Tariq  Al Badri, Engineer II

Tariq Al Badri

Engineer II

Petrofac

Location
Oman - Muscat
Education
Bachelor's degree, Mechanical Engineering
Experience
2 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :2 years, 2 Months

Engineer II at Petrofac
  • Oman - Salalah
  • October 2015 to November 2017

Petrofac International Ltd (2015-to date)

Current Designation (Engineer III, Mechanical) (2016- to date)
Project 1- Rabab Harweel Integrated Project (RHIP), 4.5 billion USD, Petroleum Development of Oman (PDO), Sultanate of Oman

• Key elements of the Projects
Facilities/process
- 2 Phases Project involve engineering and construction
- Sour gas processing facilities with an inlet capacity in the order of 16.5 MMsM3/d
- Production of Gas/Condensate via Miscible Gas Injection (MGI)
- Liquid Recovery via Partial Recycling
- Inlet Separations
- Condensate Dehydration/Stabilizing and Storage
- Flash Gas/Acid Gas/Export Gas Compressors
- Condensate Export Pumps
- Seep Water Disposal Pumps
- Gas Treatment Units
• Scope of project work
- Piping Erection and Fabrication-740000 WId
- No of Equipment (Rotary, Static)-460
- Equipment scope in terms of weight-50000 MT
- Structural Fabrication and Erection-32000 MT
- MCO for Piping-like CS, LTCS, SS, Inconel 625 and 825, DSS and CLAD Piping HRB-825 and Weld Overlay-625, GRE and Electro fusion welded HDPE Piping

• Responsibility and achievements
- Reviewing piping test packs
- Line walk down with piping construction team for checking line before hydrotest
- Handling test packs before submitting to release them for hydrotest
- Line re-instatement after hydrotest and before submitting to pre-commissioning.
- Several QC inspections

Project 2- Yibal Khuff, EPCM, PDO, Oman

• Key elements of the Projects
The Yibal field is located approximately 300 km southwest of Muscat and 50 km southwest of the Fahud field. The Yibal Khuff project involves the integrated development of the Upper Khuff, Lower Khuff and Sudair reservoirs located below the currently producing reservoirs in the Yibal field. The project includes development of wellheads, RMSs, flow lines/ trunklines, a Central Process Facility (CPF) and a Power Plant. The CPF includes: Inlet facilities, Liquid handling (Oil and Water Processing), Gas Treatment, Sulphur Recovery and Blocking, Utilities Complex.




• Responsibility and achievements

- Corroborates the data in the datasheet for centrifugal pumps
- Reviewing Technical Bid Evaluation (TPE)

Education

Bachelor's degree, Mechanical Engineering
  • September 2006

Mathematics , Chemistry, Physics

Specialties & Skills

CLOSING
ENGINEERING
LANGUAGES
LEADERSHIP
MATHEMATICS
MECHANICAL
MICROSOFT OFFICE
MICROSOFT WINDOWS
PHYSICS

Languages

Arabic
Expert
English
Expert