Work Experience

Total years of experience :8 years, 0 Months

Manager at L&T-OSWAL Infrastructures
  • India - Ahmedabad
  • August 2015 to February 2020

 Cultivation of ORC (Open, Resolve & closed) activity & trouble report system to reduce rejection.
 Responsible for construction and maintenance Of Hazira pipeline of 34 inches diameter and carrying out its Environmental Impact Assessment.
 Responsible to carry out detailed environmental impact assessment in Health Safety and environment operation.
 Responsible for handling contractors and managing the village activities and scheduling the respective meetings with the district authorities.
 Establish and promote maintenance of safe and healthy working conditions in a business through formulating general safety, fire prevention and health policies and measures.
 Devise and coordinate safety programs that will increase proficiency in safe practices and promote safety consciousness.
 Coordinate training for Emergency Response Teams set up in workplaces.
 Inspect the workplace regularly in cooperation with client agencies to audit safety and environmental procedures, and report findings to line management and client agencies as appropriate.
 Promote a proactive safety culture focused on incident prevention and regulatory compliance.
 Maintain, review and report safety performance, identifying opportunities for improvement along with implementing preventative and corrective actions as required.
 Devise, develop and monitor effective Risk Assessment management strategies and make
Recommendations on the implementation of these strategies. Liaison between management and staff on all matters relating to health, safety and Environment to ensure consistent application and understanding of policies and procedures.
QAP in line with MOP, preparing Quality Plans and Control Plans for assembly process.
 Responsible for designing out the piping layout and detailed engineering calculations of stresses and corrosion allowances.
 Responsible for carrying out process flow calculations and review of PID’s at various plants of ONGC and Reliance.
 In-process auditing, component auditing, calibration of pipeline and refinery equipments such as PIG’s, louvers and Heat Exchangers.
 Hands on experience in designing and carrying out detailed engineering calculations of pipes, stress analysis and its components.
 Responsible for installation of Pumps, Compressors, turbines and heavy machinery installation.
 Implementing 5 s, Preparation of Standard Operating Procedures (SOPs) along with carrying out energy audits and carbon rating at Enermax Singapore.
 Analysis of customer complaints, initiation of corrective and preventive actions for total customer Satisfaction.
 Implementing, monitoring, documenting ISO 9001 -2000 activities.
 One to one interaction with vendor in order to resolve their problem.
 Coordination with clients & third party inspection of heat exchangers, air coolers and condensers of RAC plants.
 Installation, maintenance and commissioning of pumps, compressors and operation of turbo-machinery at PETRONAS Malaysia.
 SWOT & PEST Analysis of various departments and data surveying. Responsible for team handling and future market predictions.
 Prepare equipment layout, Piping General arrangement drawings, main piping layout
 Prepare plant piping model with modelling software like Smart Plant 3D and PDS
 Piping system design as per ASME B31.3 and ASME B31.1
 Piping material selection, pipe thickness calculation, selection of class /ratings of flanges and pipe components based on pressure and temperature
 Perform piping design to satisfy Nozzle load calculations with optimum selection of support and routing
 Perform flange sizing and thickness calculation with proper selection of gasket and bolts.
 Preparation of line list, material list, material take off and generating BOM.
 Prepare / extract isometric drawings from Software like SP3D and PDS.
 Preparation of support drawings and auxiliary support steel requirements.

Assistant Project Engineer
  • January 2011 to March 2014

Responsible for handling a team of 15 members and technical coordination between them.
•Directs daily activities in the Engineering Division and is responsible for meeting engineering productivity objectives by overseeing engineering and design and coordinating inter-disciplinary work.
•Regularly establishes the status of engineering modifications, handles the exchange of data between disciplines, interfacing with procurement and construction, expediting routing of vendor documentation.
•Directs or participates in the preparation of, and executes job-specific tender packages and contracts for approved projects. Participates in bid reviews and contract negotiations and ensures proper execution of the project.
•Support the Third Party Inspection and document review from Client side.
•Participates in the HAZOP review process as required.
•Ensures all equipment on drawings and data sheets are properly identified with tag numbers for traceability throughout the project life cycle.
•Responsible for selection of valves, tubes, pumps and compressors and their selection
•Awarded by the company for timely completion of all the projects and targets
•Participating in a formal review of the project with relevant parties, on completion, to identify opportunities for learning and development.
•Responsible for planning and organizing all engineering activities of any modification in coordination with the job officers and planning engineer.
•Coordinates the input required from all disciplines as and when requested by the engineering contractor. Identifying and reporting all problems and arrears concern related to engineering and initiating the necessary remedial actions in consultation with Divisional Manager.

Project Intern at Oil and Natural Gas Corporation Cambay
  • June 2010 to July 2010

Product interphase calculation in different product pipelines in ONGC.
•Study and find the possible route of the pipeline under Reconnaissance Survey.
•Study and analysis of various pipeline construction processes.
•Maintenance of various equipment in the plant like strainer, tanks etc.
•Studied the Leak Detection System at ONGC - Brijwasan Terminal.
•Analysis of various reservoirs and there concerned software’s.

Education

High school or equivalent, Petro-Mechanical Engineering
  • at Pandit Deendayal Petroleum University Gandhinagar
  • January 2011

:-

High school or equivalent, Petro-Mechanical Engineering
  • at Central School
  • January 2007

marks (Physics: 60, Chemistry:-78, Mathaematics: - 85

High school or equivalent, Petro-Mechanical Engineering
  • at Bishop Conrad Senior Secondary School
  • January 2004

Maths:-92, Science: - 77, English: - 78, Hindi:-68)

Specialties & Skills

Project Management
Communications Engineering
Marketing Communications
Sound Design
AUDITING
CALIBRATION
CUSTOMER RELATIONS
CUSTOMER SATISFACTION
DOWNSTREAM
ISO 9000
LAYOUT DESIGN
MACHINERY

Languages

English
Expert
Hindi
Expert

Memberships

Society Of Petroleum Engineers
  • Organising technical debates and conferences and seminars
  • March 2012

Training and Certifications

Project Appraisals and Project Management (Certificate)
Date Attended:
June 2015
Valid Until:
September 2015

Hobbies

  • Watching Movies and Reading Economic Times and Times Of India and THE HINDU
    100 % Client satisfaction and full clearance of targets and Awarded by the President and VP for Excellent performance.