SYED HABIBUR RAHEMAN, Factory Manager

SYED HABIBUR RAHEMAN

Factory Manager

AL BAYAN GROUP[Riyadh]:KDH Steel Industries,an unit of ABG,established in the year 2009 at Riya

Lieu
Inde - Bengaluru
Éducation
Baccalauréat, Mechanical Engineering
Expérience
16 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 4 Mois

Factory Manager à AL BAYAN GROUP[Riyadh]:KDH Steel Industries,an unit of ABG,established in the year 2009 at Riya
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis janvier 2008

AL BAYAN GROUP\[Riyadh\]:KDH Steel Industries, an unit of ABG, established in the year 2009 at Riyadh, IInd Industrial Area, KSA
By me with the latest and highly sophisticated heavy duty European CNC machines of Brand:Messer-Germany, Hausler-Switzerland, Kaltanbach-Germany Trumph-Germany& Vernet Behringer-France, catering to the present Demand of steel structural fabrication and lattice steel tower manufacturing in the Kingdom.We are ISO Certified\[IND13.4266UQ by Bureau Veritas\]& ASME Certificates of Authorization U#4935, PP#4936&S#4936 and leading in the market with the approval of established companies like NWC, TYPSA, Alfanar, Obeikan, Sceco and Saudi Oger:KDH in this short span of last 8 years.We have expertized in fabrication & Installation of Furnace for the HDG plant of Bath Size:15x2.5x1.8m-Designed by KORNER Germany-in Galvanco, Riyadh
Tenure:July, 2008 on wards Till date

As PLANT HEAD, at a Well Reputed GALVANIZING & STEEL POLES Company\[GALVANCO\], Riyadh, KSA.It has a Tower & Poles Section, a larges well reputed an ISO9001:2000 certified company \[Cert.Regn No: 0410020001186\]
Designing, manufacturing, testing and Galvanizing \[HDG\] of Transmission, Lighting Poles for SCECO, EC& other clients of Kingdom and abroad. It does the High Mast of 30-35 Meters of High for Stadium and Swimming pools consisting of 40-60 luminars.We do our special product of High Mast with Raising Lowering system \[LATCH TYPE\] of height 20-35 meters .We manufacture the Self Supported Lattice HT&LT Transmission & Communication Towers \[GSM\] of different heights \[30 to90mtrs\], Non-Penetrating Rooftop Towers \[9M to 15M\] for Saudi Telecom for its GSM E5&E7-C&I Project supplied to Ericssion, Nokia, Madaf, Natel & other erection contractors of STC.We are already APPROVED by SEC-East as Transmission Towers Manufacturer and ITISALAT for the Manufacturing of Telecom Towers in the Kingdom.

 I have developed the complete Drilling system specially made for Transmission Poles Drilling for SCECO for a very fast rate of Production up to the length of 15MTRS Poles\[SCECOOC1 to 15s\] and the special LATCH system for High Mast with Lowering and Raising System\[Mobile Bracket\] up to a height of 35 meters carrying 12-24 lumminars/lights Etc.for Highways

Éducation

Baccalauréat, Mechanical Engineering
  • à INSTITUTION OF ENGINEERS {India}
  • mars 1988

B.E Mechanical: The Institution of Engineers, Calcutta, [INDIA] Certified Internal Auditor for TUV,Germany ISO Certification-9001:2008 Diploma in Computer Application-ACADEMY OF COMPUTER APPLICATION,Bhubaneswar,INDIA

Specialties & Skills

Galvanizing Plant Furnace Fab& Installation
Transmission & Telecommunication Towers
Heavy Engineering
Manufacturing
Production
ESTABLISH THE COMPLETE MANUFACTURING LINE FOR STEEL LATTICE TOWER & HEAVY STEEL STRUCTURES
MANUFACTURE THE HEAVY SAW MACHINE FOR POLES MANUFACTURING LINE
MANUFACTURES JIB & EOT CRANE FOR 1T TO 5T CAPACITY UNDER MY DIRECT SUPERVISION
DEVLOPED & ESTABLISH HIGH ECONOMY MAST MANUFA. LINE WITH LATCH SYS.
Machine & Manpower Management on Steel Structural Fabrications

Langues

Anglais
Expert
Arabe
Expert
Urdu
Expert
Hindi
Expert

Adhésions

THE INSTITUTION OF ENGINEERS{INDIA}
  • ACTIVE PARTICIPANT &ORGANISE SEMINARS
  • May 2007
Saudi Council of Engineers
  • Professional Mechanical Engineer
  • February 2009

Formation et Diplômes

Graduate Engineering Degree (Certificat)
Date de la formation:
March 1990

Loisirs

  • New Factory Setup,Manpower hiring,Invention of New Techniq
    Establish New Latch System in High Mast