Trainee Electrical Engineer
Pakistan Ordinance Factory
Total years of experience :7 years, 3 Months
Working Areas: Power House, Electrical Distribution, Instruments and Electronics, Maintenance
Roles and duties: Microwave LOS survey for new link
installation for CM PAK Link Installation and alignment
of microwave antennas, Software configuration for new
installed links. Installation of RTN
FINAL YEAR PROJECT EXPERIENCE Wireless Automated Smart City: Designed a self -organized traffic congestion control system which was the basic application of Smart city. That application based on Wireless Sensing Networks (WSNs) and IOT. Traffic signals controlled between two intersections dynamically by using couples of infrared sensors on each road. IR sensors (to detect vehicles) interfaced with controller then controller interfaced with communication module. Those three devices made a single node for communication with base node. So, eight road nodes communicated in real time simultaneously with two base nodes to change traffic signs automatically and reduce traffic from high intensity road to low intensity road within efficient time. Backed up through external path if all roads highly intense.