Syed Mohamed Mussammil سيد, Electrical QA QC Inspector

Syed Mohamed Mussammil سيد

Electrical QA QC Inspector

Elmech Electromechanical works LLC

البلد
الهند
التعليم
بكالوريوس, Electrical & Electronics Engineering
الخبرات
18 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 5 أشهر

Electrical QA QC Inspector في Elmech Electromechanical works LLC
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يوليو 2015

 Preparation of Inspection Test Plan for Installation
 Preparation of Inspection Checklist in accordance with ITP and Project Specifications.
 Reviewing of Material Submittal as per Project Approved Manufacturer list, Vendor list and Supplier list.
 Reviewing of Transformer & Panel energization and Motor solo run test Package.
 Reviewing of Third Party testing Procedure as per Project Requirement and Testing Report as per Criteria, Approved Procedure and NETA.
 Responsible for the implementation of Quality Control System related electrical works accordance with project specification and Engineering Standards. As per project QA/QC plan.
 Verify the equipment and devices used in the project meet the required specification as per project requirements, Standard and tested in accordance with the procedures.
 Report to QA/QC Supervisor on the day to day basis. As per project QA/QC plan.
 Supporting monthly (PQI) Project Quality Index.
 Attending QA/QC weekly meeting with Project/Company QC Persons.
 Coordinate with Client representatives regarding the implementation and Quality of works.
 Monitoring QA/QC Assistants and Field Technicians Performance.
 Verifying Randomly QA/QC Documents and LOGs.
 Verify all required inspection report and test records are systematically generated and compiled to the approved QC Procedures.
 Initiating Proactive Notifications to avoid future complications or violations.
 Initiating Internal NCR’s for all non-Conformances in the project as per Schedule -Q.
 Verify all required inspection report and test records are systematically generated and compiled to the approved QC Procedures.
 Preparation of Energization Procedure as per Project Specifications.
 Prepare System wise packages for final walk through.
 Preparing Exception Item List (Punch List items) for all pending and no-conforming activities in the project.
 Supporting Final Hand over of System package

Electrial QA/QC Inspector في Nasser S. AlHajri Corp.
  • المملكة العربية السعودية - الجبيل
  • مايو 2010 إلى أكتوبر 2014

 Preparation of Inspection Test Plan for Installation
 Preparation of Inspection Checklist in accordance with ITP and Project Specifications.
 Reviewing of Material Submittal as per Project Approved Manufacturer list, Vendor list and Supplier list.
 Reviewing of Transformer & Panel energization and Motor solo run test Package.
 Reviewing of Third Party testing Procedure as per Project Requirement and Testing Report as per Criteria, Approved Procedure and NETA.
 Responsible for the implementation of Quality Control System related electrical works accordance with project specification and Engineering Standards. As per project QA/QC plan.
 Verify the equipment and devices used in the project meet the required specification as per project requirements, Standard and tested in accordance with the procedures.
 Report to QA/QC Supervisor on the day to day basis. As per project QA/QC plan.
 Supporting monthly (PQI) Project Quality Index.
 Attending QA/QC weekly meeting with Project/Company QC Persons.
 Coordinate with Client representatives regarding the implementation and Quality of works.
 Monitoring QA/QC Assistants and Field Technicians Performance.
 Verifying Randomly QA/QC Documents and LOGs.
 Verify all required inspection report and test records are systematically generated and compiled to the approved QC Procedures.
 Initiating Proactive Notifications to avoid future complications or violations.
 Initiating Internal NCR’s for all non-Conformances in the project as per Schedule -Q.
 Verify all required inspection report and test records are systematically generated and compiled to the approved QC Procedures.
 Preparation of Energization Procedure as per Project Specifications.
 Prepare System wise packages for final walk through.
 Preparing Exception Item List (Punch List items) for all pending and no-conforming activities in the project.
 Supporting Final Hand over of System package

WORKINGS AS MAINTENANCE ENGINEER في EMPOWER SYSTEM PVT LTD
  • الهند - تشيناي
  • سبتمبر 2007 إلى أبريل 2010

 Control & Maintenance work of Induction motors.
 Maintenance of Oil Circuit Breaker
 Maintenance work of Transformers.
 Cable continuity test, insulation test and Earth test.
 Fault attending and Fault clearing
 Cable glanding, Cable termination.
 Execution of daily, monthly, half yearly and annual preventive maintenance work according to the schedule.

AN OPERATION & MAINTENANCE ENGINEER IN SHANTHI ENTERPRISES في Shanthi Enterprises
  • الهند - تشيناي
  • مايو 2005 إلى أغسطس 2007

KEY RESPONSIBILITIES:
• Control & Maintenance work of Induction motors.
• Maintenance of Oil Circuit Breaker
• Maintenance work of Transformers.
• Cable continuity test, insulation test and Earth test.
• Fault attending and Fault clearing
• Cable glanding, Cable termination.
• Execution of daily, monthly, half yearly and annual preventive maintenance work according to the schedule.
.
PERSONAL DOSSIER


;
;
;

الخلفية التعليمية

بكالوريوس, Electrical & Electronics Engineering
  • في Anna University
  • مايو 2005

• B.E., Electrical & Electronics Engineering, Anna University.

Specialties & Skills

Testing
Construction Drawings
Construction Methods

اللغات

الانجليزية
متوسط
التاميلية
متمرّس

الهوايات

  • Playing Table Tennis, Cricket