Tai Al Khairi, General Manager

Tai Al Khairi

General Manager

Protec Technical Solutions LLC

البلد
الإمارات العربية المتحدة
التعليم
ماجستير, Power
الخبرات
16 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 7 أشهر

General Manager في Protec Technical Solutions LLC
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ مايو 2013

* Overseeing all administrative functions of the daily business.
* Delegates administrative tasks, such as accounting, paperwork and payroll, while giving you
the freedom to deal with other issues.
* Ensures administrative efficiency, proper procedure, implementation of policies and employee
morale.
* Analyzing situations and determine the best course of action.
* Managing both the revenue and cost elements of the company (P&L).
* Oversees the marketing and sales functions as well as the day-to-day operations of the
business.
* Responsible for effective planning, delegating, coordinating, staffing, organizing, and decision
making to attain desirable profit making results for the company.

Technical Manager في Al-Baneen
  • الأردن
  • أغسطس 2006 إلى مارس 2007
Operations Manager في EnviTech Middle East LLC
  • الإمارات العربية المتحدة
  • أبريل 2007 إلى مارس 2007

* Provides daily supervision and coaching for the project management team.
* Formulates procedures, project organization structure, planning the project execution and
stages of project execution activities.
* Set goals, priorities and analyze problems, identification of issues and corresponding actions
whenever encountered during project implementation.
* Develops, implements and manage prime strategies standardized project management
processes and systems.
* Leads the team in achieving the successful project execution and completion and weekly
project team meeting.
* Demonstrates continuous effort to improve operations, decrease turnaround times, streamlines
work processes and work cooperatively and jointly to provide quality seamless customer
service.
* Monitors financial management systems of projects including sourcing, budget
management/reporting, cash requisitions and supplier payments.
* Monitors and ensures adequate and sufficient material supply for all projects.
* Monitors an audit team performance using metrics, teams input and client feedbacks.
* Evaluate project expenses and approve expense and material requisitions.
* Prepares timely reports on project status, e.g. progress, delays, obstacles, etc.
* Here are some of the projects:
 Artificial lake project: 45kWp off grid in the middle of the desert.
 Masdar PV test field: 43kWp grid connected.
 The desert camps: 30kWp off grid + Solar cooling +water desalination plant
 The guard room's project: 55unit in remote area each 1.5kWp plus 1kW wind turbine
 The desert water channels: 14 channel each 50kWp off grid.
 Sheikh Sultan Mosque: 55kWp grid connected (part of the solar roof program)
During my work in the Renewable energy & water treatment projects I made a very good experience
in solar power system and wind turbine generators (Design & installation). As well as the first
installation in the region for the solar cooling technology using absorption chiller and thermal
collectors as a heat source.

Senior Project Manager في Air conditioning services, interior decoration 3D design and
  • يونيو 2001 إلى أبريل 2006
Senior Project Manager في Siemens
  • العراق
  • إلى

an exclusive Agent for SIEMENS Medical Solution Company in Iraq for
Electrical and Mechanical works, was responsible for numerous installation, commissioning and
operation contracts.
* Started as field engineer for the pneumatic systems and mechanical equipment in the medical
fields
* Installation for the safety alarm systems.
* Installation of medical equipment: Zeiss Surgical microscope with laser and digital cameras.
* Installation and commissioning of medical equipment such as MRI & CT scan.
* Installation and commissioning of air-conditioning systems, packages and chillers units.
* Installation and commissioning of UPS units and Diesel generators (250kva-1750kva)
Responsibilities:
* Coordination with Subcontractors, engineers, and field personnel to fulfill the job requirements
within project budget.
* Provided technical guidance and assigns work to project startup engineers, technicians and
others who are performing specific assignments.
* Planned, scheduled, conducted and coordinated detailed phases of startup, operations, or
maintenance for the project, including reviews of designs for operability and safety and jobsite
pre-commissioning and startup assignments.
* Assisted with the preparation of operations’ manuals.
* Planned, guided and prepared project administrative and technical documents as required for
startup, maintenance, operation.
* Trained assigned Governmental personnel and assisted them in their professional development.
In addition to the above technical duties, I was also involved in the marketing of the different

الخلفية التعليمية

ماجستير, Power
  • في University of Technology
  • يناير 2002

Simulator for Thermal design of heat exchanger type shell and tube. That takes about 24 months then I get

الثانوية العامة أو ما يعادلها, Power
  • في University of Technology
  • يناير 2002

Simulator for Thermal design of heat exchanger type shell and tube. That takes about 24 months then I get

بكالوريوس, Mechanical Engineering
  • في University of Technology
  • يناير 1999

Specialties & Skills

ACCOUNTANCY
ADMINISTRATION
DECISION MAKING
GENERAL MANAGEMENT
MANAGEMENT
MARKETING
ORGANIZATIONAL SKILLS
PAYROLL PROCESSING
POLICY ANALYSIS

اللغات

العربية
متمرّس
الانجليزية
متمرّس