Tabarak Hussain, Assistant Resident Engineer

Tabarak Hussain

Assistant Resident Engineer

DAR Consult

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Civil Engineering
Experience
26 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 0 Months

Assistant Resident Engineer at DAR Consult
  • United Arab Emirates - Dubai
  • My current job since November 2016

in a reputed organization.
• Civil Engineering All India Council of Technical Education Bangalore
(Recognized By AICTE, India). Passed in May 1998, B.TECH Civil Eng.
Professional Project Management Program (PMP) Cambridge Institute,
Dubai.


 DUBAI SILICON PARK/ DIGITAL PARK

Silicon Park located in Dubai silicon oasis the project LG+UG+4Th Floor Multiuse buildings Residence, offices Hotel, Boutique, Fitness center, Business center. All building connected through UG slab (Podium), One Site Lake situated along with fountain (water feature) which increase the beauty of Park. Total parking 1617 nos. Total build up area 235477.64 M2 and estimated cost of this project AED 1.5 billion


• Computer program-MS office, Auto CAD and general computer knowledge.
• Course in PMP- Project Management Professional.
• Experience in Project Management.
• Scheduling on supervision on construction industry Engineering and high-rise building, theme park.
• Intensive technical experience in materials specifications, supervision and quality assurance of all construction activities.


• Reviewing and following up all technical submittals.
• Review and follow up contractor methodology and program.
• Following up the quality control plan and periodic test report.
• Issuing and following up Method statement ITP-inspection test plan.
• Planning and controlling for smooth running of all construction activities to ensure timely completion of the projects.
• Assess preparing monthly report and monitoring weekly reports as per approved program.
• Dealing with client and contractor in project technical issue.
• Monitoring safety procedure to ensure the proper implementation during the construction as per the project safety plan.
• Reviewing and commenting of Shop drawing, Method statement, Material submittal and other technical submittals.
• Inspection as per quality plan and joint inspection with authority.
• Assist in preparation of contractor’s interim payments.
• Lead the supervision team and establish the job descriptions and make the responsibilities matrix for all the parties, as per the contract condition.
• Supervision and quality assurance of all construction activities.
• Managing of outstanding work, snags and knowledge of project handing over procedure.

Project Engineer at IMG Group Them Park
  • United Arab Emirates - Dubai
  • January 2011 to October 2016

 IMG THEME PARK-(IMG WORLD OF ADVANTURE CITY OF ARABIA)

Centrally located within City of Arabia. Sheikh Mohammed Bin Zaid Road (formerly
Emirates Road), Dubai, UAE, IMG World of Adventure is the First integrated
Entertainment Designation in the Middle East and the only private entertainment
Facility in the entire Asian continent to feature attractions as per with other
Internationally renowned parks. And this inside the largest temperature controlled . indoor entertainment destination in the world. Designed to attract in excess of 20, 000
Visitors per day IMG World of Adventure is combining the very latest in themed
Attraction, Rides, edutainment and international branded content all under one roof and
Spanning in excess of 1.5 Million sqft. Park divided into four zones
1.CARTOON NET WORK 2. ENTERTAINMENT ZONE 3.LOST VALLEY 4. MARVEL
Estimated cost of this project AED 1.5 billion.

Assistant Resident Engineer-Civil at Khatib & Alami (Consolidated Engineering Company)
  • United Arab Emirates - Dubai
  • May 2007 to May 2011

 Office/ Residential Tower on Plot A3 at Jumeirah Lake Towers, Dubai U.A.E.

Office cum Residential tower comprised of retail space at the concourse level +35 floor
Amenity deck, Mechanical floor, 358Apartments consisting of 226one bed room &132 two bed room flat in addition to basement levels. Estimated cost AED 215 million


 Infinity Tower (Dubai Marina)

The project world’s tallest high rise building with twist of 90°. Each floor is rotated by 1.2° to achieve the full 90° spiral, creating the shape of helix Located in Dubai marina, the building is 330m high and 73 stories. The main components are residential apartments, conference rooms, tennis courts, pools, a state of the art gymnasium, a nursery and a spa Project area is 1, 200, 000ft2.The estimated cost of the project is AED1000 million


 Jumeirah Lakeshore Tower

Ground floor + 44 floors, mechanical floor and services on roof, 374 apartments consisting of 30nos studios + 165nos 1 bedroom + 153nos 2 bedrooms + 22 nos. 3 bedroom + 4nos of penthouse, 2-3 basements (parking) for a total parking spaces of 477. Estimated cost AED 225 million


 Sahara Mall Expansion: Phase 1, Sharjah, U.A.E

The project is extension to the existing Sahara Center Shopping Mall located in Al Nahda Block of Sharjah Emirate. The main components are 2 nos. Basements to accommodate 953 Car Parking Spaces, Ground Floor with Entrance hall / Reception areas, First Floor with 15400 M2 of Commercial Space and two Podium Floors containing Parking Facility for Residential Towers situated above the Structure has been connected to existing Sahara Shopping Mall at First Floor Level through a Link Bridge. Total Built up area of the Residential / Commercial Development is 48120 M2 and Estimated Construction Cost AED 600million

 Al Ali Multiuse Complex- Novotel Hotel

The project consists of three towers, Hotel, Residential, and Office towers as follows.
• HOTEL TOWER: With 3-Basement levels, Ground floor, Mezzanine floor, 1to6 podium floor, 7th floor, 8th to 41st floor in addition to furnished floor
• RESIDENCE TOWER: with 3-Basement, Ground floor, Mezzanine floor, 1to6th podium floor, 7th floor, 8th to 41st floor, Technical floor& roof
• OFFICES TOWER: with 3-Basement, Ground floor, Mezzanine floor, 1to 6th podium floor, 7th floor, 8th to 41st floor, Technical floor, roof
The Estimated cost of this project is AED 838 million

Construction Manager at Bait Al Yazi Contracting LLC
  • United Arab Emirates - Dubai
  • April 2002 to April 2007

 Male & Female School& Accommodation complex @ Madinat Zayed City; Western Region

The main component of this project are several type of classes, wet lab, Dry lab, Library, Swimming Pool, Sports hall, Football stadium, Located in Abu Dhabi Madinat Zayed Western Region. The Client of this project is Abu Dhabi National Oil Company (ADNOC). The Estimated cost of project is AED 290 million.

 Hotel Apartment

The Project is Hotel &Apartment located in Hamriya (Bur Dubai). The Main Component is 3no. Basement to accommodate 68 car parking space, Ground Floor with Entrance Reception, kitchen, sitting Arrangement. The Building consist of (3B+GR+Roof)
8no.Flats Top Roof Swimming Pool & Gym Total Buildup area of the Residential/Commercial Development is 7720M2 and Estimated Construction Cost AED35 million

 Luxurious Villa 3Group

Ground Floor+2Floors+Roof The consist of Living, Dinning, Kitchen, 3Bed Room attached Bath Room, Gym, Maid Room& Swimming Pool. It is located in Mirdif up Town Area. The estimated Construction Cost AED 25 million & Total Build up area for Commercial Development is 4718M2

Civil Engineer at M/S Ajit Building Contracting Ltd -India
  • United Arab Emirates - Dubai
  • May 1998 to March 2002

 CONSTRUCTION OF BRIDGE ON WAGH RIVER & ROAD

Construction of Bridge on wagh river having 13 spans completed with full super vision in India (Ojhar khed Maharashtra).

Construction of Asphalt road with complete work handed over in India (Ghoti Maharashtra).

Education

Bachelor's degree, Civil Engineering
  • at Shridhar University
  • May 2013

B. TECH Civil Engineering

Specialties & Skills

COUNCIL
MECHANICAL
MICROSOFT OFFICE
PROJECT MANAGEMENT
AUTOCAD
COMPUTER SKILLS
CONTENT MANAGEMENT
CUSTOMER RELATIONS

Languages

Arabic
Expert
English
Expert
Hindi
Expert
Urdu
Expert

Training and Certifications

PMP-Professional Project management Program (Training)
Training Institute:
Cambridge Education

Hobbies

  • Architectural Drawing