Tanveer Shahzad, Sr.Officer (Maintenance, TAR Planning)

Tanveer Shahzad

Sr.Officer (Maintenance, TAR Planning)

Attock Refinery ltd

Lieu
Pakistan
Éducation
Diplôme, engineering drawing, workshop practice ,welding
Expérience
12 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 0 Mois

Sr.Officer (Maintenance, TAR Planning) à Attock Refinery ltd
  • Pakistan - Rawalpindi
  • Je travaille ici depuis avril 2016

PLANNING:
• Prepare the plans & optimization for assigned plant.
• Responsible for work order, Invoices, PRs and SRs status review.
• Prepare the all KPIs and reports.
• Compilation of complete Job Packages which comprises of detail job scope, Resource estimation plan (Equipment & Manpower), Spares, Reference Drawings, Technical Procedures, HSE require-ments and Job schedule.
• Initiation & expediting the spares procurement process in close co-coordination with Materials & Inventory Department to ensure the deliveries on time.
• Extraction of data & compilation of Preliminary Turnaround Job lists. (Stationary, Rotary & E&I).
• Conducting Scope optimization Workshops with Operations, Inspection and Maintenance per-sonnel to finalize & freed the jobs list.
• Responsible for mobilization, scaffolding, insulation and painting jobs
• Define schedule priorities and assign to each work list item.
• Develop manpower requirements and leveling. Monitoring and update the progress & punch list clearance.
• Preparation of turnaround report with actual resources consumed along with lessons learnt upon the completion job.
• Documents and revises procedures to provide work instructions for corrective
Maintenance repairs, preventative maintenance, and implementation of modification.
• Shutdown & projects budget preparation & cost control throughout all the phases.
• Incorporate Preventive Maintenance Schedules (Time Based & Meter Based) in Maximo.
• Issuing and insure the work permit by using PTW system.
• Data Gathering and Mapping of Refinery Assets, Job Plans, Preventive Maintenance checklists and Failure Classes in Maximo.
• Perform RCM analysis on the basis of the information available through KPI’s Failure Analysis reports and result sets
• Responsible for other tasks assigned by supervisor and Department Manager
MAXIMO System:

• Day to day Troubleshooting of Maximo end users problems
• Preparing / Designing of Process Flows governing Maintenance / Engineering Department
• To conduct Maximo Training Sessions on regular basis to improve the end users performance.
• Efficient use of KPI’s & Business Analysis Reports for improving Asset Performance & Plants reliabil-ity.
• To develop new reports as per requirement
• To prepare Monthly reports/Presentation to Management.
• Effective use of Escalations & communication Templates for avoiding any delay in execution of jobs.
• Linking of Spares with their respective Assets in Maximo.
• Implementation of Preventive Maintenance Schedules (Time Based & Meter Based) in Maximo against respective Asset.
• Liaison with IT section for any kind of backhand support regarding Maximo

Project Coordinator à Descon engineering ltd
  • Pakistan - Lahore
  • octobre 2012 à avril 2016

• Preparation activity vise / Level III & Level IV Plan before starting the Project by using Primavera-P6
• Progress update the Project by using Primavera-P6
• Project Monitoring & Controlling
• Prepare the KPI, Risk register, BCTC Reporting to Project manager.
• Invoices & recovery plan
• Equipment erection & commissioning planning as per Schedule.
• Set work program and target milestones for each phase based on the project plan.
• Maintain and record update of site work progress obtained from Site In charge.
• Managing project budgets and implementing cost-saving actions keeping costs down
• Consolidate Material as per Drawings (mechanical, piping etc.)
• Participate in project meetings and discussions with the Client as required.
• Assists in preparing work program, cash flow and manpower histogram for tenders
• Overseeing the review, initiation and execution of contracts.
• Interaction with relevant engineer to resolve various issues related to Drawings or Production aspects
• To handle procurement activities of engineering and non-engineering items with respect to quality requirements.
• Logistic (Loading, dispatch and unloading) the raw material and final job
• Responsible for the completion of all documentation
• Generate the material Codes by SMART & Ordering by Using SAP.
• Performs other duties and responsibilities as may be assigned from time to time
• Coordination in commissioning of power plant turbine at Gadoon site.

Asst supervisor à royal engineering services
  • Pakistan - Lahore
  • juin 2012 à novembre 2012

supervision of structure and piping work

Éducation

Diplôme, engineering drawing, workshop practice ,welding
  • à PBTE lahore
  • juin 2012

i have three year Degree DAE, diploma of associate engineering in mechanical , after DAE i become a part of Descon engineering ltd in project managment

Specialties & Skills

Plant Maintenance
Primavera P6
Project Management
Plant Maintenance
CMMS Maximo
SAP ERP
Drawings read (all types piping, mechanical,civil foundation,P&ID, HOOKUPS)
Computer skill :Primavera 6, SAP, SMART , MS Office
Turnaround & Project Planning

Langues

Anglais
Moyen
Urdu
Expert

Adhésions

EOB
  • OLD AGE BENIFIT
  • May 2013

Formation et Diplômes

Advance IT (Formation)
Institut de formation:
govt, SA degree college Ahmed pur east
Date de la formation:
June 2009

Loisirs

  • Research about new machines