Project Manager
General Work Authority
مجموع سنوات الخبرة :24 years, 7 أشهر
Project: Road and Infrastructure in Semaisma Package 4 (DS140-P04)
Project Cost: 288 million QR
Client: M/s public work Authority (Ashghal)
Consultant: CEG International
Project Construction Manager
Project description:
∙ Construction of a gravity sewer network in Semaisma, pump station PS-S1(290 L/S), twin permanent rising mains from PS-S1 to discharge chamber in Umm Garn, and gravity turn main from the discharge chamber to the existing shaft 70/T13 in Al Shamal road, house connection for all the plots within the project.
Project: Construction of East Industrial Road Between Al Muntazah Street and West
Corridor (P017 C2)
Project Cost: 200 million QR
Client: M/s Tekfen/Public work Authority (Ashghal)
Consultant: Parsons
Senior Construction Manager
Project description:
∙ Construction of East Industrial Road between Al Muntazah Street and West Corridor (P017 C2) involves the construction of approximately 2.5km of new Expressway. The scheme consists of a raised viaduct structure with three signalised at- grade junctions at Street 41 (17/EIR-02), ), Perimeter Road (17/EIR-02A) and Street 47 (17/EIR-03), and a three lane collector road system on each side of the mainline. The dual four lane carriageway from project P010 is reduced to a dual three lane carriageway on the approach to the viaduct structure.
Project: New Orbital highway, Contract 3 Project, Design and construction new Orbital
Highway & Truck Route (PO23)
Project Cost: 5 billion QR
Client: Public work Authority (Ashghal)
Client representative: KBR.
Consultant: Aecom
Project Manager (Acting)
Project description:
∙ This contract encompasses approximately 55Km of dual carriageway and includes five two-
level interchanges with 7 lanes in each direction. Located to the Southwest of Doha, this
contract starts at Mesaeed Industrial City interchange and reaching up to Salwa Road.
∙ The Project consists of Earth works, Road work, Asphalt works, Utilities works and structure
work consists of 5 interchange bridges in addition to 16 underpasses otherwise 16 crossings
for QP lines through concrete arches.
Job description/ Role:
● Develop, execute and manage the project plan and delivery to ensure project completion in
accordance with the time, cost and quality objectives.
● Coordinate site to ensure smooth functioning of all departments.
● Ensure compliance with Quality and HSE requirements.
● Coordinate with Project Director to finalize project budgets, plans and delivery schedules, other than conflict issues with the client.
● Coordinate with Project Director, Chief Technical Officer and HR Director to staff the project team in a timely manner.
● Conduct routine project site inspections.
● Conduct regular project meetings with internal and external teams (client, consultants, contractors, etc.) for project tracking and progress review.
● Present reports to management and clients as required.
● Interface between client and consultants (and contractors) for monitoring work completions and payment issues etc.
● Monitor documentation for claims management.
2010 - Present Gulf Contractor company- GCC Abu Dhabi, UAE
Construction Manager
Work in the Project Management section as a construction manager, for a job description;
- Preparing material requisition schedules for the project.
- Preparing the required resources from machineries, equipments and manpower for the
Project.
- Maintain the site activities and keep ahead with the construction programme.
- Maintain the quality control and cost control for the project.
- Coordination for the subcontractors with the consultant.
- Attending the monthly progress meeting and safety meeting with client and consultant.
Projects
• Project, Contract No. O- 1651, Construction of TSE Transmission pipeline - AlMafraq to AlWatba, A project of 57 million UAE dhs. ( 2010 )
• Client, ADSSC. Abu Dhabi Sewerage Services Company.
• Consultant, Parsons International limited.
• Project Brief;
* Laying of TSE raising main line 900mm dia. 13 km with successfully pressure and deflection tests parallel with construction of wash out, air valves, take off chambers and thrust blocks.
* Rehabilitation of old existing line 900 mm dia. 5 km, Valves and Valve chambers.
* CIPS works (Refurbishment of existing assets, Surge Vessel).
* Following subcontractors (CCTV survey, Scada, Electromechanical).
• Project, Contract No. O-1434, Al Ain Asset Enhancement Scheme
Construction of Trunk Sewerage and TSE Infrastructure - Part 1
A project of 740 million UAE dhs (2011-2012).
• Client, ADSSC. Abu Dhabi Sewerage Services Company.
• Consultant, Hyder Middle east limited.
• Project Brief;
* Trunk sewer GRP line 1800 mm dia about 33 km, transfer wasted water to the main
Pump station.
* Twin line of TSE 1200 mm dia GRP line about 31 km shifting the treated water for
Irrigation purposes.
* Two pump stations; Al Hamah Main Pump Station, Intermediate Pump Station.
• Project, Hidd Al Saadiyat (the Eco- Point Development) Saadiyat Island.
A project of 180 million UAE dhs. (Recently 2013).
• Client, SDIC Saadiyat Development and Investment Company.
• Project Manager/ Engineer, LEAD.
• Consultant, Aecom Middle East Limited.
• Project Brief;
A project for developing a round 1 million square meters of the island to establish a residential village.
All infrastructure utilities to be constructed;
* Foul Sewer Network, Including one Pump Station and one Lifting Station.
* Storm Water Network.
* Potable water Network.
* Irrigation Network.
* Electrical Network.
* Telecom Network.
* Road Work.
UMM EL QUWAIN - FALAj EL MULLA HIGH WAY ROAD PROJECT 60 k/m 150 million Dhs.
Consultant; Ital consult.
Owner; Ministry of work.
Following Structure of Under passes (coordinating between supervision of the execution, project manager and consultancy aprovel).
Road work ( cutting - filling- road construction ), Services ( water lines 40 k/m - etisalat 53 k/m - ele. cables relocation-Drainage systems - road crossing-all protection for all services obstruct the work),
Professional experience 2009- 2010 Hedley International Co. Dubai, UAE
Infrastructure Site Agent
Work in the Project Management section as Site Agent, following up laying of 3 raising main lines 1600mm dia with successfully pressure and deflection tests parallel with construction of wash out, air valves chambers.
• Project, DS - 161, Sewage pumping station XI, Its rising mains- A project of 450 million UAE dhs.
• Client, Dubai Municipality.
• Consultant, Associated Consulting Engineers (ACE).
2007- 2008 Youksel International Contractor Dubai, UAE
Work as site agent engineer for supervising the shop drawings & NOC’s submissions and following up for infrastructure works, road works (earth works cut, fill, sub base, road base, wet mix, DBM base coarse and wearing coarse.)-And civil works for roads (kerbstone, structure camel under pass works, stone pitching rip rap.
• Project, R 762/1 Widening of Dubai Bypass road.
• Client, Roads& Transports Authorities (RTA).
• Consultant, Wilber Smith Engineering.
2006 - 2007 Royal Contractor Company Ajman, UAE
Project Manager
Work as project manager for controlling all the site works and following with the consultant and the client for payment, cash flow, progress meetings and quality control of the works to follow the schedule of works (clause 14).
A project of internal plot 40, 000 square meters including earth works for internal roads& parkings and external service road, infrastructure (sewage& drainage& irrigation& water networks) and structure works for 2 irrigation water tanks 10000 gallons, retaining wall, otherwise of soft& hard escape
• Project, Construction of Ajman Fruits& Vegetable market. (33 millions UAE dhs).
• Consultant, AlTurath consultant.
• Client, Ajman Municipality.
*Structure Engineer Following Steel Fabrication-Fixing, Ascafolding-Formwork, Casting Concrete For High Building Tower Hotel in Central Area Of El Madina El Monawara(3 Basements, 14 Floors, Helepad, Area 3700 m2, 160 Millions Reyals Cost)
*Following Structure Work (Steel fixers, carpenters in making formworks-shutter, Casting Concrete) for Box culvert Under Roads 3.2Km And Open Channel 2.8Km & Following The reconstrution of Roads over The Box Culvert.
-60 Millions Ryals Cost For Drainage of Heavy Rain Project In Mina-Muzdalefa (Makkah).
preparing Shopdrawing, Intrem, Payment for Subcontractor, Supervise The work In Site(Irrigation Network, Drainage Network, Electric Network, LandScape)For Sector 4 Left Project In Dream Land New Down
Study The Projects And Estimate The Cost- Period, Study The Design Drawing And Make Shopdrawing, Prepare The SubContractors Payment, Checking The Progress In Sites
Civil Works (Infrastructure, highways, pumpstation,Buildings)