Tamer El Saeidy, Cost Control Area Manager

Tamer El Saeidy

Cost Control Area Manager

Palm Hills Development

Lieu
Egypte - Alexandrie
Éducation
Baccalauréat, Civil engineering
Expérience
17 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 8 Mois

Cost Control Area Manager à Palm Hills Development
  • Egypte - Alexandrie
  • Je travaille ici depuis septembre 2017

1.Develop project budget.
2.Maintain budget to consider cost variations due to either market change or project scope change to revise it and produce a new version of project budget.
3.Participating in preparation of the project annual cash flow chart.
4.Revising for approval all project costs and contractors' monthly invoices.
5.Determining the project total actual cost, percent of completion, Estimate to complete budget and current earned value.
6.Preparing the monthly Cost Performance Report shown project progress, ETC, EAC, Earned value for each work item.
7.Revising for approval variation orders and contractors' claims if any and determining the cost impact on budget.
8.Applying value-engineering concepts by monitoring the functionality of project design for all work items and execution progress.
9.Participating in project management process, issuing early warning, giving recommendation and requesting any corrective actions for project management team.
10.Participate and arrange project coordination meetings.

Cost Control Senior Engineer à Palm Hills Development
  • Egypte - Alexandrie
  • janvier 2015 à septembre 2017
Cost control and Planning engineer à MENA for Touristic and Real Estate Investment
  • Egypte - Alexandrie
  • novembre 2010 à décembre 2014

Project: MENA-5 Touristic Village, North Coast, Egypt with estimated value of LE 465 million.

Project manager: MENA for Touristic and Real Estate Investment co.

Duties and responsibilties:
1.Produce and maintain the project plan and annual cash flow considering the annual project budget and estimated liquidity to achieve the project planned time/cost according to the project’s feasibility study.
2.Estimating and analysis Cost /time for project’s work scope for updating project’s feasibility study.
3.Following up work execution and determining any deviation to the scheduled time/cost plan and reporting it as a risk for making the required recovery decision.
4.Preparing variation orders for contracts due to scope or design change and analysis estimated time/cost impact.
5.Reviewing and approving contractors' claims due to variation orders' time/cost impacts and analysis the newly added items not included at the contract BOQs if any.
6.Produce and maintain detailed times plans which show the milestones/estimated cost and full scope of work for project.
7.Scheduling the project base line and track the project time/cost schedule.
8.Monitor project progress and preparing periodically reports (weekly/monthly report) which determine the deviations occurred and shown reasons of deviation and recommendations to enable the client to deliver their commitments on time and within budget.
9.Issuing 4 weeks look ahead time schedule.
10.Participate in updating the project’s feasibility study.

Technical Office engineer à Orascom Construction Industries
  • Egypte - Alexandrie
  • août 2008 à novembre 2010

Orascom Construction Industries -BESIX, Egypt
Project: Sidi Krir 750 MW combined cycle power plant
Consultant: (PGESCo).
Participate in implementing technical office policies and procedures as:
1.Monitoring the work activities and submit daily and weekly reports detailing the work progress versus the time schedule.

2.Preparing the Construction Completion Certificates (CCC) for the work phases as per the project contract and coordinate their approval process with the project consultant.

3.Studying and preparing requests for information (RFIs) for all missing, unclear, conflicting or other technical matters that may arise during construction.
4.Preparing the required correspondences and documents as Field Change Requests, Method Statements and letters.

5.Following up the recent received drawings and the change notices provided by the project’s consultant and determine any conflicts or work variation.
6.Preparing the work assessment of the variations included in the Change Notices provided by the project’s consultant.

7.Preparing the Shop Drawings for civil works as Concrete Neat Line, Steel reinforcement, miscellaneous steel, concrete embedment, Hand rails and finishing details.
8.Preparing the steel reinforcement bar bending lists.
9.Reviewing subcontractors’ shop drawings as well as outsourced shop drawings and coordinate their approval process with the project consultant.
10.Prepare as-built drawings at the end of the project and hand over to the project consultant

11.Preparing the material Take Off sheets and making the final check with the Owner to be included in the invoices.
12.Tracking manpower with the execution team.
13.Participate in solving / report any unexpected technical difficulties, and other problems that may arise during construction to the Technical Office Manager for discussion and proper solve.

14.Following up the onsite subcontractors work progress and preparing the invoices.

Site Engineer à ALFATH BLDG. Contracting Company
  • Émirats Arabes Unis - Dubaï
  • janvier 2007 à août 2008

Project: Residential Building, Sharjah, U.A.E.
Client: Mubarak Abdul Aziz Al Hassawi.
Consultant: KHATIB & ALAMI Consolidated Engineering Company.
Position: Site Engineer
Duties and responsibilties:
1.Managing and supervision for the structural works, Issuing quotations, sub-contractors agreement and the documentary works.
2.Managing and supervision for the structural works at Project of renovation and reconstruction an existing building including demolition woks and planting columns in the existing building's footing for the new structure system. Issuing the works method statements, shop drawings and all the documentary works with the Project's consultant.


Project: Infrastructure project of water transmission and distribution under ground pipelines network (Dia. 1200 mm), Dubai, U.A.E.
Client: Dubai Electricity and Water Authority (DEWA).
Consultant: KCC company \ Dar El Handasah company.
Position: Site Engineer
Duties and responsibilties:
1.Managing and supervision for all engineering works at Infrastructure site in project of Water Supply pipelines laying for "Dubai Electricity and Water Authority (DEWA)", including managing the equipments and labors works.

Steel structure detailer à TEKLA Corporation-Egypt, Alexandria office
  • Egypte - Alexandrie
  • septembre 2006 à janvier 2007

1.Detailing of steel structure shades and preparing the shop drawings, assembly and fabrication drawings.

Éducation

Baccalauréat, Civil engineering
  • à Faculty of Engineering, Alexandria University
  • juin 2006

Graduation Project: Full structural design of an industrial steel structure including the following points: -Loading and force analysis for the structure. -Design and checking safety for all members. -Drawing Plans and outlines of the project. -Project grade: Excellent.

Specialties & Skills

Cycle Time Reduction
Progress Monitoring
Construction Detailing
Technical Reports
Schedule Control
AutoCAD
Primvera
TEEKLA X-Steel

Langues

Anglais
Expert
Italien
Moyen

Formation et Diplômes

Planning and Scheduling Professional (PSP) (Formation)
Institut de formation:
Palm Hills Learning and Development Department by The American University in Cairo
Date de la formation:
September 2016
Durée:
35 heures
Certified Cost Professional preparation Course (CCP) (Formation)
Institut de formation:
Palm Hills Learning and Development Department by The American University in Cairo
Date de la formation:
December 2015
Durée:
49 heures
- Project Management Professional (PMP) ® Overview Preparation Course (Formation)
Institut de formation:
AMIDEAST-Alexandria, Egypt
Date de la formation:
July 2015
Value Analysis/ Value Engineering (VA/VE) Program (Formation)
Institut de formation:
Palm Hills Learning and Development Department
Date de la formation:
July 2017
Durée:
28 heures
PRIMAVERA® Project Planner P6 (Formation)
Institut de formation:
New horizons, Alexandria
MBTI-Presenting Type in Organizations Course (Formation)
Institut de formation:
Palm Hills Learning and Development Department
Date de la formation:
August 2016
Durée:
14 heures
Claims & Conflict Resolution Course (Formation)
Institut de formation:
Palm Hills Learning and Development Department
Date de la formation:
September 2016
Durée:
28 heures
Understanding FIDIC’S standard form of contract (Formation)
Institut de formation:
Palm Hills Learning and Development Department
Date de la formation:
December 2016
Durée:
28 heures
Effective Communication & Building Trust Course (Formation)
Institut de formation:
Palm Hills Learning and Development Department
Date de la formation:
August 2015
Durée:
14 heures

Loisirs

  • Horse Riding Sport