Swaminathan كريشنان, Engineering Manager - Hamriyah

Swaminathan كريشنان

Engineering Manager - Hamriyah

LAMPRELL ENERGY LIMITED

البلد
الإمارات العربية المتحدة - دبي
التعليم
دبلوم, Oil & Gas Well Technology
الخبرات
32 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :32 years, 2 أشهر

Engineering Manager - Hamriyah في LAMPRELL ENERGY LIMITED
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ يناير 2012

LAMPRELL ENERGY LIMITED, SHARJAH January 2012 to Present
Engineering Manager - Hamriyah

Look after the engineering department working and multiple projects for the facility for a turnover of approximately US 1.2 Billion dollars.

Engineering Manager - Sharjah, Hamriyah & Thailand في LAMPRELL ENERGY LIMITED
  • الإمارات العربية المتحدة
  • نوفمبر 2009 إلى ديسمبر 2011

LAMPRELL ENERGY LIMITED, SHARJAH November 2009 to December 2011
Engineering Manager - Sharjah, Hamriyah & Thailand

Manage the Engineering Department for the jack-up rigs, offshore & onshore drilling projects and the Living Quarters module business. Currently sized at 150 plus personnel of multi-discipline trades, the department looks after the Front End and Detailed phases of engineering on multiple projects as required. The main responsibilities include: • Manage the engineering resources efficiently
• Organise and Manage the deliverables required for a project
• Monitor Productivity, Change Management, provide technical support as required
• Prepare Cost Reports & various department operating statements
• Resource Panning, Cost Estimates & Earned Value Management
• Support direct reports as required; ensure project status is healthy
• Plan the engineering deliverables and organize resources appropriately
• Monitor the department's performance regularly and address challenges
• Take part in internal audits and assist in external audits related to engineering
• Assist in the integration of work flow between different departments - QC, Procurement
• Initiate regular trainings/participation in seminars in the engineering procedures, design process, industry working and software
• Personnel evaluation and career development
• Plan, recruit, train, employ & manage resources as required for successful execution of work
• Assist in Proposals
• Yearly Close Out reports

Engineering Manager- New Build في lamprell energy plc
  • الإمارات العربية المتحدة - دبي
  • أبريل 2008 إلى أكتوبر 2009

Experience - Highlights
Project Engineering & Management (12 years)
Project Engineering in the execution of both Onshore & Offshore projects. Presently manage the Engineering Department at Lamprell's facility in Hamriyah, Sharjah. Deal with multiple projects and project teams; liaise with the respective project managers as necessary to ensure that the engineering deliverables are produced on time and to budget. Deal with clients, sub-contractors and vendors regularly to develop project scopes of work, sequence of works and specifications.
Further, have been involved in the preparation, evaluation, submission and finalizing of tenders for various projects and have been part of the Proposals & Project Management Team.
Involved in the engineering operations for an annual company turnover in excess of US$ 1.2 billion approximately.
Manage a multi-racial, multi-cultural engineering team of 150 plus personnel.

Engineering (8 years)
Front end and detailed engineering, hook-up and assistance to commissioning for Onshore & Offshore rigs, platforms, accommodation & drilling modules.

Current Role - Look after the engineering department of over 150 personnel across all engineering disciplines.
Manage project deliverables, manage resources, plan work, manage change, monitor progress & productivity, ensure all project time and documentation are in order, conduct audits and action non-conformances and ensure smooth running of the department.

Engineering Manager - Projects في LAMPRELL ENERGY LIMITED
  • الإمارات العربية المتحدة
  • أبريل 2006 إلى يوليو 2008

LAMPRELL ENERGY LIMITED, SHARJAH April 2006 to July 2008
Engineering Manager - Projects

Am responsible for the operations of all Repair & Refurbishment projects for the and also took on the additional responsibility of managing all engineering disciplines (Structural, Piping, Electrical, Plumbing & Architectural)
My responsibilities included: • Engineering deliverables, resources allocation and day to day operation
• Liaise with the project teams, clients, Class authorities and the designated sub-contractors.
• Allocate resources, budget hours and chair internal meetings to disseminate the required information
• Prepare cost control reports; over spend reports and project reconciliation summaries as required.

Was involved in the full refurbishment of the rig "Nabors Rig 660" worth US$ 80 million. This included the fabrication of new legs, spud cans, quarters, drill floor and derrick. It also included the reinforcement of the original cantilever, new sponsons and hull replacement.

Engineering Manager - E&I في LAMPRELL ENERGY LIMITED
  • الإمارات العربية المتحدة
  • يونيو 2004 إلى أبريل 2006

LAMPRELL ENERGY LIMITED, SHARJAH June 2004 to April 2006
Engineering Manager - E&I

Responsible for all E&I front end and detailed engineering
• Manage the E&I engineering department
• Lead a team of engineers, draftsmen and designers
• Delegate scopes of work and ensure that the engineering deliverables are furnished in time
• Coordinate with the Project Management Team and clients
• Provide support to the Commercial department for change orders, reimbursements and the like • Assist in Proposals

A few Onshore & Offshore Projects
• KCA Deutag - Onshore Drilling Rig facilities, Oman
• Nabors Drilling - Diesel driven engine power houses (600VAC), Saudi Arabia
• Nabors Drilling - Accommodation Modules, Saudi Arabia

Senior Electrical Engineer في LAMPRELL ENERGY LIMITED
  • الإمارات العربية المتحدة
  • أبريل 2000 إلى يونيو 2004

LAMPRELL ENERGY LIMITED, SHARJAH April 2000 to June 2004
Senior Electrical Engineer

Responsible for all project related Electrical Engineering. Attend client reviews on engineering design, assist in the preparation of electrical estimates for additional and/or new work, check & review drawings for issue, prepare equipment specifications, prepare work completion schedules and take care of day to day engineering activities of the department.
Have assumed the role of a Project Engineer should the project call for a dedicated person for the interface between engineering and construction to ensure that the installation is as per the project specifications. Assistance to the pre-commissioning & commissioning activities, preparation of work completion reports, data sheets, test reports and liaison with the quality control dept. for final documentation and dossiers'. Liaise with vendors & suppliers for product evaluation and product compliance to the required specifications. Attend project review and client meetings. Report to the E&I Manager.
Perform all related electrical calculations and engineering on a regular basis.

Electrical Engineer في LAMPRELL ENERGY LIMITED
  • الإمارات العربية المتحدة
  • أبريل 1998 إلى مارس 2000

LAMPRELL ENERGY LIMITED, SHARJAH April 1998 to March 2000
Electrical Engineer

Responsible for electrical works associated with jack up rigs, drilling and accommodation modules. Report to Engineering Manager.
A few engineering responsibilities include: • Lighting & Small Power - Related Calculations
• Equipment Sizing, Switchgear design, selection of components
• Short Circuit & Coordination Calculations
• Cable Sizing, Volt Drop and related calculations
• Fire & Gas System, Public Address, General Alarm, etc. - Detailed Engineering

Yard Manager في GULF MARINE SERVICES
  • الإمارات العربية المتحدة
  • أكتوبر 1997 إلى أبريل 1998

GULF MARINE SERVICES, Abu Dhabi, UAE Oct 97 to Apr 98
Yard Manager

Gulf Marine Services is an onshore construction company based in Abu Dhabi that deals with construction related to onshore & offshore rigs and related facilities. My responsibilities included the management of the yard activities, work scope finalisation & delegation, labour & man-hour allocation, materials management, hire of the relevant personnel for the project, streamline work progress & overall management to the company's operation.

At the time, a new jack up rig, the Kamikaze II, was being built for Japan Drilling Company and was involved in the construction of this unit.

Assisted in the set-up of a CNC area for plate cutting & nesting operations.

Proposals & Project Management في McDERMOTT-ETPM EAST INC
  • الإمارات العربية المتحدة
  • أبريل 1995 إلى سبتمبر 1997

McDERMOTT-ETPM EAST INC, Dubai, UAE Apr 95 to Sept 97
Proposals & Project Management

McDermott-ETPM East Inc. is a globally renowned Onshore & Offshore Construction Company. Have handled proposals for turnkey Onshore & Offshore production platforms, Calm buoys, modules, marine jetty terminals and onshore production facilities as part of the Proposals & Project Management department. My prime responsibilities included:
• Management of small to medium Engineering & Construction projects
• The study & analyses of Techno-Commercial enquiries
• Preparation of the scope of work and dissemination of information to the respective departments for their inputs
• Preparation of technical & commercial qualifications for the proposal
• Preparation of man hour & cost estimates, S-curves, cash flow analyses and invoicing & payment schedules, Risk Analyses
• Holding liaison meetings with the clients and our internal departments

Some of the major clients that I have been involved with are: Total
Elf Petroleum
Qatar Gas Petroleum Corporation
Dubai Petroleum Company
Crescent Petroleum
Mobil
Enron

Electrical & Instrumentation Engineer في McDERMOTT-ETPM EAST INC
  • الإمارات العربية المتحدة
  • أبريل 1992 إلى مارس 1995

McDERMOTT-ETPM EAST INC, Dubai, UAE Apr92 to Mar 95
Electrical & Instrumentation Engineer

Worked as a Production Engineer department and was responsible for the installation, hook-up & pre-commissioning of electrical & instrumentation systems. Was involved in detailed hook-up engineering and design. Have traveled offshore for hook-up & commissioning assistance. Assisted in the preparation of FEED documents and assistance to feasibility studies for E&I for offshore projects.

A few of the major projects that I handled have been listed below:
Onshore Projects
• Bab Oil Separators, Foster Wheeler, UK - Abu Dhabi - Seventeen (17) three stage separators
• Onshore Equipment Skids - Bab Field Development, Abu Dhabi

Offshore Projects
• Qatar Upstream Development Project, QGPC - Two (2) wellhead platforms

الخلفية التعليمية

دبلوم, Oil & Gas Well Technology
  • في City & Guilds
  • يونيو 2000

• 2000 Oil & Gas Well Technology (level 1) City & Guilds, UK • In Progress Masters in Business Administration

بكالوريوس, Instrumentation Technology
  • في Mysore University
  • يناير 1992

• 1987 - 1991 Bachelor of Engineering in Instrumentation Technology Mysore University, India

بكالوريوس, Instrumentation Technology
  • في Malnad College of Engineering
  • يناير 1992

Further to engineering, currently pursuing an MBA from the Heriot Watt University, Edinburgh, Scotland. Also have attended Internal Audit & Safety Management courses.

Specialties & Skills

Engineering Liaison
Cost Engineering
BODY ENGINEERING
CLIENTS
COST ESTIMATES
ENGINEER
ENGINEERING DEPARTMENT
LIAISON
OFFSHORE
PRE-COMMISSIONING
PROPOSALS

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Oil & Gas Level 1 (تدريب)
معهد التدريب:
City & Guilds
تاريخ الدورة:
June 2000