suresh krishnamoorthy, Sr.Project Engineer - Electrical

suresh krishnamoorthy

Sr.Project Engineer - Electrical

kharafinational

Lieu
Koweït
Éducation
Baccalauréat, Electrical machines
Expérience
25 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :25 years, 10 Mois

Sr.Project Engineer - Electrical à kharafinational
  • Koweït
  • Je travaille ici depuis décembre 2008

1.To Plan and execute Preventive and Corrective maintenance for 55 MW LV/MV Electrical load connected waste water treatment plant equipment's including 11 KV Ring Sub-Stations.
2. Serving as Leader POET (Planning, Operation, Engineering and
Technical) team and overseeing Heavy Machinery.
3. Preparing technical and Cost proposals for new installation and Modification works.
4. More consternation on Condition monitoring and failure analysis reports of equipment's.
5. Spare parts arrangements, absolute spares analysis and necessary steps to get equipment latest alternation.
6. Working as a acting Instrument engineer as required by project.
7. Providing Technical training to down stream employees as required.
8. Energy conservation, Cost control study and implementations as required.
9. Quality and Safety procedures review and updating.
10.Liaison with Client in order to assure that all technical/engineering requirements are met.
11. PLC, HMI, Scada maintenance and trouble shouting..
12. Handling Emergency, Shut down and Plant start up works as required.
13.Drawing updating and Engineering dept. follow-up.
14.Electrical Installation, testing and Commissioning of STP and Water pumping stations in MOD project.

Dy.Manager Electrical à Karur KCP Packkagings Ltd
  • Inde
  • septembre 2005 à novembre 2008

1.To execute Preventive and Corrective maintenance for 15 MW Load connected plant including 22 KV out door sub-station.
2.Trouble shouting works as required and failure analysis.
3.Spare Sprats arrangements.
4.Technical and Cost proposal preparation.
5. Energy Conservation study.
6. Action plans towards improving lifetime of the Equipment's.
7. Modification and new installation works as required.
8. Man power utilization and cost Control.

Electrical Engineer à KARUR KCP PACKKAGINGS LTD,Pondicherry,India
  • Inde
  • août 1998 à août 2005

1.To execute Regular maintenance and Trouble shooting of 8.5 MW electrical load connected 75 ton per / paper industry.
2.Energy Conservation study.
3. Action plans towards improving the equipment's healthiness.
4. Man Power utilization.
5. Trouble shouting works as required.
6. Materials request and procurement follow-up.
7. Equipment's history sheet maintenance.

Éducation

Baccalauréat, Electrical machines
  • à Annamalai university
  • juin 1995

Specialties & Skills

Testing
Troubleshooting
Installation
Maintenance
Power Distribution
Electrical Project Engineer
Electrical Maintenance
LV and MV equipments, switchgears
VFD's, Soft starters,MOV's,UPS's,Etc
Trouble shooting
Power distribution
Cost proposals
Sub-Stations maintenance up to 33 KV
Equipments size calculations
Transformers,Motors and Protection system and relays
PLC / HMI /Scada
Installation testing and Commissioning

Langues

Anglais
Expert
Tamil
Expert

Formation et Diplômes

(Certificat)
Date de la formation:
November 2014
Foundation Course on PCS (Certificat)
Date de la formation:
January 2010
Valide jusqu'à:
January 2010
PLC Programming and Applications (Certificat)
Date de la formation:
January 2008
Valide jusqu'à:
February 2008
Auto Cadd 2007 Electrical (Certificat)
Date de la formation:
June 2008
Valide jusqu'à:
September 2008
Siemens PLC and WinCC Programming (Certificat)
Date de la formation:
February 2012
Valide jusqu'à:
February 2012

Loisirs

  • Playing cricket
  • Watching football and Cricket