سيد عبد القادر مغربي, Planner

سيد عبد القادر مغربي

Planner

Al Yamama company

البلد
المملكة العربية السعودية
التعليم
بكالوريوس,
الخبرات
0 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :0 years, 0 أشهر

Planner في Al Yamama company
  • المملكة العربية السعودية - الجبيل
  • فبراير 2020 إلى سبتمبر 2020

Tasnee Petrochemical : Rental Employee
Thru Expertise Company - Designation: Sr. Maintenance Analysis & System

Sr. Maintenance Planner في SAED International
  • المملكة العربية السعودية
  • يوليو 2018 إلى يوليو 2019

SABTANK:- King Fahad Industrial Port Client: SABIC Jubail)

•Gathering all the information Date for equipments and uploading in SAP thru transaction ID of IE01 IP10 IP24 with completing of Scheduling as required.
•Working with Sabic Client and serving ours Experience’s with SAP & Administration Skill including our regular planner work. as well as Issuing a PR through SAP.
•Obtaining approval of the projects & materials from the client.
•Documents handled: Work Orders, Notifications, Release Purchase Order, Service Entry Sheet. Also closing of notifications & work order’s after completing the job.
•Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipments & machinery.
•Prepare Maintenance strategies through Asset maintenance work process
•Prepare performance gaps of related Equipments of Identified
•Manage all Plant Maintenance through SAP preventative maintenance
•prepare & Develop, document of Asset Maintenance Work Processes performance measures
•Participation relevant cross-functional improvement.
•Prepare & Analyze the maintenance KPIs
•prepare & analysis result level of compliance
•normalize KPIs reporting of Asset maintenance work process performance



• (Asset Health Care/AHC) · Develop Hierarchy · Develop Criticality · Develop Equipment Condition · Establish Strategies for Component Care · Develop Failure Modes and Effects · Develop Maintenance Activities Working with one unit or department at a time, these steps develop the system of proactive Asset Healthcare.
1. Acquire, Install and Train in AHS Software 2. Develop the Equipment Hierarchy. 3. Develop Criticality 4. Develop Equipment Condition. 5. Develop Strategies for Component Care. 6. Develop Failure Modes and Effects. 7. Develop (Asset Healthcare) Maintenance Activities.

A new language can help us break the paradigm of predictive and preventive maintenance as suitable for all types of risks and conditions. The Asset Healthcare framework will simplify the effort to create a comprehensive maintenance program for equipment, and match the effort and type of intervention specifically to the criticality of the system and the component. Our results include proactive maintenance for all components, an ability to create an activity-based maintenance budget, gaining control of the work schedule, improved equipment health and lower costs.

•(Asset Maintenance Work Process:/ AMWP)
A sound AMMS has to be viewed as belonging to and involving the entire organization, not just the maintenance department. The primary purpose of an AMMS and its accompanying components (programs, tasks, activities, etc.) is to:

1. Know exactly what assets you have (i.e., those that you are responsible for operating, monitoring and/or maintaining); 2. Know precisely where your assets are located; 3. Know what condition your assets are in at any given time; 4. Understand the design criteria of your assets and how they are to be properly operated and under what conditions; 5. Develop an asset care, or maintenance, program that assures that each asset performs reliably

Sr. Maintenance Planner في International Construction & Manufacturing Service
  • فبراير 2016 إلى يوليو 2018

SABTANK:- King Fahad Industrial Port Client: SABIC Jubail),

•Working with Sabic Client and serving ours Experience’s with SAP & Administration Skill including our regular planner work. as well as Issuing a PR through SAP.
•Obtaining approval of the projects & materials from the client.
•Documents handled: Work Orders, Notifications, Release Purchase Order, Service Entry Sheet. Also closing of notifications & work order’s after completing the job.
•Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipments & machinery.
•Prepare Maintenance strategies through Asset maintenance work process
•Prepare performance gaps of related Equipments of Identified
•Manage all Plant Maintenance through SAP preventative maintenance
•prepare & Develop, document of Asset Maintenance Work Processes performance measures
•Participation relevant cross-functional improvement.
•Prepare & Analyze the maintenance KPIs
•prepare & analysis result level of compliance
•normalize KPIs reporting of Asset maintenance work process performance

(referred to as reliability) when it is needed (referred to as availability); 6. Acknowledge and perform all of the above activities to optimize the costs of operating your assets and to extend their useful life at least to, if not beyond, what the initial design and installation specified.

Identifying Assets 2. Asset Location, 3. Asset Condition 4. Asset Design Criteria; 5. Asset Care Program
6. Optimizing Operation Costs 7. Conclusion

Work Control Supervisor في Al-Yamama Contracting Company
  • المملكة العربية السعودية
  • مايو 2013 إلى ديسمبر 2015

Maintenance & Operation Division

Maintenance Planner في Saudi Oger Limited
  • بريطانيا العظمى
  • يناير 2010 إلى مارس 2013

Maintenance & Operation Division

Maintenance Planner في BADER H. AL-HUSSAINI & SONS Co
  • سبتمبر 2007 إلى نوفمبر 2009

Maintenance & Operation Division

الخلفية التعليمية

بكالوريوس,
  • في Institute of Computer & System Science, Bundalkhand University
  • يناير 2007

Specialties & Skills

SAP2000
CLOSING
CUSTOMER RELATIONS
FUNCTIONAL
MACHINERY
MATERIALS MANAGEMENT
PRESS RELEASES
PROCESS ENGINEERING
REPORTS

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس