Electrical Engineer
DAAR
Total years of experience :31 years, 7 Months
Professional Experience
DAAR July, 03 till-to-date)
Presently engaged with DAAR - AL-QASR, The site area is approximately 762, 228 m² which is 250 villas & 110 residential & commercial buildings being basement +4 floors, managing project as owner representative with Turner International & Dar Al Handasa. Cost of project @ S.R 1600 M
• Eshbiliya Project: Project in the North East of Riyadh Total Built up Area: 650, 000 m2 Total 405 Villas, Palaces, Mosque, and With Estimated Cost S.R. 360 Millions. (Completed)
• Makkah: Supervision of high rise buildings - 7 towers (Abraj Al-Mashair) in MAKKAH (Al-Azizia) and in charge of maintenance. Towers beings 6 + 12 floors. (Completed)
• Al Rabiea Project: In The North of Riyadh Total Built up Area 2, 97, 000 m2 Total 264 Villas & Mosque with Estimated Cost of S.R.145 Millions. (Completed)
• Al-Taa'won: North east of Riyadh Total built up area 120, 000 m2 and total 44 with estimated cost of S.R. 55 millions. (Completed)
Link Technology Eshtablishment. (Dec, 1999 to Nov, 2003)
• Served as site engineer for the project of infra structure (municipality services) for residential project In Medina.
• Mosque / Villas / Modification works / industrial modification works and Schools construction.
AL-Moddarag Establishment. ( Mar, 2003 to July, 2003)
• Served as site engineer for construction, operation & maintenance of (3) Nos 850 KW of Diesel Power plant on Saudi Dubai border for Power Distribution /under ground cabling & Maintenance.
Tetniya Electro-Mech'l Services Co. (Dec, 1998 - Nov, 1999)
• Served as Electro / Mech'l engineer for the project of Al-Naseem super market. Scope of works electrical & Mech'l system under floor metal ducting / Fire alarm /sprinkler system / HVAC / installation of switchgear. Estimated Cost of Project S.R. 35 millions.
• Served as site Electro/Mech'l engineer for the project of Tabuk Air Base as sub-contractor of AL-Saif co. for electro-Mech'l works. scope of works is Run way lighting / modification of Air craft hanger / under ground cabling / Fire fighting system / lightening system /modification of Hazard area (Missile storage) Cost of contract S.R. 195 millions
Arabian Operation & Main. Establishment (Oct, 1992 - Nov, 1998)
• Ministry of Defense & Aviation -
Project: Furnishing of Residential and Administrative Building
Al- Kharj.
Served as site engineer for the project, Leading a team of supervisor /Foreman and electricians, projects beings basements, ground and first floor, Prisoner block and auditorium. Responsible of preparing shop drawings and obtaining pre-execution approval and electrical materials as per requirement / contract. Coordinating with structural architectural and mechanical section. Project consists the system BMS / Fire alarm / highly advance centralized security system / PABX / Centralized P.A system / HVAC/ Air handling & Chiller plant / 8 Nos Pad mounted sub-stations / under ground power, communication cabling /under floor ducting cabling. Covered area of the project @ 95, 000 m2 and project cost S.R. 185 millions.
o BE in Electrical Engineering from NED university, Karachi in 1992. o General Evaluation: Ist Division