SAUDI ARABIA
• Prepare two week look ahead schedule & follow up the site activity as per schedule.
• Preparation of loop folder for field instruments
• Preparation & submittal of Pre Energisation package of Power panel Switch rack
• Preparation of red marks up as per site conditions & as per Approved NMR GA drawings.
• Inspected all installation activities of building electrification, power systems (power,
lighting & cable routings).
• Fully involved in MS approval, FAT, delivery, Inspection & Installation SAT of MV
Switchgears (13.8 KV) (ATS Panels, Incoming feeders & Outgoing feeders).
• Fully involved in MS, FAT, delivery, Inspection & Installation, SAT of Distribution
Transformers and (13.8 KV / 0.4 KV)
• Inspection & Installation of Low voltage routing for all equipment and Pulling L.V. Cables
(0.6/1 KV) for low voltage systems (Air cooled chillers, cooling towers, water
pumps, MCC and services panels
• Inspection &Installation of electrical low voltage and low current systems (Lighting,
Power, fire alarm & Earthing system…etc).
• Inspection & Installation of Service Panels ( Lighting, Power .. etc.
• Inspection & Installation of Motor control centers ( MCC ) for Water Pumps ad AHUs.
• Inspection & Attendance Testing of MV SWG Panels and transformers.
• Preparing Take off lists of Materials of all electrical systems
• Inspection of high voltage test of MV cables(185, 300mm2)
• Inspected all installation activities of building low current systems.
• Inspected all installation activities of Lighting, grounding, cable tray of S/S, PIB building
system.
• Prepare the MIR for material.
• Inspected all types of materials
• Coordinate with testing engineers, contractors & manufactures.
• Inspection the installation of all type of external work i.e., Duct Bank road lightings &,
buried cables for low voltage, MV as per MEP coordination drawing.
• Closed the SON, s and NCR, s.
• Review all shop drawing related to electrical power systems and low current system
• Laying of power and Instrument Cables along with their termination In Instrument JBs &
PIB room, RTU
• Construction execution plan (construction sequences, logistics, planning scheduling,
controlling, monitoring activities.
• Constructability studies.
• Subcontractor identification & evaluation.
• Work Requisitions.
• Review of temporary facilities
• Identifying the engineering requirements in line with scope of work and technical
documentation.
• Estimation and budgeting for proposal.
• To resolve the issues during the execution stage. In depth coordination with QC
supervisor for closing of all punch list RFI and LBE.
• Monitoring project cost and making sure to achieve the given schedule on time by
making look ahead schedule and material availabilty from Aramco as well as contractor
supply.
• Detailed verification of given scope and identifying JSI for additional work or any
changes as per IFC
• Conducting delay progess review meeting with construction teams, identifying
bottleneck, and pro-actively removing them.
• Plan and co-ordinates the execution of the project as per scope of the project
• Ensure proper installation of equipments as per the drawing codes.
• Ensure that all the cable laying and termination of all equipments is in line with the
design.
• Ensure the testing of all cables/equipment is in accordance with the design
codes/standards.