for following the Package flow.
• Mechanical completion of Hydro test packages, liquidating the punches and turning over System wise .
• Coordinating with Client for day today Site Activities.
• Execution of Civil works like Equipment, Structural Foundations and Grouting works through Sub-Contractor.
Company : Gulf Spic Trading & Contracting Company W.L.L, Kuwait
Site : EBSM (Ethyl Benzene Styrene Monomer) Plant Construction.
Equate - Olefins II Kuwait Project (OL2K).
Designation : Project Lead Engineer.
Jobs Handled :
• Execution of Fabrication & Erection of CS, SS & INCOLLOY 800H Piping works of 110, 000 Inch Dia.
• Mechanical completion of Hydro test packages, liquidating the punches and turning over System wise.
• Erection and Alignment of world’s largest Heat exchanger (Heat train), Styrene Steam Super heater furnace, Inter stage heaters, Reactors, Columns and Towers.
• Erection and Alignment of Rotating Equipments including 84 No of Pumps and 4 No of Compressors.
• Erection of Structural Steel of 1500 MT.
• Execution of Civil works like Equipment, Structural Foundations and Grouting works through Sub-Contractor.
• Execution of Insulation works for Equipment and Piping through Sub-Contractor.
Company : Gulf Spic Trading & Contracting Company W.L.L, Kuwait
Site : Mechanical 1 Infrastructure Facilities for OL2K Complex
Designation : Project Lead Engineer.
Jobs Handled :
• Execution of Fabrication and Erection CS & SS piping works of 75, 000 Inch Dia and Erection of Structural Steel of around 3600 MT.
• Preparation of Weld Maps, Hydro test packages and maintaining a Track for following the Package flow.
• Mechanical completion of Hydro test packages, liquidating the punches and turning over System wise.
• Coordinating with Client for Shut down, Tie-in and Pre-commissioning Activities.
• Execution of Civil works like Structural Foundations and Grouting works through Sub-Contractor.
• Execution of Insulation works for Equipment and Piping through Sub-Contractor.
Company : M/s. Excellent projects(I) Pvt. Ltd.
Site : Construction of Continous polymerization plant-10&Oxygen plant in Reliance Industries Ltd. Manufacturing division Hazira, Surat, India
Designation : Project Engineer
Jobs Handled :
• Fabrication & Erection of CS, SS & Monel Piping in CP-10&Oxygen plants
• Erection and Alignment of Static & Rotating Equipments and Structure Steels.
• Laying & Testing of Above ground & Underground Active drainage Piping
• Mechanical completion of Hydro test packages, liquidating the punches and turning over System wise.
Company : Fintech Engineers.
Site : Construction work of Aromatics plant expansion work&construction work of
Kero -merox at Reliance industries Ltd.Jamnagar India
Designation : Engineer - Piping
Jobs Handled :
• Fabrication and Erection of Aboveground, Underground pipings, Fire Fighting pipings and Fire Hydrants.
• Mechanical completion of Hydro test packages, liquidating the punches and turning over System wise.
• Coordinating with Client for Shut down, Tie-in and Pre-commissioning Activities.
MBA in Project Management with A Grade
➢ B.Tech. Mechanical Engineering from Govt. Engineering College Trissur affiliated to Calicut University in 2001, Kerala.