Electrical Engineer
Alfanar company
Total years of experience :11 years, 3 Months
Experienced electrical engineer with a dedicated experience in oil and energy industry, power plants, gas plants .Main role and responsibilities in enginerining, design review, modification, upgrading, Testing, Commissioning and Maintenance of plants and substation. FAT test, SAT test. Pre-Commissioning and commissioning activities. Dedicated Experience in Electrical Power Transmission Systems 500 kV, 380 kV, 132 kV, 110 kV GIS/AIS, Power Transformers upto 1GVA, HV Cable upto 380KV along with PD.
Comprehensive understanding of electrical health and safety regulations.
AREAS OF EXPERTISE
Testing and Commissioning
Testing of All Power Transformers up to
1000 MVA, 380 KV
Testing of Cables up to 380 KV with Partial Discharge.
Motor Testing
Instrument Transformer
Testing(CT’s/VT’s)
. GIS High Voltage Testing
Battery Charger Testing
UPS Testing
Testing of Transmission Line or Cables Parameters
Testing of MV Cables by VLF
Testing of GIS up to 132 KV with Partial
Discharge
Testing of Cables up to 380 KV with
Partial Discharge.
Substation Maintenance
Substation Operation
TESTING INSTRUMENTS USED:
Resonant frequency high voltage test kit
MPD600 for partial discharge of hv cable,
MPD600, MCU, RING CT.
Sverker 780 Relay Test system.
Omicron CT Analyser
Omicron CPC100.
ODEN- Primary Current Injection System.
Zera Meter Test Systems.
Circuit Breaker Analyzer & Timer - Agile
Tan delta kit- DELTA 4000 - Megger.
Insulation Analyser S1-1054/2 - Megger
Leakage Reactance Tester MLR10 - Megger
Dissolved Gas Analysis (DGA) GE-
Kelman
SF6 Gas Analyzer- DILO & MBW.
SF6 Guage Calibration - DILO.
Trafo Resistance Meter TRM104 Scope.
Contact resistance - MOM600A
Programma.
Programma.
Hipot Kit- 880PL Series DC Hipot Tester of
Hipotronics
Transformer Winding Resistance Meter
Timing Interval Meter- Scope
Contact Resistance Meter-Scope
Multimeter- Fluke
Clients & Project Experienced:
Air Products: Air Separation Unit (ASU) - Gas Integrated Company
Jazan Oil Refinery Project
SEPCO II : Power Plant (Combined Cycle) - Jazan Oil Refinery Project Power China Nuclear Company
Saudi Aramco: 1:Safanya GOSP
2:Haradh GOSP(Gas and Oil Separation Plant)
3: Yanbu South Terminal 4: Abu Ali Island Jubail
Saudi Electricity Company :
1. 380KV SS SAFA RIYADH (SEC) 2. 380KV SS Metro 9054 RIYADH(SEC)
3.
4.
5.
6.
7.
8.
9.
10. THUMAMA 132KV SS ROYAL GUARD RIYADH (SEC) 11. JEDDAH CENTRE 380KV SS (SEC)
380KV SS Mtero 9053 RIYADH (SEC)
PP7 RIAYDH
AL UQAIR 380KV SS DAMMAM (SEC) JABAL AL QARA 115KV SS HAFUF (SEC)
MUHAIRUS 115KV SS HAFUF (SEC)
MBS 110KV SS MADINAH (SEC)
TURAIF WADA AL SHAMAL 380KV SS PHOSPHATE PLANT (MADEN)
12. AL SHAYBAN ABHA 132KV SS (SEC) SADAF SABIC PETROCHEMICAL PLANT JUBAIL
Electrical substation engineer
S.Sc (Science) 1st BISE Peshawar
Degree/ Certificate Division Board /University