Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
SUSHEEL SHARMA, Senior Well Integrity & P&A Engineer

SUSHEEL SHARMA

Senior Well Integrity & P&A Engineer·Equinor

Malaysia

Master's degree, Petroleum Engineering

Work experience

Total years of experience: 17 years, 8 months

Senior Well Integrity & P&A Engineer

September 2024 - Present

Equinor

Stavanger, Norway

September 2024 - Present

P&A strategy, slot recovery planning, and post-abandonment barrier surveillance across 170+ legacy wellbores on the
Norwegian Continental Shelf — under NORSOK D-010 and Equinor internal governance.
• Full-lifecycle barrier integrity assessments across 170+ legacy wellbores — evaluating completion history,
barrier condition, and wellbore degradation to define abandonment scope and sequencing; delivered P&A
operations 33% under budget without compromising compliance or safety standards
• Develop fit-for-purpose P&A strategies for complex wells with legacy completions and non-standard barrier
configurations — including Bismuth Alloy barrier qualification and Section Milling/Casing Slotting programs
where conventional cement placement is not viable
• Design and technically verified Perforation, Wash & Cement (PWC) programs, ensuring permanent isolation
met NORSOK D-010 permanent plug requirements
• Conduct post-P&A barrier monitoring and integrity surveillance on abandoned wellbores; where barrier
degradation has been identified - design and execute well re-entries to restore permanent isolation to
regulatory standard
• Author well-specific barrier schematics, risk registers, contingency plans, and Detailed Operational Procedures
(DOPs); leading operational risk analysis meetings and author MOC documents for senior leadership and
Norwegian PSA
• Interface with subsurface, operations and maintenance teams to optimize slot recovery sequencing; verified
fluid/cement programs and reviewed BHA designs
• Capturing lessons learned and integrating into future programs, Wellcom updates, and DOPs — driving
continuous improvement across the P&A portfolio

Company industry:
Oil & Gas

Senior Well Integrity Engineer

December 2021 - January 2024

Hess — PETRONAS Operating Company,

Kuala Lumpur, Malaysia

December 2021 - January 2024

End-to-end ownership of asset WIMS governance, SCP management, and well integrity contract management across a
multi-well PETRONAS offshore asset.
• Owned end-to-end governance of the asset WIMS — ensuring 100% compliance with PETRONAS regulations
through audits, barrier verification, and integrity incident management
• Defined MAASP, MAWOP, and MOP for all wells; monitored annulus pressure trending and managed SCP
diagnostic campaigns including bleed-off/build-up surveys, tubing integrity tests, and leak detection logging
• Led annual well integrity audits across 142 wells — achieved 100% closure of all critical findings within 90 days
through cross-functional action plans and disciplined follow-through
• Revised 3 asset-wide integrity procedures (Barrier Verification, SCP Management, PM/CM Maintenance) to
align with PETRONAS WIMS and internal requirements — adopted across the full asset
• Contract and budget holder for 7 well integrity and intervention contracts totaling USD 14M+; negotiated
improved terms achieving 7% cost savings without scope reduction
• Delivered monthly integrity dashboards and risk mitigation roadmaps to asset leadership and cross-functional
stakeholders

Company industry:
Oil & Gas

Well Integrity Engineer

December 2019 - December 2021

ExxonMobil

Kuala Lumpur, Malaysia

December 2019 - December 2021

WIMS governance, SCP management, and P&A candidate assessment across ExxonMobils multi-field Malaysian
producing asset portfolio.
• Managed WIMS governance across a large multi-field portfolio — maintained 100% PETRONAS regulatory
compliance through WIMS audits, barrier verification campaigns, and integrity incident management
• Executed SCP diagnostic programs (bleed-off/build-up surveys, WHX seal tests, leak detection logging);
identified failed barriers and planned remediation in alignment with PETRONAS PPGUA
• Owned the Well Integrity assurance process — maintained all outstanding issues in WellView, ensured
resolution within PETRONAS WIMS frequencies, and prepared quarterly/annual integrity reports for senior
management
• Provided technical input to MPM-EVO/WIMG/AMIR regulatory submissions and compliance engagements
• Collaborated with drilling and wells teams on P&A candidate assessments — cementing, mechanical plug
programs, and wellbore isolation design — ensuring compliance with PETRONAS requirements and industry
standards

Company industry:
Oil & Gas

Petroleum Engineer

April 2018 - December 2019

Petronas Carigali - PTTEPI Operating Company (CPOC)

Kuala Lumpur, Malaysia

April 2018 - December 2019

Maintained gas deliverability above DCQ/CDC through proactive well management and rapid sick-well diagnosis. Planned and executed intervention programs (workovers, wireline, slickline, coiled tubing); designed WSO programs and rate exclusion strategies for high sand producers.

Company industry:
Crude Petroleum & Gas Extraction
Job role:
Engineering

Petroleum Engineer

October 2016 - January 2018

Vestigo Petroleum Sdn. Bhd. (PETRONAS),

Kuala Lumpur, Malaysia

October 2016 - January 2018

• Implemented Gas Gun technology in an idle well — added 200 bopd to daily production from a well that
would otherwise have remained permanently shut in
• Evaluated artificial lift technologies (ESP, PCP, nitrogen lift, CT-deployed systems) for idle well reactivation;
integrated technical-economic assessments for investment decisions

Company industry:
Oil & Gas

Production Technologist

June 2013 - September 2016

Petrofac Malaysia Sdn. Bhd.

Kuala Lumpur, Malaysia

June 2013 - September 2016

Real-time production surveillance on oil and gas wells using PI Process Book and AVOCET; monitored water cut, sand production, and GOR trends to optimize well performance. Planned and executed annual data acquisition campaigns (PLT, PBU surveys, flowing gradient surveys). Contributed to 1, 000, 000 man-hours without a single lost-time incident across all Petrofac-operated assets.

Company industry:
Crude Petroleum & Gas Extraction
Job role:
Oil and Gas

Senior Field Engineer

January 2011 - August 2013

WELLTEC OILFIELD SERVICES

Kuala Lumpur, Malaysia

January 2011 - August 2013

Executed 60+ well tractor, stroker, and milling operations across Asia Pacific; led sand clean-out campaigns in PNG, Malaysia, and Thailand — restoring 3, 000+ bbls combined production from shut-in wells
Performed first-ever lubricator valve and profile milling operations for Brunei Shell Petroleum on wireline — 100% success rate, recognised as an industry first

Company industry:
Oil & Gas
Job role:
Oil and Gas

Senior Field Engineer

January 2008 - January 2011

Archer (formerly Tecwel)

Kuala Lumpur, Malaysia

January 2008 - January 2011

• Led well integrity logging campaigns for ConocoPhillips, Brunei Shell Petroleum, and Petronas Carigali;
detected and permanently mitigated methane leaks from 1960s-vintage abandoned wells in South Sumatra
• Performed 25+ logging jobs across Peninsular Malaysia; mentored junior engineers and led technical sales
presentations across the region

Company industry:
Oil & Gas

Education

Heriot-Watt University

January 2016

January 2016

Master's degree, Petroleum Engineering

Malaysia

GPA (point): 3 out of 4

GPA (point): 3 out of 4

Production Technology Reservoir Engineering Applied Reservoir Engineering Drilling Engineering Petroleum Economics Formation Evaluation Petroleum Geoscience Final Year Project - Field Development Plan Submission Individual Thesis - Sand Control

University of Nottingham

January 2008

January 2008

Bachelor's degree, Mechanical Engineering

United Kingdom

Skills

WELL INTERVENTION
Intermediate
WELL INTERVENTION
Intermediate
ISO 16530
Intermediate
ISO 16530
Intermediate
Annulus Pressure Management
Expert
Annulus Pressure Management
Expert
MAASP / MAWOP / MOP
Expert
MAASP / MAWOP / MOP
Expert
NORSOK D-010
Expert
NORSOK D-010
Expert
Cement Bond Log (CBL)
Intermediate
Cement Bond Log (CBL)
Intermediate
Plug & Abandonment (P&A)
Expert
Plug & Abandonment (P&A)
Expert
Well Integrity Management System (WIMS)
Expert
Well Integrity Management System (WIMS)
Expert
Wellbore Mapping
Expert
Wellbore Mapping
Expert
Casing Integrity Assessment
Intermediate
Casing Integrity Assessment
Intermediate
Sustained Casing Pressure (SCP) Expert
Expert
Sustained Casing Pressure (SCP) Expert
Expert
Barrier Engineering
Expert
Barrier Engineering
Expert
Well Barrier Schematics
Expert
Well Barrier Schematics
Expert
Well Integrity Management
Expert
Well Integrity Management
Expert
Well Decommissioning
Expert
Well Decommissioning
Expert
Wellcom
Intermediate
Wellcom
Intermediate
Section Milling
Intermediate
Section Milling
Intermediate
Bismuth Alloy Plugs
Intermediate
Bismuth Alloy Plugs
Intermediate
Wellview
Expert
Wellview
Expert
Slot Recovery
Intermediate
Slot Recovery
Intermediate
Perforation Wash & Cement (PWC)
Intermediate
Perforation Wash & Cement (PWC)
Intermediate
Hydraulic Pull Tubing Unit
Expert
Hydraulic Pull Tubing Unit
Expert
Risk Assessment
Expert
Risk Assessment
Expert
Wireline Operations
Intermediate
Wireline Operations
Intermediate
Petronas WIMS
Expert
Petronas WIMS
Expert

Languages

Hindi
Expert
English
Expert
Malay
Expert

Hobbies

  • Swimming, Hiking, Cycling, Travelling