project manager
infrastructure
Total des années d'expérience :18 years, 6 Mois
Sewage network (UPVC160 : 400mm), forcemain (HDPE 250mm), pumping station .
• Management and supervision the Civil,
mechanical and Electrical
Work
Industrial Valley Phase 3-Infrastructure Construction Works, in King Abdullah Economic City.
- Main Lines and plot connections for All Network (sewage &storm &potable) Water, (M.V&L.V) Electrical cable, Telecomm system & Highways.
inferastrucure project, sewage main lines in north
Jeddah
- Main lines(VC 400:600mm, GRP 800:1200mm)
open trench
- Management and supervision the Civil works for open trench( surveying, excavation, concrete structures, piping, finishing, inventory and invoices).
supervision and management of the site for
- storm water network project
- water transfer lines for irrigation project
:
• Water treatment plant project at king Abdul-Aziz medical city.
- The aeration tank, sedimentation tank, sludge tank, chlorination tank, control room, collection tank, electromechanical works .
• Sewage network and lift station project in alshefa area.
- Main lines, house connections, lift station, pressure line, slow down tank, electromechanical works.
• Water network project in tomair area.
- Main lines, valves chamber, fire hydrant, house connections.
- Sewage network in albetash area(300:1200mm),
tunnel under railway aldekhela port (RCP1800mm)
, development sewage lift station
(from dry to wet system) in albetash area,
rain water lift station and pressure line in aldekhela port.
almandra and aleslah train stations project
- The station buildings, sidewalks, umbrellas and metal pedestrian bridge.
- Supervision the Civil works ( surveying, demolition, excavation, concrete structures, finishing, inventory and invoices).