تنوير Hussain, Lead Planning Engineer

تنوير Hussain

Lead Planning Engineer

Descon

البلد
باكستان - لاهور
التعليم
بكالوريوس, Bachelor of Technology Hon’s (Mech.)
الخبرات
15 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 10 أشهر

Lead Planning Engineer في Descon
  • باكستان - لاهور
  • أشغل هذه الوظيفة منذ أبريل 2018

Project: Maple Leaf Cement Plant Line-III.
Client: Maple Leaf Cement Factory Ltd (MLCF).
Scope: The supply and setting up of engineering and equipment of complete cement plant from M/s. FLSmidth A/S Denmark. the Civil, Mechanical & Electrical construction works of Maple Leaf Cement Plant Line - 3, having a 7000 TPD capacity at Iskanderabad, which is one of the largest capacity cement plants in Pakistan.

Lead Planning Engineer في SPEC
  • باكستان - كراتشي
  • سبتمبر 2017 إلى أبريل 2018

Project: Gambat South Gas Processing Facility (GPF-III).
Client: Pakistan Petroleum Limited.
Scope: The scope of the project is Engineering, Procurement, Fabrication, Construction and Commissioning (EPCC) of the Plant. Upon completion, this facility shall produce 60 MMSCFD of processed natural gas, 11 mt/day LPG and 1050 barrel /day of Condensate.

In-Charge Planning في Zealcon Engineering (Pvt.) Ltd
  • باكستان - لاهور
  • أكتوبر 2014 إلى سبتمبر 2017

Project1: DG Khan Cement, Hub Baluchistan.
Client: DG Khan Cement
Scope: The plant of European origin. Pyro process is obtained from FLSmidth of Denmark. Cement Mills, Coal Mills and Raw Mills are planned from Loesche GMBH of Germany. Packing Plant also from German Haver & Boecker. The constructing of new plant for DG khan cement a renowned cement producer in Pakistan, the capacity of new plant is 9000TPD and is one of the largest cement plant in Pakistan. Scope of work comprises of complete mechanical and electrical works.

Project2: Nashpa OGDCL Gas.
Client: HPB China.
Scope: The execution of Civil, Mechanical and Electrical & Instrumentation works at Nashpa Gas processing and LPG recovery project. Present strength of manpower at projects is more than 800 works for the construction of Concrete, Buildings, Roads, Structural and piping works, tanks and equipments erection and Electrical & instrumentation works.

Project3: Maramzai-03 & 04, Makori East-04 & 05, Mardankhel-01 & 02 wellhead Surface Facilities and Mardankhel-1 tie-in works at Makori GPF & Manzalai CPF Project.
Client: MOL Pakistan Oil & Gas Company B.V
Scope: The scope of the project is Engineering, Procurement, Fabrication and Construction (EPC) of the six well head surface facilities and two wellhead tie-in works.

Project4: UEP Naimat Phase V Project.
Client: United Energy Pakistan
Scope: The scope of the project is mechanical works including Sandblasting & Painting and Grouting. Power Generation works including cable laying, Panel installation, Cable Tray & Earthing Works. E&I Works at completion 160 MMcfd processing capacity.

Project5: Engro LNG Terminal .
Client: Engro Corporation Limited.
Scope: Pakistan’s first LNG terminal. Zealcon’s Scope included EPC and Commissioning support services for Civil works, Equipments & Piping Installation, Electrical & Instrumentation Works, Up-gradation of Electrical Power Network, Commissioning Support. The project was completed in record time of 22 weeks
Shut-down/Turnaround1: Mardankhel-1 tie-in works at Makori GPF & Manzalai CPF Project for MOL, Pakistan
Client: MOL Pakistan Oil & Gas Company B.V
Scope: Mardankhel-1 tie-in works at Makori GPF & Manzalai CPF.
Shut-down/Turnaround2: Gas Processing Facility (Makori GPF) for MOL, Pakistan
Client: MOL Pakistan Oil & Gas Company B.V
Scope: Makori GPF maintenance for 21-days after damage of vent stack, Knock out drum and piping, steel structure etc.
Shut-down/Turnaround3: UEP Naim Phase IV Gas Processing Facility at Tando Adam
Client: United Energy Pakistan
Scope: Repair and maintenance of piping, equipment and steel structure etc.
Shut-down/Turnaround4: UEP Naim Phase V Gas Processing Facility at Tando Adam
Client: United Energy Pakistan
Scope: Repair and maintenance of piping, equipment and steel structure etc.
Shut-down/Turnaround5: UEP Gas Processing Facility at Hyderabad (Rural)
Client: United Energy Pakistan
Scope: Repair and maintenance of piping, equipment and steel structure etc.

Planning Engineer في Khaled Juffali Industrial Company
  • المملكة العربية السعودية - رأس الخير
  • فبراير 2013 إلى سبتمبر 2014

Project: Ras Al Khair Power Plant and Desalination Plant Phase-1.
Client: SEPCO III Electric Power Construction Corporation.
Scope: The project comprises a 42” pipe line, Gas receiving station and combined cycle co-generation power plant (Phase-1) having five(5) Blocks of combined cycle Units, each block in 2 GTG+2HRSG+1 STG configuration and One block of Simple cycle with 2 GTG units, with a plant capacity of 2, 700MW. The scope of the project is mechanical works including Equipment Installation, Piping, Steel Structure, Sandblasting & Painting and Grouting.
Shut-down/Turnaround: Ammonia Plant
Client: Maaden Saudi Arabia Mining Co., Saudi Arabia
Scope: Maaden Phosphate Co. will shut down its ammonia plant at Ras Al Khair for a 14-days repair and maintenance period.

Project Control Engineer في Albario Engineering (Pvt) Ltd
  • باكستان - لاهور
  • نوفمبر 2009 إلى فبراير 2013

Project1: Muridke 234 MW CC Power Plan
Client: Sapphire Electric Company (Pvt.) Ltd.
Scope: With a combined cycle power plant capacity of 234 MW. The scope of the project is completed Electro-Mechanical Works.

Project2: Guddu 747 MW Combined Cycle Power Plant
Client: Harbin Power Engineering China.
Scope: AEPL is a strategic partner with Harbin Engineering, China for projects in Pakistan and working with them as Contractor for Electro-Mechanical Scope at the ongoing 747 MW CCPP Guddu. The Project will be commissioned fully in end 2014 and will be the most efficient CCPP in Pakistan, based on GE 9FA Gas Turbines.
Shut-down/Turnaround: 2402 MW Thermal Power Station Guddu for WAPDA, Pakistan (AEPL)
Client: WAPDA, Pakistan
Scope: AEPL is a strategic partner with GE, USA for power plant turnaround in Pakistan and working with them as Contractor for repair and maintenance of gas turbines, heat recovery steam generators and steam turbine.

Asst. Planning Engineer في International Fabrication Company
  • باكستان - لاهور
  • أغسطس 2008 إلى نوفمبر 2009

Project: Bestway Cement Farooqia.
Client: Bestway Cement Limited.
Scope: The design & supply by KHD Germany/Upgrade by FLS Denmark, The scope of the project is mechanical works including fabrication and erection of crusher, Pre-heater, Kiln, Cooler and Cement mill areas.

الخلفية التعليمية

بكالوريوس, Bachelor of Technology Hon’s (Mech.)
  • في Preston University Karachi
  • فبراير 2012

Specialties & Skills

Project Planning
Primavera P6
Cost Control
Progress Monitoring
Scheduling
Project Control
Cost Control
Project Management
Project Coordination
Budgeting
Project Estimation

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

التدريب و الشهادات

Business writing & Communication Skills (تدريب)
معهد التدريب:
ITC
تاريخ الدورة:
February 2019
المدة:
24 ساعة

الهوايات

  • Book Reading