Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
syahrial syahrial,  Engineering Assistant Manager

syahrial syahrial

Engineering Assistant Manager ·PT. Menarini Indria Laboratories

Indonesia

Bachelor's degree, 3.02

Work experience

Total years of experience: 25 years, 11 months

Engineering Assistant Manager

July 2000 - Present

PT. Menarini Indria Laboratories

Jeddah, Saudi Arabia

July 2000 - Present

• Report to Manager Service result from Analysis machine Break down and preventive
• Create weekly planning for preventive and job order
• Renewal calibration from external to internal
• Responsible to ensure all activities such as maintenance, repair, improvement, installation & commissioning
• Coordinate with other department regarding the technical specification of equipments, utilities and building to ensure meet with GMP standards.
• Planning and coordinating with contractors to ensure the project are executed as per the schedule and meet the GMP standard.
• Responsible to coordinate the team on the daily activities as well as preparation of documents regarding project and close monitor the progress.
• Establish plan to develop the technical skill of the team based on their competencies through trainings.
• Coordinate and supporting the team on trouble shooting of all possible technical problems in which it may occur.
• Responsible to build the vision, mission, strategy, action plan as well as the KPI of technical & engineering department.
• Supporting plant renovation project
- Improvement Energy Power saving less than 5 %
- Improvement external calibration Became Internal calibration
- Installation of Measuring System of Energy Consumption with Power Meter.
- Installation of Fire Hydrant in Office Building 2.
- Upgrade and execution the calibration program for all critical instruments.
- Project new Warehouse (Cold Storage 2-8 degree ) and control room ≤25 degree
- Project Silicone Gell (Medical Device)
- Project Tableting

Company industry:
Pharmaceutical Manufacturing
Job role:
Electrical Engineering

Supercharge Repair Supervisor

January 2015 - July 2015

PT. Astra Zeneca Indonesia

Indonesia

January 2015 - July 2015

• Planning and coordinating with contractors to ensure the project are executed as per the schedule and meet the GMP standard.
• Responsible to coordinate the team on the daily activities as well as preparation of documents regarding project and close monitor the progress.
• Establish plan to develop the technical skill of the team based on their competencies through trainings.
• Coordinate and supporting the team on trouble shooting of all possible technical problems in which it may occur.
• Responsible to build the vision, mission, strategy, action plan as well as the KPI of technical & engineering department.
• Coordinate with other department regarding the technical specification of equipments, utilities and building to ensure meet with GMP standards.
• Planning and coordinating with contractors to ensure the project are executed as per the schedule and meet the GMP standard

Company industry:
Pharmaceutical Manufacturing
Job role:
Engineering

Supervisor Maintenance

August 2013 - January 2015

PT. Guardian Pharmatama

Indonesia

August 2013 - January 2015

• Make time Table preventive and maintenance .
• Make permanent procedure qualification installation and operational
• Monitoring and reporting HVAC, Plumbing compressed air and genset.
• Test run facility ( BAS system, HVAC system and water system)
• Support qualification project
• To implement the quality and GMP management system in daily activities
• Responsible to ensure all activities such as maintenance, repair, improvement, installation & commissioning
• Coordinate with other department regarding the technical specification of equipments, utilities and building to ensure meet with GMP standards.
• Planning and coordinating with contractors to ensure the project are executed as per days schedule and meet the GMP standard.
• Responsible to coordinate the team on the daily activities as well as preparation of documents regarding project and close monitor the progress.
• Establish plan to develop the technical skill of the team based on their competencies through trainings.
• Coordinate and supporting the team on trouble shooting of all possible technical problems in which it may occur.
• Responsible to build the vision, mission, strategy, action plan as well as the KPI of technical & engineering department.

Company industry:
Pharmaceutical Manufacturing
Job role:
Engineering

Foreman or Supervisor and Operator

July 2000 - August 2013

PT. Tempo Scan Pacific

Indonesia

July 2000 - August 2013

• Execute, control progress and review result of preventive and job order status
• Maintains and and ensure availability of consumbale parts
• Create weekly planning for preventive and job order
• Responsible for assuring the process equipment is always ready to use.
• Responsible for reporting any maintenance, technical issue in production and packaging area.
• Responsible for implementation of Environment, Health and
• Safety programs according to company standards or relevant
• government regulations in the area of responsibility / activities.
• Prepare purchase requests, keep the engineering stocks, and
• maintain proper documentation.
• Assuring the implementation of all projects can be done as per the timeline.
• Support the execution of qualification and calibration program.
• Trouble shooting of all possible technical problems in which may occur.

Key Achievements
• Installation of new Machine Mixing Diosna
• Renewal installation electrical to PLC machine Uhlman stripping
• Establish Maintenance Management System Software along with IS Dept

Company industry:
Pharmaceutical Manufacturing
Job role:
Engineering

Education

Duta Bangsa College

February 2012

February 2012

Bachelor's degree, 3.02

Indonesia