Principal Specialist
KBR
Total years of experience :33 years, 11 Months
Schedule development and progression-Primavera, P6
•Cost Control-SAP, Excel, Earned Value, Spend/Manpower Curves
•Document Control-Documentum
•Capital Projects, Maintenance & Turnarounds
Units worked: Alky Poly, Blenders, Cat Cracker, CCR, Coker, Crude, Desulfurizer, Facilities, Hydrocracker, Piers, Power Plant, SHU, Sulfur, Utilities, Water, WWTP
Specialized Responsibilities: Tank Program; Dredging-Cooling Water Inlet Channel, Piers and Main Channel; DMSA Development & Repair
•Managed Small Capital, Tank Program, Turnarounds and Routine/Major Maintenance Projects from Design through Start-up.
•Developed work scopes, estimates, forms of accounts and project schedules utilizing Primavera (3, 5, 6 & 7), MS-Project, SAP, and Maximo.
•Created appropriate documentation (such as AFE’s) and present projects to corporate directors for approval and funding.
•Prepared bid packages evaluated and awarded.
•Procure material, services, and equipment.
•Coordinated and supervised projects to ensure the successful completion within the budgeted time and cost constraints with strong focus on safety and environmental considerations.
•Audited material receipts, invoices, and payroll.
•Formulated annual and long-range budget estimates.
•Initiated change orders for scope growth, engineering deficiencies and delays.
•Monitored, update and report project schedules and financial status.
•Initiated MOC's for changes in processes and introduction of new chemicals.
Planning & Scheduling/Project Controls Manager
Planned work order requests through Orbit, Maximo, and SAP.
•Developed and planned preventative maintenance repetitive work orders.
•Performed material take-off, initiated purchase requests for material, services & equipment.
•Expedited and received material. Distributed material to crafts & contractors.
•Developed pre-plans for confined space, hot work, fresh air, critical lifts, excavations, environmental issues, hot taps, line breaks, or other dangerous or unusual tasks.
•Held meetings with Operations, Fire & Safety, crafts & contractors directly responsible for performing tasks to seek understanding & consensus to promote safety, guardianship to the environment & an overall successful outcome.
•Planned, estimated & scheduled area turnarounds & major maintenance projects utilizing the CMMS system and/or Primavera (3, 5, 6) or MS-project.
•Prepared bid packages; evaluated and awarded.
•Supervised in-house & T&M/lump sum contractors.
•Developed & tracked KPI’s.
•Issued weekly schedules and permit requests to Operations for next day’s planned work schedule.
Projects were fibers and pharmaceuticals.
Contractor with DuPont and BE&K) - Projects included chemicals, polymers, fibers, Savannah River (Nuclear), Conoco, and cogeneration.
•Developed P&ID's, flow diagrams, equipment & piping layouts, 3-d model, isometrics, and hanger/support details.
•Performed electrical and instrumentation drafting/design.
•Utilized various design tools such as Intergraph, Microstation, PEGS, Autoflow / Engines, Aspect/Vantage, AutoCAD 2000 and PDMS.
•Was PEGS and Autoflow / Engines (later Aspect/Vantage) Administrator.
•Supervised, trained, mentored, and evaluated design staff (10-20 employees).
•Coordinated and supervised field construction.
•Conducted field surveys and performed as-builts.
•Developed schedules, estimates and budgets utilizing Excel and Primavera.