Tahir Waseem Malik, Manager production

Tahir Waseem Malik

Manager production

Olayan Descon

Lieu
Pakistan
Éducation
Baccalauréat, MECHANICAL ENGINEERING
Expérience
14 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 2 Mois

Manager production à Olayan Descon
  • Arabie Saoudite - AlJubail
  • janvier 2010 à janvier 2014

Manufacturing steel product like pressure vessels, heat exchangers, columns, storage tanks, piping, structure etc.
Shutdown maintenance works.
Construction projects.

Deputy Manager à Heavy Mechanical Complex Taxill
  • janvier 1987 à janvier 1997

FABRICATION OF PRESSURE VESSELS AND OTHER STEEL EQUIPMENTS):
- Manufacturing LPG Tanks, Heat exchangers, Boilers, Ammonia evaporators, Columns,
Storage tanks, piping, fin fan coolers, Cement plant equipments, Sugar plant equipments,
Overhead cranes, structure, stacks, ducting etc.
2. Production Manager with Olayandescon company KSA, Duration: 1997 to 2012
WORK NATURE (FABRICATION AND SHUTDOWN MAINTENANCE WORK):
- Manufacturing of pressure vessels, piping, structure, storage tanks, columns, heat exchangers
Kiln shells, Silos, ducts, stacks etc.
- Shutdown maintenance work on Petrochemical plants including plant modification, upgradation
Re-tubing of heat exchangers, furnaces, boilers, fin fan coolers etc.
- Refurbishment of pressure vessels, columns, storage tanks, piping.
- Replacement of shells, ducts, hoppers, piping, structure, columns, vessels, dust collectors,
Belt conveyors and other equipments of cement and petrochemical plants.
Details of few fabricated ASME Coded equipment.
Description client completion date
Product Purge bins Kemya/parsons 1999
Blow down drum kemya/ABB Lummus 1999
Column reflux drum
Debutanizer reflux drum
Dilution steam drum
Dry flare drum
Heavy oil separator vessels
Propane vaporizer drum
Cooling water expansion drum
Sulphur guard vessels Saudi Aramco 2002
Condensate pre-flash drum Snampprogetti 2002
Fractioner K.O Drum Khuff condensate project
Heavy Naphtha Stripper for Aramco
Kerosene stripper
Thermal Oxidizer stack Technip coflexip Italy 2003
Spray cooler Saudi Aramco 2003
Page # 2 of 6
Air surge drum Flour Arabia 2002

à Water, Caustic Sod
  • janvier 2001 à

Pipeline

à Dip column Saudi Aramco 2004
  • à

.S.A 2004

Repair à LP
  • Maroc
  • à

2004

à INTERNATIONAL DUCTILE IRON PIPES Co. Ltd (INDIPCO) Construction of 4inch Gas Metering
  • à

1 KM
2007
ADVANCED POLYPROPYLENE
CO. (APPC) / SAUDI ARAMCO /
SAMSUNG
Construction of Propane & Sales GAS
to Advanced Polypropylene Co.
(APPC) including civil works & 02 nos.
Metering Stations
Dia: 10" & 6"
Length: 1.5 KM
2007
GAS/ ADVANCED
POLYPROPYLENE CO. (APPC)
Construction of Gaseous Nitrogen
(GAN) Pipeline from GAS to
Advanced Polypropylene Co. (APPC)
including civil works & 01 nos.
Metering Stations
Dia: 10" & 6"
Length: 1.3 KM
2007
AR-RAZI UP Grading of RG Lines
Dia: 20" - 1/2"
Length: Various
Lengths
2007
SAUDI ARAMCO (HwGOSP - 4)
Remediation of Damaged Flare
System
Dia: 36"
2006
GAS

à Construction of Gaseous Oxygen (GOX)
  • à

(GAN

Manager Operations à Amwagalmaadan Company
  • Émirats Arabes Unis
  • à

Build infrastructure of steel fabrication workshop.
- Arranged fabrication team for the company.
- Support in business generation.
- Execution of equipments for industry in Riyadh KSA.

Manager Operations à CHIYODA PETROSTAR LTD. Saudi Methanol (SIPCHEM)
  • Émirats Arabes Unis
  • à

various lengths
2004
GAS
Construction of Gaseous Nitrogen
Line with Metering Station for SIPC in
Port area
Dia: 8"
Length: 0.9 KM
2004

Éducation

Baccalauréat, MECHANICAL ENGINEERING
  • à University of Engineering & Technology, Peshawar
  • janvier 1987

Specialties & Skills

Production Techniques
Manufacturing Management
Execution Skills
Bid Support
CUSTOMER RELATIONS
OIL PAINTING
PRODUCTION MANAGEMENT
ACCOUNTANCY
BUDGETING

Langues

Anglais
Expert
Coréen
Expert